For to extend existing dwelling house, erect a garage with overhead storage/hobby room, connect to existing services and all associated site works
To demolish existing house and erect a replacement house, and garage with overhead storage, connect to effluent treatment system already approved by planning ref P23600 and all associated site works
For to demolish old "outhouses", extend existing dwelling house, install an effluent system, new entrance and all associated site works
To refurbish and extend the existing dwelling house, refurbish 2 no. attached sheds to the left and right of the existing dwelling house and incorporate into the refurbished and extended dwelling house, demolish and rebuild an existing stone building and incorporate into the refurbished and extended dwelling house, demolish a dilapidated shed, install a new wastewater treatment system, along with ancillary site works
For development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
To construct a two storey dwelling, site entrance, waste water treatment system and all associated site works
For the demolition of existing shed and construction of a single storey extension to rear of house together with all associated site works
The development will consist of one two-storey dwelling house, wastewater treatment system, percolation area, new site entrance, driveway and all associated site works
For development which will consist of a new dwelling house, site entrance, wastewater treatment system and associated site works
For the phased extraction of 2.9 hectares of sand and gravel over a period of 7 years, on land located in the townland of Ballymaloney. The proposed development includes for the provision of a new site entrance and vehicular access road; on site wheel wash facility; new drainage channel, silt fence and settlement pond; landscaping and buffer planting on the eastern site boundary including a 3m high embankment with hawthorn hedging adjoining the public road; and site restoration works. One passing bay is being developed for vehicular traffic on the public road leading to the site (L3022-8) in the townland of Ballyquin More
To erect a garage with attic hobby room for private domestic use and all associated site works
For to erect a garage / storage shed on site and all associated site works
For detached single storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area, bored well, connection to necessary services, new entrance together with all associated ancillary and incidental site works
Of existing shed as constructed for private domestic use and associated site works
To construct a private dwelling house, wastewater treatment system along with ancillary site works and to RETAIN an existing private bored well and pump house
For construction of a new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
To RETAIN alterations to elevations and roof of existing house together with all associated site works
For construction of new detached dormer dwelling, detached domestic garage, bored well, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
To erect a dwellinghouse, garage, entrance and driveway and install an effluent treatment system and soil polishing filter and all associated site works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
To convert St. Joseph's National School to dwelling house and carry out all ancillary site works
To erect a dwelling house, garage, entrance, install an effluent treatment system and percolation area and all associated site works
For the construction of a new two storey detached house, a single storey detached garage, a waste water treatment and disposal system, a bored well, a new site entrance and all associated works
For the construction of a new two storey detached house, a single storey detached garage, a waste water treatment and disposal system, a bored well, a new site entrance and all associated site works
To erect five dwelling houses, individual effluent treatment system and bored well for each house, public lighting and all associated site works
Of roadside boundary wall, pedestrian and vehicular entrances as constructed, change of site boundaries and all associated site works
To construct a vehicular entrance and all associated site works
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
To Extend the Appropriate Period of Planning Permission Ref:15/672 to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For change of house design from that previously granted under planning reference 15/672 and subsequently extended under planning reference 20/391, detached home office, entrance, onsite waste water treatment system, connection to necessary services together with all associated ancillary and incidental works
Of sheds on site as constructed
For detached single storey dwelling, detached domestic garage/home office, onsite wastewater treatment system and percolation are, bored well, new entrance together with all associated ancillary and incidental site works
For development which will consist of two detached two-storey, 4 bedroomed dwelling houses, septic tanks, percolation areas and all ancillary site works and external landscaping
For the construction of a new dwelling house, the construction of a garage, wastewater treatment system + percolation area, upgrading of an existing agriculture entrance to a dwelling entrance and all associated site works
For as constructed detached agricultural storage building, farm entrance and access roadway together with all associated ancillary and incidental site works
For retention of the existing 80 meter high temporary meteorological mast and all associated works for a period of 60 months
The development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works
To erect a dwellinghouse, garage, install an effluent treatment system and soil polishing filter and all associated site works
To construct a new dwelling house, detached garage, new waste water treatment system including all ancillary site service and works
To construct an extension to farmyard consisting of a cattle shed with underground slurry storage tank
Construction of single storey dwelling, new entrance, onsite waste water treatment system, bored well, together with all associated incidental boundary and site works
For the construction of a new front extension of 8.1m2, refurbishment of existing 14.0m2 Sunroom, new front porch and entrance steps, together with connections to existing services and all associated site works
To replace the flat roof on existing shop and store with an A type roof and to tie existing extension roof of main building to same.
To change the use of the public house to two self-contained apartments and retention permission for change of windows on front elevation of building
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a dwelling house, entrance, waste water treatment system and percolation and associated siteworks
Of existing developed attic for domestic storage
For development which will consist of a site boundary amendment to that granted under planning reference 09-261
To construct an Agricultural Shed and associated site works
To construct a 30 metre multi-user lattice tower telecommunications structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track