The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.
Opening ceremony of the Ireland Games comprising of a procession, ceremony, speeches and entertainment. Audient will include family members, supporters, sponsors and guests of Special Olympics Ireland.
1 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m.
Detached two storey, four bedroom dwelling in side garden with attic conversion with dormer roof to rear; new vehicular entrance & partial dishing of kerb.
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement truck wash out facility (1,237 sq. metres); and related ancillary works within a 4.2 hectare application area at the existing quarry. The new concrete plant will replace the three existing concrete plants on site, all of which will be decommissioned upon commencement of operation of the new plant.
Kelland Homes Ltd. and Evara Developments Ltd. wish to apply for permission for a Large-scale Residential Development (LRD) on a site located at Boherboy, Saggart, County Dublin. To the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate and Carrigmore Park, while to the south is the Boherboy Road. The proposed development consists of 611 no. dwellings, comprised of 306 no. 2, 3, 4 & 4-5 bed, 2 & 3 storey, detached, semi-detached & terraced houses, 133 no. 1, 2 & 3 bed duplex units in 12 no. 2-3 storey blocks, and 172 no. 1, 2 & 3 bed apartments in 5 no. buildings ranging in height from 4-5 & 5 storeys. The proposed development also includes a 2-storey crèche (c.630m²). Access to the development will by via one no. new vehicular access point from the Boherboy Road, along with new vehicular connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north. Ten no. houses in the south-eastern part of the site will be accessed from Corbally Glade to the east. The proposed development includes for pedestrian and cyclist connections throughout the proposed development and accesses into adjoining lands at Carrigmore Park, Corbally Heath and Corbally Glade to the east and Carrigmore Green to the north. Private amenity space for the residential units is provided in the form of rear gardens for houses and ground floor terraces / upper floor balconies for apartments and duplex units. The proposed development provides for a total of c.2.3Ha of public open space, and c.4,750sq.m of communal open space associated with proposed development. The proposed development also provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c.2.3Ha), (iii) communal open spaces (c.4,750sq.m), (iv) hard & soft landscaping and boundary treatments, (v) surface car parking (861 no. car parking spaces), (vi) bicycle parking (711 no. bicycle parking spaces), (vii) bin & bicycle storage, (viii) diversion of all existing overhead ESB lines underground, (ix) public lighting, and (x), plant / PV panels (M&E), utility services & 8 no. ESB sub-stations, all on an overall application site area of c.18.7Hha. In accordance with the South Dublin County Development Plan (2022-2028), an area of c.1.03Ha within the site is reserved as a future school site.
Development to the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate while to the south is the Boherboy Road; The proposed application represents the development of the entire Boherboy Neighbourhood as identified in the Fortunestown Local Area Plan (2012) consisting of 655 dwellings, comprised of 257 two, three & four bed, two & three storey detached, semi-detached & terraced houses, 152 one, two & three bed duplex units in 17 two to three, three to four & four storey blocks, and 246 one, two & three bed apartments in 9 buildings ranging in height from two, two to five, four to five & five storeys, and a two storey crèche (693sq.m); Access to the development will by via one vehicular access point from the Boherboy Road, along with proposed upgrade works to Boherboy Road to include the provision of a roadside footpath along the front of the site at the Boherboy Road, continuing eastwards to the junction with the N81 Blessington Road (for an overall distance of c.370m); The proposed development also provides for pedestrian and cyclist connectivity to the adjoining Carrigmore Park to the north-east, and vehicular, pedestrian and cyclist connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north; The proposed development provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c. 3Ha), including alongside the Corbally Stream, which will accommodate the provision of pedestrian / cyclist links to Carrigmore Park to the north-east, (iii) communal open spaces (c. 6,392sq.m), (iv) hard and soft landscaping and boundary treatments, (v) undercroft, basement & surface car parking (914 car parking spaces, including EV parking), (vi) bicycle parking (797 bicycle parking spaces), (vii) bin & bicycle storage, (viii) public lighting, and (ix), plant (M&E), utility services & 5 ESB sub-stations, all on an overall application site area of 18.3ha; In accordance with the Fortunestown Local Area Plan (2012) an area of c. 1.4Ha within the site is reserved as a future school site.
Replacement of a portion of the facade; removal of escalators and infill of voids at first floor (ex. mezzanine 93.5sq.m and second floor (ex. food courts 64sq.m); change of use of the mezzanine floor of the previously approved and constructed retail known as C4 to a Primary Care Centre (Class 8); change of use for ground floor, first floor and second floor of the previously approved and constructed retail unit known as Food Court, to a Primary Care Centre (Class 8); 6 external signage locations: (1) at unit C5 entrance (8.17sq.m); (2) at unit C4 entrance (9.36sq.m); (3) above first/second floors entrance (11.4sq.m); (4) to east elevation (6,25sq.m); (5) above unit C5 entrance (1.5sq.m); (6) above unit C4 entrance (0.75sq.m); the change of use area when completed will form an integral part of the previously approved Academic & Primary Care Centre (SD14A/0041, SD14A/0227, SD15A/0147, SD16A/0046 and SD19A/0158 at Tallaght Cross West, Tallaght, Dublin 24.
Change of use from education to office use within the existing building. No increase in area, external alterations or extensions are proposed.
Change of use of existing ground floor retail unit to a restaurant with ancillary take away option; related extract system venting out roof level and all associated site works.
3 externally mounted hotel signs which include: (1) a high-level wall mounted sign to the northeast facade complete with individual lettering and LED halo backlighting; (2) a double fronted suspended soffit sign with integrated LED lighting located adjacent to the main entrance at the northeast corner of the site; (3) a sign with integrated LED backlighting installed into the existing glazed facade located over the main entrance door to the north of the site.
For Blanket installation of photovoltaic panels (PV) over existing warehouse roof footprint circa 11,400m2 and all associated works. PV panels will not extend above parapet line. Permission is being sought as building is located between Baldonnell and Tallaght University Hospital Solar Safeguarding Zones
Full planning permission for construction of new detached 3 bedroom houses with new vehicular access and car-parking to front garden with all associated site works in the side garden.
Permission for construction of 2 new semi -detached 3 bedroom houses with new vehicular access and car-parking to front garden with all associated site works in the side garden of number 26 Cois Na hAbhann.
Construction of 2 new semi-detached 3 bedroom houses with new vehicular access and car-parking to front garden with all associated site works in the side garden.
Removing of existing garden wall and palisade fence along western boundary and for constructing a new 215mm tk. x 2.1m high rendered block perimeter wall complete with piers and concrete capping along south and west boundary to incorporate part adjoining site (area 481.3sq.m.). Permission sought for construction of 2 new semi-detached 3 bedroom houses to side (floor area to be 126.85sq.m per house, with a proposed ridge height of 8.325m above ground level), including 900mm deep bay window to front elevations at ground and first floor levels, single storey flat roof extended ground floor across rear and first floor windows to east and west elevations. Permission also sought for the construction of 2 new 3m wide driveway entrances with 750mm high block wall and 450mm.sq. x 1.2m high brickwork piers across front/n.east boundary, to form vehicle access onto new 6.15m long extended roadway across front of site, complete with dished footpath and kerbing to tie into existing, together with all associated site works.
Retention of existing garage conversion with raised pitched roof extended to rear over utility room and at front over hall door.
Single storey extension to the rear of home
Retention consists of the construction of a rooflight in the main roof to the front of the property.
We, KAVCO C TOWN PROJECT LIMITED, intend to apply for planning permission for the proposed development at the site, Cookstown House, Cookstown Way, Tallaght, Dublin 24. The proposed development consists of the following: modifications of the previously approved application SDCC Reg. Ref. SD23A/0237. The proposed modifications include a revised Ground-floor layout to convert the previous commercial unit, the adjacent refuse store and part of the previous communal amenity space into an additional 6 no. residential units as follows; 1 no. studio unit, 3 no. one-bedroom units and 2 no. two-bedroom units. The proposed changes will increase the total number of apartments from 80 no. units to 86 no. units. A recessed balcony has been provided to each of the proposed apartments. Minor modifications are to be made to the elevations at ground floor level only. There are no changes proposed to the height of the building. All with associated site works, bin and bicycle storage.
(a) Planning permission is sought for: (i) the construction of a residential development comprising a total of 84 no. apartments (40 no. one-bedroom units, 36 no. two-bedroom units and 8 no. three bedroom units) in a building ranging in height from 4 to 7 storeys (Part 4, part 5, part 7 storey building). Each apartment is provided with private amenity space in the form of a terrace or balcony space and has access to internal communal amenity space at ground floor level (265.54 sq.m); and external amenity space in the form of a designated communal open space area to the east of the proposed building, a central public plaza between the proposed building and the adjacent under-construction residential scheme at the Cookstown Gateway site to the north (ABP Ref. ABP-303803-19); and an external communal roof terrace at fifth floor level. A total of 190 no. bicycle parking spaces are provided at ground floor level to serve the development, including 2 no. resident bicycle stores comprising a total of 138 no. cycle spaces and 4 no. visitor bicycle parking areas at surface level comprising a total of 50 no. cycle spaces. The proposed development also includes: (ii) the provision of 1 no. commercial / retail unit (214.85 sq.m) at ground floor level with 2 no. staff cycle spaces provided internally; and (iii) associated site and infrastructural works which include; foul and surface water drainage; the provision of solar panels at the upper roof level; lighting; landscaping; boundary treatments; plant rooms; signage; footpaths and internal hard and soft landscaping; bin storage; and all associated site development works. (b) Retention permission is also sought for; (i) the demolition of the previously existing, pitched roof, derelict structure on site known as Cookstown House (88.4 sq.m)
Conversion of attic space to non-habitable space with dormer window to side & 'Velux' rooflights to rear of existing dwelling and associated site works.
Change of use from retail unit to unit for Day Care Centre use along with signage.
An amendment to the permitted commercial retail unit 2 at Blocks B/C as granted under ABP. Ref. 303803-19 and as amended under Reg. Ref. LRD23A/0006 and will compromise: i) the provision of an ancillary off-licence sales area of c. 29 sq.m within the permitted commercial retail unit 2 (c. 493 sq.m); ii) the provision of associated signage to the front elevation compromising 1 no. signage panel with backlit pin mounted lettering within the designated signage zone; internally illuminated projection sign; information signage and 1 no. internally illuminated sign over the customer entrance; iii) minor works including louvres to the rear elevation; new bi-parting doors, frosted vinyl, vinyl with graphic coverings and manifestations to glazing to the front elevation; iv) associated plant area to be provided at basement level; and v) all ancillary site services and site development works.
Change of use from existing restaurant use at ground floor to proposed office use (235sq.m).
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
Demolition of Leabeg, the existing single storey detached dwelling with single storey extensions to the rear including the single storey rear ancillary shed, boiler house shelter and removal of septic tank; existing the Priory building not affected by this application, as per previously granted planning permission SD15A/0202; demolition of ancillary buildings on the Priory site, including the single storey detached rear building, gas boiler enclosure, boundary palisade/timber fences that connect both sites and the removal of septic tank; construction of 10 one bedroom, single storey houses in three blocks consisting of Block A (Gross floor area: 204sq.m), Unit No.1, Unit No.2, Unit No.3, Unit No.4. - Block B (Gross floor area 205sq.m), Unit No.5, Unit No.6, Unit No.7, Unit No.8. Block C (Gross floor area 104sq.m), Unit No.9, Unit No.10; demolition of existing boundary fence and entrance walls along Kiltipper road to both properties; establish a new site entrance with new boundary fences, piers and automatic gates; new pedestrian entrance route with a proposed pathway from entrance to the housing units; construct a new boundary with automatic gates to the current Leabeg site entrance; provision for 10 car parking spaces, including 2 disabled car parking spaces and 2 electric car charging ports; new connected driveway layout, new bicycle stands, new enclosed bin stores, new landscaped gardens and paving areas, covered pergola areas and all ancillary site development works and site services; sites are covered under development plan housing strategy 2022-2028 H1 Objective 3 and housing strategy H1 objective 5 2016-2022.
Change of use of an existing single storey detached store (floor space - 154sq.m) to a research and development gas innovation workshop and store.
The development consists of; (i) retention permission for amendments to the previously approved development (ABP Ref. No. ABP-303803-19) including: (a) reduction of the footprint of the approved basement level, providing 67 no. car parking spaces and 316 no. bicycle parking spaces; (b) removal of Core C and the provision of a glazed link bridge at first floor level between the approved blocks C and D; (c) alterations to the layout, size and positioning of the internal communal areas, with all communal amenity rooms and communal facilities now consolidated at ground floor level (407.7sq.m); (d) alterations to the layout, positioning and a reduction in the size of the approved creche unit (from l9lsq.m to 182sq.m) and relocation of associated external play space at ground floor level; (e) omission of the previously approved office space, gym space and 2 no. apartments (previously approved Apartment 1 Block C and Apartment 6 Block D) at ground floor level and the provision of additional commercial retail floor space (increased from 248sq.m to 604sq.m) comprised within 2 no. commercial retail units and associated amendments to building line; (f) relocation of substation and switch room from the ground floor level of the previously approved Block D to the ground floor level of Block A and associated alterations to previously approved ground floor Apartments 2 and 3 in the approved Block D and Apartments 1 and 2 in Block A; (g) minor internal alterations within the approved Blocks A, B, C and D to accommodate 8 no. additional residential units in total (8 no. one-bedroom units) and a revised unit mix of 17 no. studio units, 88 no. one bedroom units, and 99 no. two-bedroom units, to now provide for 204 no. units in lieu of the permitted 196 no. units (ABP Ref. No. ABP- 303803-19). Retention permission is also sought for: (ii) minor alterations to the previously approved facades and building materials; and (iii) all associated development works necessary to facilitate the development.
Amendments to ABP Ref. No. ABP-303803-19 requested pursuant to Section 146B of the Planning and Development Act, 2000 (as amended), can be broadly described as follows: Alterations to the layout, size and positioning of the concierge/reception area, communal amenity areas, creche and two number commercial units provided at the ground floor and omission of the previously approved office and two number apartments to facilitate the introduction of a larger commercial unit capable of accommodating a small supermarket; Removal of Core C to facilitate the introduction of a larger ground floor commercial unit and reconfiguration of the Block C’s internal space across first to fifth floor levels and the introduction of a glazed link between Blocks B and C at first floor level; Reconfiguration of the approved basement layout; Amalgamation and consolidation of communal amenity space serving the development at ground floor level; Relocation of the substation and switch room previously proposed in Block D to Block A and associated alterations to previously approved ground floor Apartments 2 and 3 in Block D and Apartments 1 and 2 in Block A; Minor alterations to party walls in Blocks A, B and D to accommodate a number of one-bedroom apartments in lieu of previous approved studio apartments; Minor alterations to previously approved facades, building line and internal partition walls to accommodate the aforementioned amendments and a slight increase in the number of apartments featuring within the development, from 196 no. to 204 number units.
The installation of 6 no. 6m high floodlights around the existing pitch and associated site works and the retention of the existing pitch boundary treatment comprising 2.4m high painted metal mesh fence with access gates with 3m high netting above.
Retention permission for ground floor front extension with pitched roof over and 1 roof light on front slope of roof at attic level; permission for first floor side extension with pitched roof over and extension of attic room.
Construction of single storey extension to the rear of existing dwelling comprising of open plan Kitchen/Dining and Living space.
Proposed Side/Rear Single Storey Extension & Side/Rear Two Storey Extension with Associated Internal & External Alterations, Insert Ground Level Window Opening to North/East Side Facade, Relocate Side Landing Level Window Opening Along Side South/West Facade, Remove Chimney Stack, External Insulation System to all Facades with Associated Site Development Works to Detached Dwelling House
Retention consists of the construction of two rooflights in the main roof to the front of the property.
(i) Retention permission is sought for the mezzanine floor, stairwell and associated meeting room; (ii) (a) change of use of Unit F1 from cafe to car rental office and erection of partition walls to create a reception area, staff offices, staff mess area, wc, store room and staff canteen at ground floor; (b) upgrade works including replacement of mezzanine floor and stairwell; (c) installation of company signage to front of unit; and (ii) change of use from commercial car park to car rental and car share facility at basement level comprising of the following: (a) removal of 3 car parking spaces to provide for single storey car rental kiosk (28.82sq.m) comprising reception area; (b) redesignation of 30 commercial car parking spaces as car rental spaces (3 car club, 3 staff, 12 return and 12 rental spaces); (c) removal of 7 car parking spaces to provide circulation route, and car washing area (69.18sq.m) comprising 2 power washers, 1 wash pad connected to the existing petrol interceptor in the car park and car drying area. The car wash will connect to the mains water connection; (d) erection of company signage over entrance to car park from Belgard Square North; and (e) drainage and all associated site development and ancillary works necessary to facilitate development.
Construction of single storey detached garden room comprising of home office and gym.
Attic conversion with dormer roof window on existing hipped side of roof with 1 roof light on rear slope of roof, all at attic level.
The development will consist of the provision of a new glazed entrance lobby (24sqm) at the existing west entrance to the Square Shopping Centre (Level 3) and all associated site and development works.
Modifications to part of a previously permitted development under Ref. SD19A/0089; Permission is sought for the development of 3 two storey, three bed semi-detached houses, which will adjoin 4 permitted dwellings under SD19A/0089; access to the proposed development will be from a permitted vehicular access point off Elder Heath Avenue; all associated site development works, open space and landscaping etc. on a site of 0.156 hectares.
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.
Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works.
Retention of alterations to development permitted under Ref. SD12A/0190 including single storey rear extension; air conditioning units and associated flues to the west and east of the building; elevational alterations of the building including the installation of 2 fire escape external stairways and relocated openings; covered bicycle store and smoking area; car parking and circulation; all associated site works; permission is sought for the covering of the fire escape stairs with awnings; all development over an application site area of 0.57 hectares.
Attic conversion with dormer roof window on existing hipped side of roof with 1 roof light on rear slope of roof all at attic level.
Side/rear two storey extension and rear single storey extension to dwelling; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming pedestrian access gateway to side boundary wall with associated boundary treatment alterations and all associated site development works.
Side/rear two storey extension and rear single storey extension to dwelling house; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming vehicular access driveway off Carrigmore Meadows to side/rear garden with associated boundary treatment alterations site development works.
Installation of gate and replacement of section of existing railings with higher railings all at the Western Pedestrian Entrance to Marlfield Mall, Kiltipper, Dublin 24
1 x 50 KWp solar photovoltaic (PV) system on main office building. There will be a total of 156 PV panels on the main office roof and will occupy an area of 257sq.m.
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.