For (1) (a) Permission for the proposed erection of a Fertiliser Storage unit together with all associated site works, landscaping and ancillary services on site including (b) the removal of the existing septic tank on site, and the proposed installation of a new treatment system on site to cater for foul water from site (c) the removal of the existing attenuation tank on site and the proposed installation of a new attenuation tank on site together with installation of a Bypass Separator with Flume monitoring equipment on the discharge from the surface water drainage on site, and for (2) Permission for Retention of a water storage tank for fire fighting purposes, pump house, storage shed and external storage area for sawdust. An Appropriate Assessment Screening Report forms part of the Planning ApplicationDecision record indexed
For a laydown area for equipment and break bulk materials. The works will include earthworks, drainage, concrete paving, retaining walls and landscaping works. A Natura Impact Statement will accompany this applicationDecision record indexed
For a two storey extension and associated alterations, new vehicular entrance, new waste water treatment system and all associated site worksDecision record indexed
For the construction of a bulk store and associated site works. The store will be used to store port related products such as break bulk, bulk and unitised loadsDecision record indexed
Indefinite retention of 3no. existing single storey sheds and all associated site works. Outline planning permission is sought for a dormer style dwelling, proprietary waste water treatment system, forming of site entrance from existing drivewayDecision record indexed
For development. The development will consist of the installation of 5250 Solar PV panels over the roof of existing industrial buildings and all associated site works and servicesDecision record indexed
For a 7 year planning permission for a bulk store and associated site works. The store will be used to store port related products such as break bulk, bulk and unitised loadsDecision record indexed
For a Maintenance Building, roof mounted solar panels and associate site works at Belivew Port, the building is to provide storage for port vehicles, workshops for the maintenance and storage of port machinery and equipment, ancillary office accommodation and welfare facilities atDecision record indexed
For the handling and temporary storage of zinc and lead ore at an existing bulk store, and loading of the ore from the store onto ships from an existing Wharf. It is expected that the proposed development will facilitate the export of up to 210,000 tonnes of ore per annum. The works will include modifications to the existing bulk store and the addition of dust extraction from the bulk store building. The proposed development will also involve the use of telescopic material handling equipment on the existing wharf at Belview to facilitate loading of the zinc and lead ore onto Ships, along with associated site works. A Natura Impact Statement will accompany this application.Decision record indexed
For the refurbishment of the existing gate house / security office at the main entrance to Belview Port to include new external cladding and windows, and a proposed extension to the existing structure to add toilet facility and associated site worksDecision record indexed
For development at this site address. The development will consist of an ESB medium voltage (MV) Unit Substation and adjoining Customer Switchroom (an external footprint of up to 31m2, gross floor space of up to 19.5m2 and up to 3m in height) and all other associated site development works, including drainage and underground electrical cabling and ducting, required to facilitate the development. The substation development will be contained entirely within the boundary of the existing Belview Port and will use existing access arrangements within the port facility. The application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
Unit 2 Belview Port, in the townland of Gorteens, Co Kilkenny
For development, at Unit 2, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS).Decision record indexed
Unit 1 Belview Port, in the townland of Gorteens, Co Kilkenny
For development, at Unit 1, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS)Decision record indexed
For a 7 year planning permission for an extension to bulk stores and associated site works permitted by planning permission P.17/820. The stores will be used to store port related products such as break bulk, bulk and unitized loadsDecision record indexed
For water supply and foul drainage works including all pipes, valves, chambers, connections, a foul waste water pumping station and associated site worksDecision record indexed
To construct 3No wood based, biomass storage bays an ash storage building and associated site works including road widening to an existing internal road and a new concrete yard area. A Natura Impact Statement will accompany the Application. Smartply Europe currently hold an Industrial Emission Licence issued by the EPA.Decision record indexed
For the construction of a new roof on each of the previously granted concrete storage structures (Planning Ref 22/569). SmartPly Europe currently hold an Industrial Emission Licence issued by the EPADecision record indexed