Planning records
Showing 251-300 of 19,564 public recordsRetention Permission for the installation and use of a Coffee Trailer measuring 10.5 sqm and 2.6 meters tall on lands at the Shoreline Hotel.
1.Construction of an extension and internal layout modifications to existing dwelling, comprising of single storey lounge extension, 2. Glazed gallery link between existing house and extension (with a total extended floor area of 70.28sqm) 3. Replacement of existing septic tank with new wastewater treatment plant and percolation area and 4. all associated site works to facilitate the development at Shamu.
The development consists of a previous mobile home with no. 1 detached single-storey 3-bedroom dwelling, a gated vehicular entrance from the access road to the south eastern boundary of the site along with all associated site and engineering works.
The development consists of the development consists of the replacement of a previous mobile home with 1 no. detached single-storey 3-bedroom dwelling, a gated vehicular entrance from the access road to the south-eastern boundary of the site along with all associated site and engineering works.
The proposed development will consist of the following: a) Demolition of existing, detached single storey 2 no. bedroom residential structure (c. 47 m2 GFA). b) The construction of a new detached part single storey, part 1½ storey, 3 no. bedroom replacement dwelling (c. 163 m2 GFA). c) Proposed new 1.2 m high timber post and rail fence to part of side/west boundary and to part of front/south boundary and revisions to existing front entrance. d) Provision of hard and soft landscaping works. e) Provision of new soakaway design as per BRE 365 & C697. f) All associated site works. Additional Information Received 19/06/2025
The development will consist of the demolition of an existing one storey dwelling house and construction of a new dwelling in its place with associated landscaping including a proposed vehicular entrance, alterations to the existing vehicular entrance and alterations to the boundary wall. A Natura impact statement will be submitted to the planning authority with the application. AI received 17/05/23 SAI received 24/05/23
Permission for the demolition of an existing one storey dwelling house and construction of a new dwelling in its place with associated landscaping. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Permission to retain the changes undertaken within the circa 0.3-acre site of an established historic pre-1963 dwelling house. The proposed development seeks the retention of: 1. The retrospective demolition of a historic dwelling house and, in lieu, a replacement dwelling house, of low single- storey design, largely similar in design to the original removed dwelling house on site and located within the raised floor area floorplate of that historic pre-1963 dwelling house. 2.Small single-storey garage with a mono-pitch roof (20.4 sq.m. in floor area and 2.9 meters high). 3.Perimeter screen fencing, 1.9 meters in height along north, west, and east boundaries with timber gate entrance. 4. Upgrading of the existing wastewater system on site.
The proposed development willconsist of the demolition
Construction of new detached storey and a half dwelling house, with off street parking provision for 2no. vehicles, via shared vehicle access from Healys Lane, and associated site works. AI received 30/01/23
Planning permission is sought for
The development will consist of a single storey extension to the rear of the existing house, a new window on the north elevation, alterations to existing windows on the south and east elevations, 3 No. new rooflights, a new detached garage, demolition of existing covered storage area and all associated site works.
Permission for an amendment to the conditions attached to the existing permitted creche/montessori and outdoor education environment granted under Reg. Ref. F16A/0029 and Reg. Ref. F19A/0125. Planning permission is sought to amend the condition no. 3 of F19A/0125 and condition 5 of F16A/0029 which permits 11 no. children to now permit 22 no. children within the creche/montessori such that the maximum number of children to be accommodated within the creche shall not exceed twenty two (22). There are no works proposed as part of this application.
Retention planning permission for partially constructed chalet dwelling erected to replace existing chalet dwelling at existing site at Beach lane, the Burrow, Portrane.
Permission to demolish existing building, decommission existing Biocycle waste water treatment unit and percolation area, and for permission to construct an Agricultural Machinery Store and all associated site works. AI received 11/02/22
Permission for (A) revisions to previously approved planning permission under Reg. Ref. F21A/0436 and (B) Retention Permission on lands located at Hanna's Avenue,Corduff, Lusk, Co. Dublin, K45 X897. Retention permission is being sought for the following elements on the subject site. 1. Retention of as constructed vehicular entrance off Hanna's Avenue and 2.4 m high plastic coated, welded mesh fencing to site boundaries. 2. Retention of 12 no. 6 m high lighting standards and fitting within the subject site. Permission is being sought for the following: 3. Revisions to condition 6 under approved planning permission Reg. Ref. F21A/0436 to facilitate Plant Storage within the approved storage building. 4. Revisions to floor plan of approved storage building consisting of an increase in length by 6.67 m (additional 124.8 sq/m GFA). 5. Revisions to onsite foul drainage and surface water disposal layout consisting of revised SW layout and relocated foul drainage percolation area. 6. Provision of 6 no. car parking spaces and 2 no. bicycle parking spaces to serve the development. 7. Remedial landscaping works and all associated site development works necessary to facilitate the development. AI Received 14/02/2025 SAI Received 17/02/2025
The proposed development will consist of the following: 3 - Year Temporary Permission is being sought to facilitate the following: a. The use of the existing building on the subject site (304 m2 GFA) for 'Plant Storage'. b. Revisions to on - site foul drainage and surface water disposal layout consisting of revised SW layout and relocated foul drainage percolation area. c. Provision of 6 no. car parking spaces inclusive of 1 no. electric vehicle space. d. Provision of 2 no. bicycle parking spaces. e. Extensive landscaping works. f. All associated site development works. 3 - Year Temporary Retention Permission is also being sought to facilitate the following: g. Continued use of the subject site for 'Plant Storage'. h. As constructed vehicular site entrance off Hannas Avenue and as constructed 3 m high, plastic coated, welded mesh green fencing to site boundaries. i. As constructed 12 no. 7.5 m high lighting standards and fittings within the subject site. j. As constructed 4 no. mobile staff accommodation units (146 m2 GFA) together with associated site development works in north - west section of the site to facilitate continued regular weekly rest periods for staff members. k. As constructed 1 no. mobile canteen unit (16 m2 GFA). l. As constructed 1 no. mobile storage unit (7 m2 GFA).
The development will consist of construction
Part change of use of existing off sales & bar to a new coffee/ice cream shop & new restaurant & takeaway; the proposed works consist of the following: (1) A new 10.2 sq.m rear extension consisting of 2 no. new staff toilets, (2) Fit new retractable awning to the southwest (front) elevation, (3) 5 no. new illuminated associated signage to the southwest (front) elevation, (4) 5 no. new LED display lights to the southeast elevation with internal alterations & all associated site works. AI received 2/3/2022 CAI received 22/4/2022
The development will consist of:- 1) Retention of detached garage / store on site. 2) Retention of G.F. conservatory at the side. 3) Retention & relocation of single-storey timber structure on site as a children's playhouse. 4) Planning permission is sought for proposed conversion & extension / modifications to existing detached garage / store mentioned at 1) above to provide a single-storey family flat (Grannyflat), including existing attic storage with a link corridor to the main house & all associated works. Add Info received 10th January 2020.
Fingal County Council Planning permission is being sought for the following development: (i) The removal of the existing approved shared entrances serving 2 no. dwellings (ii) A replacement and relocation of new vehicular entrance and associated site works (iii) Reinstatement landscaping of existing and proposed located at Ballymadrough, Donabate, Co. Dublin. Applicants Tom Hanley, Audrey Hanley & David Butler Additional Information Received 25/08/2025
Retention Planning Permission is sought for development. The development consists of a single story, two bedroom timber log cabin with septic tank for use as a holiday home.
The proposed development will consist of: (i) Installation of new 4,750 lt aboveground self bunded fuel storage tank with Integrated Dispenser, II. Associated signage, III. All associated site development works. AI Recvd 20/1/25
Change of House Design for House Granted Permission Reg Ref F15A/0594 for a single storey development.Changes to include (a) flat roof with overall height of 3.565m in lieu of single storey pitched roof of 6.037m and (b)decrease in overall gross floor area from 276 sqm to 184.6sqm.
The proposed development will consist of the construction of a single-storey extension to the side of the house, incorporating two bedrooms, a playroom, and an en-suite. The house will now be a 4 bedroom, detached single storey dwelling. The proposal also includes the replacement of the existing wastewater treatment system with a new wastewater treatment system, soil polishing filter bed; a soakaway; together with all associated site development works necessary to facilitate the proposed development.
The development will consist of the extension and renovation of the existing dwelling at Shell Cottage including site works and the replacement of an existing septic tank with a proprietary wastewater treatment system. A Habitats Directive Appropriate Assessment Screening and a Natura Impact Statement (Stage 2) will be submitted to planning authority with this application.
NIS The development will consist of the extension and renovation of the existing dwelling including ancillary site works along with the replacement of an existing septic tank with a proprietary wastewater treatment system. A Natura Impact Statement (NIS) has been prepared and accompanies this application.
The extension and renovation of the existing dwelling
The construction of a detached, single storey garage for domestic use.
Proposed development consists of enabling works to facilitate the future development of Staffordstown Business Park and will comprise site clearance and profiling works to facilitate a new road on a site of approximately 0.85 ha. The proposed development consists of an approximately 445 metre long, 7.5 metre - 9 metre wide carriageway for the internal road layout to the future phases of Staffordstown Business Park and associated future industrial/commercial units (subject to separate palling application); a 1.5 metre footpath on both side of the road (approximately 980 metres in length) and grass verges. The road, grass verges and footpath will extend to connect to the existing road constructed under Reg. Ref. F07A/1477. The proposed development will also consist of a new watermain connection, proposed surface water drainage and foul sewer drainage connections and underground attenuation tank. The proposed development will include all ancillary drainage and site development works associated with the proposed development. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application.
Permission for the following: 1. Retention of an unauthorised garden shed (35.6m²) 2. Change-of-use of garden shed to home offices and 3. Extension of the shed building by 6.7m². Total Floor Area: 35.6m². Additional Information Received 5/5/2026
Planning Permission is sought for the construction of an additional bedroom and en-suite above the existing single-storey lean-to extension (c.26.3m2) and demolition of a single-storey shed and its replacement with a garage (c.22m2) and utility room (c.9m2) on the west side of the property and all associated site works.
Retention Permission for a stand alone 1.5 storey high annex office structure to the rear garden and all associated works. The ground floor consists of office space and storage space for the office at first floor. The sloping nature of the site results in the structure being single storey to the rear and 1.5 storey to the front of the unit. Rear access to the public road behind has been maintained.
The proposed development will consist of conversion and extension works to the existing garden centre facility comprising the following elements: 1. The construction of an extension (2160 m2 GFA) to the existing garden centre facility to facilitate the following: (a) The expansion of the garden centre sales area. (b) The relocation and expansion of the existing coffee shop/restaurant and associated kitchen, inclusive of the provision of new customer toilets. (c) The provision of new staff facilities comprising changing rooms, locker rooms, toilets, staff canteen and office at ground and first floor level. (d) The provision of an external landscaped garden to the rear of proposed coffee shop/restaurant. The proposed extension will consist of single and two-storey, flat and pitched roofs with heights varying between c.3.5 - 8.2 m high. 2. The conversion of the existing coffee shop/restaurant and associated kitchen to facilitate the further expansion of the garden centre sales area in its location. The total GFA of the proposed expansion of the garden centre sales area between this conversion and the proposed extension is 733 m2. 3. The construction of a 2.5 m high steel canopy sheltered area (228 m2 GFA) within the existing service yard located within the of the subject site. 4. The relocation of 2 no. existing polytunnels (578 m2 GFA) towards the eastern boundary of the subject site to facilitate the proposed extension works. 5. Alterations to existing car parking layout to provide 158 no. customer car parking spaces, inclusive of 9 no. accessible spaces, 16 no. electric vehicle parking spaces and 2 family parking spaces together with the addition of 15 no. new motorcycle parking spaces and 30 no. sheltered bicycle parking spaces. 6. Provision of new staff car parking area accessed via a new service road to the rear of the proposed extension comprising 27 no. new staff car parking spaces inclusive of 1 no. accessible space and 3 no. electric vehicle parking spaces together with the addition of 4 no. new motorcycle parking spaces and 20 no. sheltered bicycle parking spaces. 7. Provision of a new percolation area and provision of new surface water design including new detention basin to facilitate the proposed development. 8. All associated site and engineering works and landscaping works necessary to facilitate the development. Additional Information received 13/05/2026
1 1/2 storey dwelling measuring 271.sqm, single storey garage and associated site works including wastewater treatment facility and upgrade works to access road. Add Info received 1st March 2021. Add Info deemed Significant 11th March 2021. Revised Public Notices received 30th March 2021.
Alterations to existing dwelling house including demolition of existing extensions and new extension to rear of existing dwelling house along with all associated siteworks.
The construction of 2 no. industrial/ warehousing units on an overall applicable site area of approx. 6.25ha. Unit A consists of an industrial building of approx. 9,555 sqm with 638 sqm of ancillary office and staff facility space, together with 82 no. car parking spaces and 72 no. cycle parking spaces. Overall height of approx. 18.3m. Unit B consists of an Industrial building of approx. 7,775 sqm with 824 sqm of ancillary office and staff facility space, together with 83 no. car parking spaces and 48 no. cycle parking spaces. Overall height of approx. 15.3m. Approximately 445m long, 7.5m-9m wide carriageway for the internal road layout to the future phase of Staffordstown Business Park and associated future industrial/commercial units (subject to separate planning application). A 1.5m footpath on both sides of the road (approximately 980m in length); and grass verges. The road, grass verges and footpath will extend to connect to the existing road constructed under Reg. Ref. F07A/1477. The site and access road levels will be raised and compensatory storage provided. The proposed development will also consist of a new watermain connection, proposed surface water drainage and foul sewer drainage connections and underground attenuation tank. Together with all ancillary drainage and site development works associated within the proposed development. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application. The planning application and NIS may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, during its public opening hours. AI received 8/6/2023 AI deemed significant ** Revised Public Notices received 16/6/2023
Retention Planning Permission for single storey shed/gym and covered side access to side.
Construction of a new detached two storey, four bedroom house and garage, new vehicular entrance, new wastewater treatment unit and all associated site development works.
Permission for the construction of a new detached, two storey, four bedroom house and garage, new vehicular entrance, new wastewater treatment unit and alll associated site development works.
The development consists of the Proposed construction of a Circular Water Storage Tank and a Pump House for course irrigation purposes only and shall include landscaping and all associated site works. Additional Information received 09/02/2026
The development consists of (i) The Retention of Existing Office/Welfare Space, total area 52m², previously constructed inside the Existing Maintenance Shed and Permission for (ii) Proposed Change of Use from Agricultural to Commercial for proposed Office/Welfare spaces, total area 131 m², shall be constructed inside the Existing Maintenance Shed, (iii) Proposed construction of a single storey Extension to the side of existing shed, to accommodate Golf-Buggy Storage Shed, total area 140m², (iv) Proposed construction of a single storey Extension to the rear of existing shed, to accommodate Golf Simulator Building, total area 95m², (v) Proposed construction of Vehicle Storage Shed, total area 97m², (vi) Proposed Access Road for maintenance vehicles and Proposed Golf Buggy track, shall include all associated site works.
Planning permission is sought for a single storey
The development will consist of the construction of a 60 sq.m rear and side extension consisting of kitchen/dining/living area, a playroom and new bathroom. Increase height of existing flat roof by 600mm. Relocation of entrance at front elevation. The change of use of existing living room to bedroom. Demolition of existing concrete block shed, 15 sq.m. Replacement of existing septic tank with new waste water treatment plant and associated site works.
A free standing illuminated totem pole sign and all associated site works.
Permission for detached dormer dwelling with integrated single storey domestic garage to rear, on-site waste water treatment unit and percolation area, associated site works & utilising & upgrading existing vehicular access serving the site on site adjacent to existing family home. AI received 27/4/2022 AI deemed significant ** Revised public notices received 11/5/2022
Proposed ground floor front extension, installation of external wall insulation and window replacement.
Planning Permission for alterations to part of an existing granted planning application Reg. Ref. F23A/0034 for a proposed warehouse development with ancillary office and staff facilities at Staffordstown Business Park, Co. Dublin. The subject alterations for which planning permission is sought for are as follows: The development will consist of: amendments to the warehouse development permitted under Fingal County Council Reg. Ref. F23A/0034 to 'Unit A' only. The amendments principally comprise: 1. Change of area of the permitted structure (9,555 sqm warehouse with 638 sqm ancillary office and staff facilities) to 5,492 sqm warehouse with 914 sqm ancillary office and staff facilities with maximum height of 18.9 m. 2. Portion of rear yard to be used for external storage (3,919 sqm), 3.5 m high, of goods related to the construction industry, specifically drainage related products – pipes, manholes and surface water drainage components. Rear yard to incorporate HGV marshalling, loading and unloading plus related parking for own fleet vehicles. 3. Elevational alterations to reflect the proposed floor plans. 4. Provision of a ground level sprinkler water supply tank, 10m diameter, 9m high, to the eastern boundary, with an additional site area of 0.10 ha/0.24 ac to accommodate the tank, bringing the total overall development area to 2.53 ha/6.25 ac. 5. Provision of pump house serving the proposed water tank, 48 sqm, 2.8 m high, adjacent to the above referenced water tank. 6. Provision of an outdoor smoking shelter, 3.9 sqm, 2.68 m high to the western side of the proposed office block. 7. Relocation of the permitted covered bicycle parking to the eastern side of the proposed office block. 8. Rearrangement of the permitted car parking and reduction of the permitted spaces from 82 no. to 62 no., with additional 6 no. Motorcycle parking bays. 9. Provision of an ESB Substation, 33 sqm, 3 m high, to the front north boundary. 10. Modifications to boundary treatments, gates, external surface finishes, drainage and all associated site works above and below ground. All other details will remain as per the granted planning application Reg. Ref. F23A/0034. Additional Information Received 30/03/2026
Planning permission for: (A) Car port conversion to ensuite
Retention of the hardcore surface, boundary fencing,