Reclamation of land through the filling of material comprising clay, silt, sand, gravel or stone on a site having an area of 11.24 hectares, for the purpose of improvement of land for agricultural use, with the retention and use of existing site access road and wheel wash, all constructed by reference to PRR 18/74 together with temporary haul road and other ancillary site works including portable office/chemical toilet. The proposed development relates to an activity which requires a waste licence
Construction of new two storey rear extension, internal layout changes to existing section of dwelling, removal of existing septic tank, new wastewater treatment unit & soil polishing filter and associate works
Demolition of the existing attached garage and existing extension and for the construction of extensions to the side and rear of the existing dwelling and to upgrade the effluent treatment system to current EPA standards and all ancillary site works
Reclamation of land through the filling of material for the purpose of improvement of land, together with site access and ancillary works granted under PRR No. 18/74
The reclamation of land through the filling of material comprising clay, silt, sand, gravel or stone on a site having an area of 4.41 hectares, for the purpose of improvement of land, together with site access and roadway and other ancillary site works. The proposed development relates to an activity, which requires a waste licence
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto public road, block up existing entrance onto road and associate works
Construction of a 5m high ball wall, fenced enclosure with synthetic grass surface
The construction of a bungalow with garage, new entrance off existing lane, new treatment system and percolation area to current EPA standards and all ancillary site works
Deposition of soil and stone over an area of c. 1.56 ha for the purposes of land improvement with an agricultural end use
2 no. single storey extensions to rear and side of existing house with ancillary works
Existing extension to side & rear of existing dwelling and Permission for new single storey rear extension, alterations to fenestration, addition of rooflight to front elevation & upgrade of waste water treatment system
Renovate and reinstate existing abandoned residential dwelling to include reinstatement of roof structure. Permission is sought to make alterations and to erect an extension to existing abandoned dwelling. Permission is sought to install wastewater treatment facilities to current EPA standard and sink a new bored well water supply and and all associated site and ancillary works
Single storey 39.825 sqm living are extension to side of existing bungalow, RETENTION for 78.28 sqm large plus, plus 2 no 24.6 sqm and 4.05 sqm smaller sheds, attached to front of large shed (total 106.93 sqm). All sheds are used for domestic storage / workshop use only, the large shed also accommodates stabling comprising of 2 no pony stalls. PERMISSION to install a new raised percolation area, comprising of a coco pod to EN12566 standards, and 80 sqm attenuation layer in accordance with EPA 2009 Regulations at existing dwelling
Change of use (removal of planning condition no. 3 of planning ref. no. 04/113) from restricted use as a dwelling to use by all classes of persons
As constructed domestic garage located on site
Proposed new waste water treatment system to EPA standards to serve existing dwelling and associated works
Construction of a storey & a half dormer style dwelling, domestic car garage, wastewater treatment system, bored well & all associated site works
Bedroom at dormer level and associated works
Dwelling, wastewater treatment system to EPA standards, garage, entrance and associated works
A proposed replacement waste water treatment system to EPA standards in lieu of existing septic tank and associated works
The development consists of retention permission for existing small-scale eco-tourism development “Happy Place Stays” which includes an existing single storey log cabin (35.5sqm) and existing camping pod (28.9sq.m) (both as constructed). Retention permission for existing septic tank and percolation area and permission for connection of camping pod to same and all ancillary site works. The use of this accommodation shall be reserved for short term stays only and connected to the horticultural and farming activities established on site.
1. A timber hut (13.11sqm) to the west of the site. Permission is sought to connect to the existing septic tank and percolation area. 2. A yurt (19sqm) with an eco-compost toilet to the north of the site along with all associated site works. Retention permission is sought for: 1. An existing single-storey log cabin (35.5sqm) located south of the site (behind the existing cottage gardens). Currently not use. 2. An existing camping pod (28.9sqm) located to the west of the site (currently not in use). Permission is sought to connect to the existing septic tank and percolation area. 3> Retention permission is also sought for the existing septic tank and percolation area(which services the existing log cabin) located to the north of the log cabin, an all associated site works
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
A granny flat as constructed attached to existing dwelling, existing dwelling as built and domestic shed built on site associate works and permission for removal of existing septic tank, installation of new wastewater treatment unit and soil polishing filter, new site boundary and associate works
Construction of a single storey detached dwelling (with internal mezzanine area), well, effluent treatment system to current EPA standards, and all ancillary site works
An art & hobby room
A part single storey part two storey extension to the rear of existing dwelling along with a glass link connecting existing forge which is a Protected Structure to the existing house for use as in living accommodation and the insertion of a glass screen to the front elevation and for the upgrading of existing septic tank to a treatment plant with soil polishing filter and all associated site works
Bungalow, detached domestic garage, effluent treatment system in accordance with EPA 2009, and associated site works
The construction of a new dwelling, domestic garage, wastewater treatment unit & polishing filter, new well, new entrance onto public road and associate works
Proposal to replace existing unauthorised log cabin with farm house, garage & waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works
As constructed garage and location of effluent treatment unit
New dwelling, domestic garage, wastewater treatment unit and polishing filter, new well, new entrance onto public road and associate works
Removal of existing septic tank, installation of new septic tank, percolation area to current standards and associate works
For the completion of the partially constructed detached clubhouse and all ancillary site works, previously granted permission under Planning Application No. 17185
Single storey conservatory extension to the side and a two-storey extension to the rear of our home. Permission to: a) demolish our existing garage and replace with a new garage and domestic workshop in the same location, and b) to build a new home office and gym in the rear garden c) construct a ground mounted 20 panel (30sqm) photovoltaic array in the rear garden d) along with all associated site works. Clara House is a protected structure
Construction of a new single storey detached dwelling, with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well, and all ancillary site works at a site
Existing single storey two bedroom pitched roof dwelling and permission to carry out renovation and extension works to include the following: (a) construction of new first floor bedroom and ensuite extension with new stairs and a solar PV array on the roof of approximately 6 sqm (b) alteration and replacement of the existing bay window to the south elevation (c) alteration of the existing entrance porch to integrate into the new extension (d) alteration and replacement of porthole windows on the west elevation with new rectangular windows and the installation of new French door to the garden (e) along with associated site works
Short term retention of unauthorised log cabin to allow for family farmhouse, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works. To be completed. Granted under PP 21/346
Replace existing unauthorised log cabin with Family Farm house, garage and waste water effluent treatment unit to current EPA standards, bored well and pump house and all associated site works.
Demolition of existing rear extension, blocking up door and window in existing front porch, two new velux windows in existing roof, construction of new rear extension which can be seen from the front of the dwelling, new domestic garage, new wastewater treatment unit & soil polishing filter, upgrading of existing entrance, blocking up of existing entrance and associate works
Improvements to existing vehicular entrance and installation of new wastewater treatment system and soil polishing filter
Demolition of 38.3 sqm area to side of existing dwelling, new side extension to existing dwelling, removal of existing roof, new roof to be raised in height over existing dwelling and extension creating upstairs living area, creation of a granny flat within the footprint of dwelling, new wastewater treatment unit & soil polishing filter, removal of existing septic tank and associate works
1. New single storey toilet block and store rooms extension to rear of existing public house. 2. Conversion of existing stone building to side of public house to lounge/ bar use with alterations to elevations. 3. New vehicular access road to existing car park to rear of public house with additional car parking spaces and cycle parking. 4. New septic tank and percolation area to replace existing system. 5. New photovoltaic panels to front of public house. Retention permission sought for the following: 1. Existing entrance lobbies and ramp to front of existing bar and lounge to public house. 2. Existing smoking area with glazed canopy over to front of public house. 3. Existing signage to front of existing public house. 4. Existing vehicular entrance with splayed wall and piers to front to replace previous vehicular entrance. 5. All above with associated siteworks
The following developments: (a) a Christmas Village to include 8no. Log cabins for retail use, 2no. Open Shelter Barns, toilet block, Santa's house, animal barn, plant building and all ancillary works; (b) retention permission for 3no. Changing shelters and an Office building in the Fun Park and (c)planning permission sought for a universal access toilet and a wastewater treatment system for the Christmas Village development
A 198 sqm forestry storage shed, new septic tank and percolation area, new well, upgrading of existing entrance and associate works
The construction of a new dwelling, domestic garage, wastewater treatment unit & polishing filter, new well, new entrance onto public road and associate works
Detached, single storey, double garage next to the existing family residence
A dwelling, domestic garage and associated works as a change of design from previously granted permission under planning register number 21/1162
Proposed change of use (the removal of condition 2(a) of planning register reference 01/5292) from restricted use as a dwelling to use by all classes of persons
Consists of the continuation of use of an existing Waste Recycling Facility (previously approved under planning reg ref 12/6015 and 16/1434) to include acceptance, recovery and recycling of construction and demolition waste by crushing and screening of soils, stone, concrete and tarmacadam materials with a maximum annual throughput of 25,000 tonnes per annum. Permission is also sought for the continued use of mobile crushing and screening plant, stockpile areas, skip storage area, portable office and chemical toilet, and wheelwash and all ancillary activities necessary for the continuation of use of the development. The continued use of development will be subject to a waste facility permit