Mono-pitch, single-storey extension to the front and side, conversion of existing garage to habitable space and installation of a rooflight to the side roof slope of the existing side extension; and provision of a new side gate to the rear garden.
The proposal outlined in this application involves the placement of a temporary ice cream trailer/stand within the premises of 8A The Mall, Main Street, Lucan Village, Lucan, Co. Dublin, K78 P9T0. The trailer/ stand will be positioned in the outdoor area between the existing retail unit frontage and the boundary wall on Main Street, Lucan. It's important to note that the proposal doesn't entail any alterations, fixtures, or modifications to the existing site. Measuring 2.0m x 2.5m, the trailer or stand is intended to serve pre-made ingredients, all of which will be prepared off-site. This approach not only supports sustainability but also minimizes impact, enhancing the visual amenity of the space, by reducing waste, promoting eco-friendly practices, and offering a unique and delightful experience for the community. The proposed trailer I stand aims to contribute positively to the vibrant atmosphere of Lucan Village, providing a convenient and enjoyable option for passersby while adding to the overall charm of the local area.
Attic conversion to non-habitable storage space; single storey pergola with glazed lean to roofing to rear of existing house with ancillary works (Strategic Development Zone).
Part single-storey, part two-storey rear extension incorporating internal ground and first floor modifications. Front porch extension and widening of the existing vehicular entrance, plus all associated site works.
(a) the material change of use from an office to a unit for day services use, to enable the provision of services to people with intellectual disabilities, (b) the installation of external signage and (c) all associated site works.
Change of use from a commercial office to a 1 bed ground floor apartment; Minor amendments to internal layout to first floor apartment; Configuration of existing first and second floor balconies as originally constructed, in existing three storey building.
Attic conversion including a dormer window to the rear and change of side roof profile from hip roof to half 'Dutch' hip with raised side gable wall.
Construction of a ground floor extension consisting of a playroom and bedroom with ensuite to rear of existing house.
Permission is sought for proposed attic conversion and dormer window to the rear of the property to include bedroom, ensuite and all other associated site works
The construction of a new 485 m2 crematorium within the grounds of Esker Lawn Cemetery consisting of a congregation space, 1 no. electric cremator and associated plant and services spaces, and the provision of visitor toilets, and ESB substation; provision of new car parking area and minor adjustments to existing parking resulting in the net addition of 2 parking spaces; amendments to existing site landscaping involving removal and reduction of existing hard surfaces and roadway surfaces and all associated works; the construction of new landscaping works including a contemplation pond, water feature, planted landscape berms and swale drains at the building perimeter and at the adjacent area designated for grave spaces under SD10A/0331 as part of a combined suds drainage and biodiverse planting strategy; temporary access for construction traffic to be provided from the eastern boundary, and the existing boundary treatment reinstated post construction.
First floor extension over existing walkway to the west of the existing building; all associated site works.
Demolition of a previously granted (S95B/0181) single storey domestic garage/shed to rear and the construction of new garage/shed space and family room/games room largely over the existing structure footprint and all associated works.
Demolition of a previously granted (S95B/0181) single storey domestic garage/shed to rear and the construction of a new single storey family annex unit with garage, largely over the same footprint as the original garage/shed unit and associated works; The annex will consist of one bedroom, combined living and kitchen area, WC and storage room; The roof will be mono-pitched with parapet walls and will house rooflights over kitchen and WC; Existing pedestrian and vehicular access points to serve the annex will be maintained.
First floor side extension with 'A' line feature roof over front first floor window, modifications to existing ground floor rear roof to change from a hip to a simple lean-to roof, new corbel chimney to front left side gable of the house, inclusion of roof light on main rear elevation roof, removal and block up of old en-suite window on right gable side elevations.
The development will consist of converting the existing garage to habitable space, including a small ground floor extension to the front widening the front door opening a single-storey rear extension a single-storey shed in the rear garden a pergola in the rear garden and all associated site and garden works.
The development will consist of an extension to the front of an existing house
Conversion of existing attic space to non-habitable storage/office area with new revised roof profile (from hipped roof to gable end roof) to side/rear, 2 roof lights to front elevation, 2 rooflights to rear roof elevation, ground floor extension to rear, new porch area to front with internal modification and associated site works.
Erection of 11 photovoltaic solar panels with an area of 910sq.m (with an average size of 85.8sq.m per panel) on the roof of the permitted three storey equivalent supermarket building (approved under Reg. Ref: SDZ18A/0015 and modified by Reg. Ref: SDZ19A/0006).
Two storey, three bedroom end of terrace house to side of existing house including alterations to existing boundaries for creation of a new vehicular access gate; adjustments to existing vehicular access gate and associated site works.
Conversion of existing attic space comprising of modification of existing roof structure; raising of existing gable c/w window and Dutch hip; new access stairs and flat dormer roof to the rear.
Demolition of an existing two storey detached dwelling (162sq.m) and associated out-buildings on site and the construction of 7 two storey (plus dormer level); 5 bedroom houses comprised of 3 detached houses and 4 semi-detached houses on a site area of c. 0.3ha; all associated site development works, car parking, open spaces and landscaping etc; proposed access to the development will by via the existing vehicular entrance on the Lucan-Newlands Road / Esker Hill.
Demolition of an existing storey detached dwelling (162sq.m) and associated out-buildings on site, and the construction of 8 2-storey (plus dormer level), 5 bedroom, detached houses, on a site area of 0.3ha. The proposed development also provides for all associated site development works, car parking, open spaces and landscaping. Proposed access to the development will be via the existing vehicular entrance gate on the Lucan-Newlands Road/Esker Hill at a site known as 'Clonbrone' on Lucan Newlands Road/ Esker Hill, Lucan.
Single storey extension to rear of house for lounge, recreational use and all associated site works within a Strategic Development Zone.
The Development will consist of the demolition of existing garage and the erection of one and a half story dwelling to the side of the existing Dwelling and all associated site works
Attached garage converted to habitable space, to include new front window, modified window on side elevation and new door on side elevation
Erect a 24 meter high lattice telecommunications support structure together with antennae, dishes and associated telecommunications equipment, all enclosed in security fencing; The proposed development is located within the curtilage of a Protected Structure.
Remove existing porch and replace with a new single storey garage to front of house; relocate front entrance door to side of new build and all associated site works.
Attic conversion Incorporating dormer extension to rear all associated site works.
3 storey 6 apartment unit, 1 semi-detached unit and 1 detached unit including car and bicycle parking facilities, bins and landscaping with new entrance gate.
The development will consist of demolition of existing shed, walls and ancillary structures, and construction of a new two storey dwelling and all associated site works
Domestic extensions and alterations to existing two-storey detached dwelling, comprising of removal of existing conservatory to rear, single storey extensions to side and rear; alterations to existing, including new roof over existing kitchen to rear, and alterations to side boundary wall, elevation changes and all ancillary works.
Change of use of existing first floor from existing office space to residential use to provide 1 five bedroom apartment comprising of removal of 2 sections of existing wall to the rear of the development along with removal of 3 windows to the rear at first floor level only to allow for proposed new door opes for access to proposed balcony area; removal of internal partition walls and the modifications to existing rear roof to allow for dormer extension for attic conversion; associated site works, bin storage and signage.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and 2no. roof windows to the front
Proposed ground floor extension to rear of existing house
The proposed development comprises the provision of a new access road (approx. 28.5m in length) to facilitate the creation of a future vehicular entrance to the site of Airlie House (a Protected Structure) from St. Helens Avenue; and all associated and ancillary site development works including the relocation of 6no. existing unallocated car parking spaces on St. Helen's Avenue to the new access road with associated landscaping and adjustment to existing St. Helen's Avenue road edge landscaping and footpath. This application is being made in accordance with the Adamstown Planning Scheme 2014, as amended, and relates to a proposed development within the Adamstown Strategic Development Zone Planning Scheme Area, as defined by Statutory Instrument No. 272 of 2001.
A pitched roof single storey extension to rear of existing house with associated site works
This application relates to development within the Adamstown strategic development zone (SDZ) and is subject to the Adamstown planning scheme 2014, as amended. Planning permission for modifications to the development permitted under Reg. Ref.: SDZ24A/0026W, which relates to permitted apartment Block E (currently under construction) at Hallwell within the Tubber Lane Development Area of the Adamstown SDZ, Tubber Lane, Adamstown, Lucan, Co Dublin. The application site is located to the south of Tubber Lane Road in the north-west of the Adamstown SDZ lands, east of the Celbridge Link Road, south of Hallwell Road and north of Shackleton Drive. The site is located in the southern part of the Phase 1 residential development permitted under Reg. Ref.: SDZ17A/0006, as amended under Reg. Ref.: SDZ18A/0005, Reg. Ref.: SDZ19A/0010, and Reg. Ref.: SDZ20A/0006. The proposed development comprises modifications to permitted apartment Block E to provide for 2 no. additional age friendly apartments, and will consist of the following: • Omission of permitted ancillary staff areas, and reduction and reconfiguration of ancillary communal lounge area at ground floor level and provision of 2 no. 1 bedroom apartments at ground floor level; • Minor modifications to the permitted building facades; • Minor modifications to the permitted site layout to facilitate 2 no. additional cycle parking spaces; • All associated modifications to landscaping, foul and surface water drainage, and services necessary to facilitate the development; • All associated site development and ancillary works. The proposed modifications will increase the total number of age friendly apartments within Block E by 2 no., from 22 no. to 24 no., and the total number of residential units within the permitted Phase 1 residential development, as amended, from 179 no. to 181 no. units.
THIS APPLICATION RELATES TO DEVELOPMENT WITHIN THE ADAMSTOWN STRATEGIC DEVELOPMENT ZONE (SDZ) AND IS SUBJECT TO THE ADAMSTOWN PLANNING SCHEME 2014, AS AMENDED.Hugh McGreevy & Sons Ltd and Tierra Ltd. intend to apply for planning permission at Hallwell within the Tubber Lane Development Area of the Adamstown SDZ, Tubber Lane, Adamstown, Lucan, Co Dublin. The application site is located to the south of Tubber Lane Road in the north-west of the Adamstown SDZ lands, east of the Celbridge Link Road, south of Hallwell Road and north of Shackleton Drive. The site is located in the southern part of the Phase 1 residential development permitted under Reg. Ref.: SDZ17A/0006, as amended under Reg. Ref.: SDZ18A/0005, Reg. Ref.: SDZ19A/0010, and Reg. Ref.: SDZ20A/0006, and relates to the site of the previously permitted Block E. The proposed development comprises 22 no. age friendly apartments and will consist of the following:•Construction of 22 no. age friendly apartment units (18 no. 1 bed units, and 4 no. 2 bed units) in a 5 storey apartment block (Block E), including ancillary communal and staff areas, private and communal open space;•Associated car and cycle parking, a pedestrian crossing, landscaping, foul and surface water drainage, and all services necessary to facilitate the development;•All associated site development and ancillary works. This application will supersede the previous permission for Block E (a 5 storey apartment block containing 18 no. apartments) under the Phase 1 residential development permitted under Reg. Ref.: SDZ17A/0006.The proposed development will increase the total number of residential units within the permitted Phase 1 residential development, as amended, by 4 no. from 175 no. to 179 no. units.
The demolition of an existing single-storey derelict building for the construction of a replacement two-storey 210sq.m. Four-bedroom house and a 25sq.m. Rehabilitation garden, to include the restoration of existing entrance piers and gates at existing access to Mount Pleasant (Hillsboro) House, to include boundary treatment and landscaping.
Permission for the refurbishment of the existing derelict vernacular dwelling (44m2) as part of a new house. The development totalling 97.8m2 will also see a new single-storey extension (53.8m2) to the rear of the existing dwelling. The proposed ground floor pf the dwelling, including the refurbished building will be made up of an entrance hallway, toilet, kitchen, dining/living and two bedrooms with one en-suite.
The development will consisit of the reconstruction of existing vernacular building as part of a new house. The development will see a new two-storey extension to the rear of the existing derelict building of 170m2. The proposed ground floor of the dwelling including the reconstructed building will be made up of an entrance hallway, living room, office, rehabilitation room, storage, toilet, pantry, utility, kitchen and dining room. The proposed first floor of the dwelling will be made up of two bedrooms, master bedroom with en-suite and walk-in wardrobe, bathroom and storage.
Construction of an extension to the side of existing building comprising a new two storey (plus partial basement) flat roof extension with new side entrance & stairs to access existing first floor & rear garden area with new wc at first floor. Retention of minor amendments to layout of basement apartment from previously permitted layout, Ref. SD20A/0231, for amended bathroom location; Retention & completion of internal alterations and change of use of ground floor from retail to restaurant use, to include alterations to layout from previously permitted layout ref. SD20A/0231 inc. removal of modern stairs and partitions & forming new WC facilities and servery area; Retention & completion of internal alterations and change of use of first floor from ancillary accommodation to office/shared work space use, to include alterations to layout from previously permitted layout Ref. SD20A/0231 inc. removal of walls & modern wc. Works also include retention & completion of all associated ancillary landscaping & boundary wall works to front area (Protected Structure).
Refurbishment of existing two bed apartment at basement level; alteration of existing window opes to basement level; re-opening of the existing windows to the rear elevation of the retail unit at ground floor level; incorporation of a new toilet at ground floor level; reconstruction of existing stairs to first floor; removal of existing steel roller shutters from exterior of ground floor retail unit and re-incorporation of same to interior of retail unit; installation of 2 awnings at ground floor level; refurbishment of existing interior retail units; incorporation of a new door on the ground floor eastern elevation to give access to first floor and the incorporation of a new access steps to this door from the front; removal of all existing uPVC windows and their replacement with timber sash double glazed units; refurbishment of existing paved area to the south and all necessary upgrading, repair, refurbishment and site works necessary to facilitate the development. (Protected Structure)
Extend the capacity of pre-school service from previous permission allocation of 13 children, to two classes of 15 children each, in the form of a morning (8.30am to 11.30am) and an afternoon (12.00pm to 3.00pm) session.
Revisions/modifications to previously permitted development SDZ21A/0003 to provide additional 2 houses ( 1 detached and 1 end of terrace unit) in Block C resulting in 14 units in lieu of the 12 permitted in Block C and the consequential adjustment of house types; overall increase in in unit number from 120 to 122 units; overall increase in gross floor area of 220.6sq.m from 11,189.4 sq.m to 11,410 sq.m; additional parking space to the west of Block B bringing the number of spaces at this location from 26 to 27 with the overall number of parking spaces approved under SDZ21A/0003 increased from 134 to 135; no changes sought to Blocks A and B; no other changes to the permitted layout are proposed; all associated site and development works.
Residential development (12,096sq.m) comprises of 128 dwellings (46 one bed apartments, 70 two bed apartments, 6 three bed duplex units and 6 four bed houses) arranged over 4 blocks as follows; Block A (4,049sq.m) contains 43 apartments, ancillary accommodation and associated balconies in a 4 to 5 storey block, comprising 11 one bed apartments and 32no. 2 bed apartments; Block B (6,096sq.m) contains 67 apartments, ancillary accommodation, communal open space and associated balconies in a four storey block, comprising 35 one bed apartments and 32 two bed apartments; Block C (1,181sq.m) contains 12 dwellings and associated terraces and gardens in a three storey block, comprising 6 three bed duplex units over 6 two bed apartments; Block D (770sq.m) contains 6no. four bed two storey houses and associated gardens; all associated internal roads, car parking (158 spaces), bicycle parking (122 spaces), bin storage areas, associated pedestrian footpaths and cycle paths, public open space, communal and private open space, hard and soft landscaping, boundary treatment and all associated site and development works; revisions/modifications are sought to a previously permitted section of Shackleton Drive (52m), permitted under Reg. SDZ18A/0002 to provide a signalized pedestrian and cycle crossing; minor modifications to the western edge of the North South Link Road permitted under Reg. SDZ18A/0015 are proposed to facilitate access to the proposed development; 2 goal-post gates for residents only parking are proposed on the internal roads located at the entrance to the car park for Block B and Block C (1 to the rear of Block B and 1 to the north of Block C) at a site (1.74 hectares) within the Adamstown SDZ Planning Scheme 2014 as amended (Tobermaclugg Village, Development Area 4), the current application site is referred to as Shackleton Phase 4 and is bounded by Shackleton Drive to the north, the existing Shackleton local centre to the east and Airlie Park to the south east.
Extend the existing tiled roof & ridge tiles to form a new 'Dutch' type roof structure, extend existing gable wall up to soffit level with 3 new windows, new rooflight in existing front tiled roof, new single storey extension to the side of the existing two storey, semi-detached dwelling, new two storey extension to the rear, convert existing attic area into a non-habitable area, internal alterations, external finishes to match existing & associate site works.
I, Hasan Kadhim, intend to apply for Planning Permission at the site at Airlie House,Tandy's Lane, Finns town, Lucan, Co. Dublin, which is located within the Adamstown Strategic Development Zone (SDZ). The proposed development comprises the renovation and extension of AIRLIE HOUSE (two-storey protected structure SDCC RPS REF.NO. 109 ) to provide a medical clinic facility that includes: Demolition of existing 2-storey extensions in the southeast corner and western elevations of Airlie House; Permission for change of use of the protected structure from use of existing dwelling to Medical Use (Class 8) with internal modifications and renovations to include consultation rooms, treatment rooms, storage, and nursing station; Proposed new two-storey side extension to the existing Airlie house that consists of the main reception, administration rooms, staff room, store rooms, consultation rooms, and other ancillary rooms; Site development works and landscaping works include boundary treatment, 26 car parking spaces with a set-down area in front of the new extension, Secured Vehicular access to the development is via the existing road network granted under Planning Reg. Ref. SDZ24A/0022W. Along with all other site works proposed on c. 0.2 hectares of the Airlie House lands.
Conversion of existing attic space to non-habitable storage/office area with new revised roof profile (from hipped to gable end) to side/rear, 2 rooflights to front elevation, 2 rooflights to rear roof elevation, internal modification and associated site works.