Scaffolding
Change of use of existing commercial building into 2x2 bedroom apartments, changes to all elevations and all ancillary site works
Proposed extension to dwelling
Installation of a new external ATM device through an existing window opening along the side elevation at Bank of Ireland, Main Street, Arklow, Co. Wicklow. The building is a protected structure
Construction of a single storey extension of 3no. Special Educational Teaching Rooms (floor area = 58.6sqm) to the front of the existing single storey St Peter Building (existing floor area = 979.0sqm), together with minor internal alterations and all associated site works
Demolition of existing derelict buildings (1292 sqm); construction of 99 residential units comprising 59 no. apartments with four blocks, ranging in height from 4 to 7 storeys (7 no. 1 bed units, 42 no. 2 bed units and 10 no. 3 bed units) and 40 no. 3 storey houses (20 no. 4 bed units); construction of a 350 sqm mixed use building of four storeys containing 350 sqm of retail space at ground floor and residential units above; refurbishment, extension and change of use from a derelict two storey house to a 146.3 sqm creche; refurbishment of the former Ormonde Cinema (Record of Protected Structure Ref. A39) for commercial use comprising 322.5 sqm office at first floor and 32 sqm office, 181 sqm lounge/café and 59 sqm café uses at ground floor; relocation of a Victorian letterbox (Record of Protected Structure Ref. A40) within the scheme; provision of public open space including a new amphitheatre, a new plaza, communal and private open space; provision of internal access roads with vehicular, pedestrian and cyclist access and new vehicular access onto Upper Main Street; 169 no. car parking spaces and 196 no. bicycle parking spaces provided at basement and surface level; realignment of Coomie Lane to create a new pedestrian links between Vale Road, Upper Main Street and the River Avoca walkway; all associated and ancillary site development works above and below ground, including signage, 2 no. ESB substations, alteration to existing landscape features, play area, sculpture, retaining walls, clearance works, landscaping, excavation, bin stores, boundary treatments and services provision
(S254) for a scaffold
New dwelling house & driveway, a packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards & a groundwater well together with required site and development works
Of 1) garden room and 2) garden storage building
Proposed new dwelling, upgrade to existing entrance, bored well, effluent disposal systems to EPA Cop 2009 standards and all associated site works
(1) retain structure as an independent dwelling unit (2) to retain alterations to building design as a change to that permitted under P14/91 (3) to retain revised boundaries as a change to that permitted under P14/91 and all associated site and ancillary works
The development will consist to demolish existing sub-standard shed/store of 28 sqm metres and to replace it with a new steel pvc coated shed/store of 39.6 sqm metres and associated works
Retention of dormer bedroom extension floor area 19m2 and retention of garage to rear of dwelling of 19.5m2 floor area
Construction of a two storey detached dwelling, new boundary treatments, new site entrance and all associated site works
Installation of a wastewater treatment system together with associated ancillary site works, RETENTION of a part first floor attic conversion including 8 no velux rooflight installations on both the north and north west facing roof slopes of the existing dwelling, and 1 no bedroom with dressing room and ensuite
Outline Reg Ref 23/444. The development will consist of a dwelling circa 191msq, a domestic garage, packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards, a groundwater well, together with all required site and development works
As-built commercial storage shed in lieu of the original substandard shed along with all associated site development works
Construction of 14 storage units, for active registered fishers (under license agreement), with internal dimensions of approximately 35 sq metres and associated siteworks including provision for connection to services and two concrete slab work areas approximately of 8 metres by 4 metres
A 36m² garage to the lower ground level of the north east elevation & Permission to erect a 16m² extension to the south east elevation and a 42m² extension to the north east elevation with alterations and revisions to the elevations and internal layout of the existing dwelling along with all associated site development works
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
• the omission of the previously permitted 4 storey Block 1, which comprised 19 no. apartment units (3 no. 1 bed and 16 no. 3 bed) • the reconfiguration of Block 2, increasing the number of units from 16 no. (13 no. 2 bed and 3 no. 3 bed) units to 18 no. (1 no. studio, 3 no. 1 bed and 14 no. 2 bed) along with reduction in building height from 7 to 6 storeys and associated elevation changes to balconies and window openings and provision of private open space and communal open space. • the omission of the previously permitted Block 3, which comprised 10 no. apartment units (9 no. 2 bed and 1 no. 3 bed), to be replaced with 3-storey 3 no. 4 bed dwelling units. • the replacement of 20 no. permitted 4 bed housing units along the riverwalk with 3-storey 32 no. duplex units (16 no. 2 bed and 16 no. 3 bed units) and associated services. • the relocation of surface car parking at the site to accommodate the provision of 3-storey 12 no. duplex units (6 no. 2 bed and 6 no. 3 bed units) and associated services. • reconfiguration of the permitted 146.3 sqm childcare facility, including alteration of associated private open space. • an increase from the permitted 810 sqm to 818.9 sqm of communal open space on foot of the amendments to the typology and mix proposed. • an increase from the permitted 4188 sqm to 4354.98 sqm of public open space on foot of the amended site layout. • a reduction from the permitted 169 car parking spaces to 162 car parking spaces and increase from the permitted 177 bicycle spaces to 203 bicycle spaces. • revised internal road layout to facilitate development associated with this amendment. • amendments to the drainage layout to reflect the proposed amendments. • all associated site development works, boundary treatments, landscaping, retaining walls, bin stores, bike parking and site services necessary to facilitate the proposed amendments
For modifications to the dwelling and site granted permission under Reg Ref 20/746. For (1.) A reduction to the overall subject site area.(2) A revised location for the approved dwelling site layout/entrance driveway. (3). A revised location packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards (4.) A revised location for a proposed groundwater well and all together with required site and development works
Demolition of existing building & structures and removal of existing syncrolift at the water's edge. Development to the south of South Quay will comprise the erection of a new building with a 4 storey element to the front, to a 2 storey at rear, to provide operation & maintenance facilities to support the operation of an offshore windfarm. The proposed building will consist of office, warehousing & welfare facilities & other ancillary uses associated with the offshore windfarm operation. Landscaped terraces are proposed at roof level at the 2 storey and 3 storey levels of the proposed building. A c. 40m lattice communication mast, associated with the proposed use, is proposed for the southern corner of the site. Car parking for 60 vehicles along with cycle parking for 26 bicycles & 5 motorcycles. An ESB substation is proposed to the south of the building. Waste & recycling storage is proposed on site. Vehicular & pedestrian entrance gates onto South Quay & pedestrian & bicycle entrance to the west. Security fencing around the site. Development to the north of South Quay will comprise a general area for the berthing of vessels to service the offshore windfarm. A pontoon is proposed along with up to 4 cranes for loading & unloading of vessels. Shore side storage is also proposed including 2 shipping containers, a bunded waste oil tank, a grey water tank, a treatment unit/equipment kiosk & 2 bunded fuel storage tanks. A blackwater tank is proposed below ground. Parking for 6 vehicles to the north & west of the site. A flood wall. Vehicular and pedestrian entrance gates onto South Quay & pedestrian emergency entrance to the west are proposed. Proposed to construct a ramp on the section of South Quay to tie in with flood wall. Access between the areas to the north & south of South Quay will be via a raised ramp along South Quay with controlled crossing across South Quay. New paving at this location and to the west of the building. Wastewater on site will be stored underground and removed to a treatment plant. Also proposes the dredging of approx. 6,000m3 of material from the nearshore area to provide for navigational depth, berthing area and manoeuvring area for vessels. Landscaping, utilities & other services proposed throughout the site & all other associated works. Applicant seeks 10 years in which to construct the development. An Environmental Impact Assessment Report & a Natura Impact Statement have been prepared.
Demolition of existing walkway building (60sqm), removal of external storage structure(65sqm), and construction single storey extension (Gross Area 326 Sqm) to east end of existing unit and all associated site works
Change of use from existing holiday apartment to permanent residence as apartment. Including all associated site works. This building is a protected structure NIAH Ref No. 16322033
Demolition of existing building, construction of a new, single storey dwelling; alterations and revisions to existing 54sqm garage and erect a 26sqm extension to side of same and upgrade the existing effluent disposal system to EPA standards together with all necessary ancillary site works to facilitate this development
7 no units (7 no 2 bed houses) and all associated site works
Change of use of existing first floor function room to offices and all associated site works
Extension 46.6sq metres to rear of existing mid terrace house 88.6 sq metres and demolish outhouse (coal bunker) 5.9 sq metres and alterations to existing mid terrace house and associated site works
Amendment to previous approved planning Ref. No. 21/557 for change of use of existing structure to childcare use, with increase in occupancy for approved 50 to 66, between hours of 7am & 7pm, with revised layout to include for the enclosure of approved first floor play-area to form additional ECCE room, relocation of play area to ground floor, with removal of section of roof, and amendments to elevations and all associated works
Hoarding/scaffold
(1) the change of use of 226.10 m2 section of the existing structure to provide School Aged Childcare rooms, a pre-school room and an Early Intervention ASD classroom, (2) the provision of raised parapet walls and a glazed guarding to the existing (front) single storey section to provide a 100.00 m2 play-area, (3) a window in lieu of a window (as access to the play-area) on the upper front (north)elevation, (4) the provision of a ramped access to the side (west) and (5) all associated works
Domestic garage on concrete base and associated works
A hoarding, fence or scaffold
1. Subdivision of existing dwelling No. 4 Glenview into 2No. two-bedroom apartments; 2. Extension to rear of existing dwelling; 3. Demolition of existing sheds to the rear of property; 4. Demolition of front boundary wall and relocation vehicular access location; 5. Site improvement works to provide car parking, new boundary walls to private gardens for No's 1 - 4 Glenview, public open space, connection to all services and all ancillary site works
The erection of 2 no. temporary prefabricated classrooms (circa 98sqm) and all associated site works
(A) the erection of 2 no. temporary prefabricated classrooms, all associated site works including connection to existing storm drainage and (B) continued use of existing school buildings approved under previous planning reference 11610047 & 20640
(1) erect a standalone information sign to the front of the building and (2) provide a new disability wheelchair access entrance to the front of the church as opposed to that approved under P.R.R. 21/1045 along with all associated site development works (The property is a protected structure)
Restoration of existing windows, reconfiguration of internal non-original partitions, provision of a new accessible entrance to the rear of the church, the provision of a new platform lift, provision of a raised floor to one portion of the main church space to unify the floor levels, provision of toilets, an accessible toilet and an associated lobby space, provision of a tea station, provision of a door into the courtyard garden, provision of a new access gate to the choir balcony and the addition of a safety handrail on the existing choir balcony.
Single storey extension to side of house and associated works
Demolition of 17.4sqm section of existing building, change of use of part (123.8sqm) of existing commercial building to residential apartment, velux windows and living space upstairs, internal changes to existing commercial area, new entrance to commercial section from St. Michael's Terrace, new entrance onto St. Michael's Terrace for proposed apartment and associate works
The following: 1. New two storey detached house 2. New vehicular entrance from Harbour Court Housing Estate 3. New pedestrian footpath linking existing footpath from Gussett Lane to Harbour Court Housing Estate 4. Connections to existing services 5. All above with associated siteworks
1. new single storey detached house. 2. new vehicular entrance from Harbour Court housing estate. 3. new hammer head/turning area from Harbour Court housing estate. 4. new pedestrian footpath linking existing footpath from Gussett Lane to Harbour Court housing estate. 5. connections to existing services. 6. all above with associated siteworks
Installation of 6 no. 16m high floodlights together with associated site works
Demolish an 8 sqm substandard structure to the rear of the existing building and erect a 6 sqm single storey rear extension to the ground floor and a 18 sqm first floor extension, make alterations and revisions to the elevations, roof and internal layout of the existing building and for change of use from all commercial to 1 no commercial unit and 2 no studio apartments along with all associated site development works
Construction of a building to display historic Coastguard horse drawn carriages previously used for rescue and ancillary works
1. Demolition of existing structures on site. 2. Construction of a new two storey modular office building. 3. Amendments to existing shed on site. 4. New vehicular entrance, car parking, storm and foul drainage and all associated site works
Extension of operating hours to include an afternoon session from 1.30 p.m. to 4.30 p.m. Monday to Friday
Permission for change of use from 2 no. commercial units to 2 no. residential studio apartments along with all associated site development works
Change of use from 2 No. vacant commercial units to 2 No. residential studio apartments along with all associated site development works