Footbridge from car park of university campus to Airton Close.
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.
(i) Alterations to existing roofs to include increasing roof height of one bay to match adjoining bay; (ii) new wall & roof cladding including louvred ventilation panels and translucent panels over existing cladding and to altered areas of buildings and extensions; (iii) provision of new roller-shutter doors to three existing opes and three new opes; (iv) demolition of three ancillary structures attached to the north side of the building and provision of four new single storey pitched roof structures attached to the north side of the building; (v) demolition of some existing wall and roof structures to the eastern end of the building, and the provision of new walls & roofs to form new areas of the high-bay plant/fabricating area with raised roof on parapet levels; (vi) demolition of a detached single storey plant building on the north-west of the site and storage buildings on the east of the site and construction of 3 new single storey detached plant and storage buildings; (vii) provision of new signage to the west facing elevation of the building at high level; (viii) all other associated siteworks & services to facilitate the development.
Retention for single storey building to rear garden for home office / playroom use and all associated site works.
Single storey extension to the rear and part side to the existing end of terraced two storey dwelling with a low pitched flat roof; two new windows in the existing gable structure; internal alterations and associated site works.
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Conversion of existing attic space to become habitable space and erection of a dormer to rear and all associated site works to facilitate same.
Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9: Enlargement of ground floor window at Unit 5-9 on the north elevation enlargement of first floor windows at Unit 5-9 on the south elevation. Planning permission is sought for: (i)The change of use of Unit 4 (of 292.5 sq.m), including that part at first floor (104 sq.m) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of Unit 4 with Unit 5-9 (1,505 sq.m gross) to provide a single office based industry unit of 1,797.5 sq.m gross together with all associated and ancillary works, including internal fit-out. (ii) At the south elevation of Unit 4: a. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. b. At first floor, 2 no. new aluminium/glass windows. (iii) 4 no. bicycle parking spaces, including provision for cargo bike.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Provision of 1 approx. 100sq.m single storey temporary prefab (prefab 01 comprising 1 classroom & 3 resource rooms) adjacent to the south-east boundary of the site and 1 approx. 70sq.m single storey temporary prefab (prefab 02 comprising 1 classroom) adjacent to the north-west boundary of the site and all associated site works.
Construction of a new approx. 592 sqm single storey extension to the Junior National School to provide a new SEN suite comprising 2 no. classroom bases, a central activities space, shower & WC facilities, ancillary spaces and a new external play areas and a new approx. 345 sqm part-two storey extension to the Senior National School comprising 3 no. en-suite new mainstream classrooms and 2 no. resource rooms. Along with a remodelled car park increasing the number of car spaces from 35 no. to 45 no. and associated site works.
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works.
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/numerals and illuminated elements to it's north and south sides and will be located at the east boundary of the site near the site entrance; associated works.
Change of use to the basement of the proposed Public House at Unit 7 of the previously granted permission Ref. SD16A/0060 as amended by permission Ref. SD19A/0044 to incorporate a kitchen and wc's and permission for modifications to the external facade of the same unit.
Single-storey, flat-roof front extension with two rooflights and a new side door at ground level.
Partial demolition of existing rear and side extension; construction of new rear and side extension with a new flat roof over the existing and new extension.
1. Construction of a two storey side extension with a gable ended roof to consist of a living room, WC and utility at ground floor and master bedroom with a walk-in wardrobe and a bathroom on the first floor. 2. Modifications to the existing side boundary wall for provision of a new pedestrian access exiting onto Kingswood Heights Grove. 3. Modifications to the existing front and side walls boundary treatments for provision of a new vehicular access including dished public footpath exiting on The Grove, Kingswood Heights. General remodel and partial upgrade of the existing dwelling to suit the proposed layouts. 5. All drainage, structural and associated site works to be implemented.
Ground floor & rear extensions with flat roof over; first floor side extension with pitched roof over.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
For the demolition of single storey pitched front roof and rear conservatory and construction of new flat roof to single storey front structure, new single storey rear extension and internal ground first floor modifications together with new dormer attic structure consisting of bedroom and en-suite, conversion of existing shed to games room with new front elevation window and new rear glazed doors and all associated works.
The installation of a 1.62m x 0.87m x 0.5m (HxWxD) gas pressure reduction unit and 3.25m (H) vent stack, with all ancillary services and associated site works.
The change of use and conversion of existing attic space to storage space with dormer window to the rear, hipped roof to new gable wall, with ground floor single storey extension to the rear, and conversation of the side garage to habitable space with minor alterations to the front elevation, internal layout adjustments and all associated ancillary site works at 30 Bancroft Avenue Dublin 24, D24 XWE0.
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Attic conversion for storage. Single storey front and rear extension. Widening of front vehicular access. Two Velux windows to the front roof area. Demolition of existing shed.
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms. The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level. The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road. New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Construction of new front door structure to front elevation; single storey rear extension extending existing kitchen space and widening of the existing front entrance pillars with new solid gates and associated works
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Permission to change the use of Unit 3 of Block 2, from retail to a medical practice as well as permission for associated signage area and all associated works to complete the development.
Extension of the existing depot to provide additional bus parking facilities comprising a total of 221 bus spaces (including 45 electric bus parking spaces), 33 car parking spaces (including 15 electric car parking spaces), 5 motorcycle parking spaces and 30 bicycle parking spaces; revisions to the layout and configuration of the existing bus and car parking areas; the installation of electric vehicle charging units and associated infrastructure; new vehicular entrance/egress arrangement (including barrier and ramp) to Ballymount Avenue on the north-eastern site boundary; the provision of 4 pedestrian entrances located on the south-eastern, south-western and north-eastern site boundaries; internal roads and pedestrian pathways; minor elevational amendments to the existing transport depot building (relocation and addition of roller shutter doors and relocation of signage); hard and soft landscaping; boundary treatments; changes in level; lighting; surface water drainage; piped infrastructure and ducting, and all associated site excavation and development works above and below ground. (The development will also include the underground diversion of the existing ESB power line traversing the south-eastern corner of the site.)
A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
Garage conversion; single storey rear extension; 2 'Velux' rooflights to the rear roof slope and all associated site works.
The refurbishment of Katherine Tynan House, or ‘Whitehall’, a Protected Structure (RPS ref.197), with change of use from disused dwelling to community centre. Works will entail refurbishment of the roof and external walls; reinstatement of windows and external doors; ceilings and floors; reinstatement of a conservatory and glazed porch (10sq.m and 5sq.m respectively); new internal stairs and doors; new services and sanitary accommodation; two new single storey open-fronted structures on part of the footprint earlier outbuildings with an enclosed area for toilets (534sq.m); refurbishment of historic garden walls and gates; upgrading of the existing non historic entrance and approach from the Ballymount Road; and provision for parking on site.
Convert existing detached single storey garage to rear of existing dwelling into gym and office along with associated ancillary works.
Change the use of Unit 1 of Block 3 to a veterinary clinic as well as permission for signage areas. Retention of a new entrance door on Block 3; sub-division of Unit 1, Block 2, in to two units (1a and 1b) and the change of use to a barber (Unit 1a) and takeaway (Unit 1b); new signage zones; all associated works to complete the development.
The removal of the existing fence and vegetation. The construction of a new single - storey ESB substation (15.2 MS) Raising the grade outside the substation entrance, the erection of a new replacement security fence. And all associated landscaping and site development works
Retention of Change of Use from Light Industry / Warehousing and Ancillary Office to Office, and Retention of Amalgamation of Unit E1 (total G.I. area of 317.40m²) with Unit E14 (total G.I. area of 294.50m²), to achieve a total amalgamated area of 617.4m², all located at Block E, Calmount Park, Ballymount, Dublin 12, D12 X854.
Single storey front & side porch extension with tiled roof over, demolition of existing concrete roof over the existing side bedroom and replaced with new tiled roof with roof lights, conversion of attic space into study with a dormer roof window extension to the side of existing hipped roof. Dishing of public footpath verge & kerb. New permeable driveway paving. Retention of 4.3m wide driveway entrance and retention of single storey 34sq.m recreation room in rear garden and all associated site works.
Attic conversion for storage with dormer window to the rear with 2 Velux windows to the front roof area. First-floor extension to the rear. Demolition of the existing shed to the rear and replacement with new shed with a pitched roof
Change the use of Unit 3 of Block 3 from retail to office space (155sq.m gross floor area excluding shared lobby of 34sq.m); signage zones related to the office use; all associated works to complete the development; signage zones located on the fascias of the ground floor retail Unit 2 and two internally illuminated, projecting pharmacy 'cross' signs, for a pharmacy which will be operating from the ground floor retail unit (Unit 2) of Block 3; all associated works to complete the development.
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
For the construction of single storey extension to the front of existing dwelling which will include new bay window, new pitched roof, and front elevation alterations/change of materials. Retention permission is also sought for the change of use of attic space to storage space including rear rooflights and all associated ancillary site works
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Ground floor, single storey extension with canopy/apex roof over to front of house.