To erect fully serviced two storey dwelling with attached domestic garage, sewerage treatment facilities, form entrance and all ancillary works
To retain alterations to previously approved plans and elevations and all associated works. Previous planning reference 05/1215 relates to this application
For renovation works and a proposed extension to the existing detached farmhouse. Site works will include the installation of a new aerobic-based domestic wastewater treatment system including vertical flow reed bed and constructed wetland
To retain alterations to floor plans and elevations of previously approved two storey dwelling, also PERMISSION sought to retain and complete alterations to floor plans and elevations of previously approved detached domestic garage and all associated site works. Previous Pl Ref 08/838 relates
Construct a single storey two bedroom detached dwelling, new waste water treatment plant and soil polishing filter, new vehicular entrance off the public road and all necessary ancillary site development works to facilitate this development. Significant further information including revised plans have been submitted.
Erect a fully serviced storey and half type dwelling and install sewage treatment facilities, works to include removal of existing ground floor slab, complete partially built detached domestic garage, complete entrance and siteworks and all ancillary works granted under previous planning reference 04/606
To 1. Replace front porch at existing dwelling, 2. construct new sunroom extension, and 3. carry out associated site works
To retain part brick finish to front elevation of existing two storey dwelling and all associated works
For amendments to the previously approved planning application (Reference 21/405) to include the following: 1) Increase in floor area of the proposed development, which includes minor alterations to the footprint of the extension. 2) Associated elevational changes to the extension. 3) Adjustment to the site layout plan to include a new vehicular entrance for the proposed extension from the existing IDA Business and Technology park service road, including street lighting, boundary treatments, and footpath connectivity, along with alterations to carparking layout. 4) Construction of a new standalone bin-store and bicycle storage building. 5) PV panels to be constructed on the roof of the extension. 6) All associated ancillary site development works
To erect fully serviced two storey extension to incorporate Educational Training, Innovation and a Business Incubation Centre to the existing Cavan Innovation and Technology centre, associated carparking, connection to existing services and all ancillary works
EXTENSION OF DURATION 15/395: to complete fully serviced dwelling house and garage granted under planning reg. 05/1021 and all associated and ancillary works
1) Retention of additional 1st Floor Office Space. 2) Retention of change of use from existing production area to office area. 3) Retention of workshop extension to rear of building. 4) retention of 5 no. storage containers and 2 no. associated covered areas. 5) Retention of existing workshop shed to rear, of factory. 6) Alterations to existing rear site layout to include for additional parking and all ancillary works. 7) PERMISSION to alter front elevation.
Of a bungalow type dwelling, domestic garage, formation of new site entrance onto the public road, installation of proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
Demolish existing dairy, alterations to existing parlour and to construct new diary, parlour and roof over collecting / holding yard with underground slurry storage tank and all ancillary site works
To construct a detached manufacturing / office facility incorporating first floor offices and training area, ancillary storage building, footpaths, carparking, storage bays, signage, public lighting, connection to existing public services, landscaping, boundary treatments, new entrance onto new access road and all associated site works
For the construction of bungalow type dwelling, domestic garage, formation of new site entrance onto existing laneway, installation of proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
For development consisting of a two storey industrial unit with office accommodation, dedicated car parking (105 no.), bicycle parking (20 no.), minor alterations to existing site entrance and the provision of marshalling yard, ESB sub station and screened plant area to the rear of the building and all associated site works. The development is located within the specific objective zone no. 12 of the Cavan town and environs development plan
For change of house type as per granted planning permission as per Planning Ref: 23/243, from a 2 bedroom single storey flat roof detached dwelling to a 2 bedroom single storey pitched roof detached dwelling with rooflighst within front and rear roof slopes. All other works to include new waste water treatment plant and soil polishing filter, new vehicular entrance off the public road and all necessary ancillary site development works to facilitate this development, as per granted Planning Permission as per Planning Ref: 23/243
To erect fully serviced single storey extension to foyer at front of existing hotel and relocation of existing smoking area and all associated ancillary works
To construct a circa. 140m access road, footpaths, public lighting, public services, landscaping, new entrance onto existing public roadway and all associated site works
For alterations to an existing cottage to include a single storey extension to the rear and side, elevational changes, raising the roof height to provide first floor accommodation, new access lane to replace an existing lane which will be closed up, entrance gates and piers, waste-water treatment plant with percolation area and all associated site works
To (A) construct a four bay shed which will consist of slatted area with slurry holding tank underneath and dry bedded pens. (B) also construct a silage pit with retaining walls and all associated site works
To construct a four bay shed which will consist of slatted area with slurry holding tank underneath, calving pens and all associated site works
For the demolition of an existing dwelling and the construction of a part single storey, part two storey detached replacement dwelling. The application also includes a new access lane to replace an existing lane which will be closed up, entrance gates and piers, waste-water treatment plant with percolation area and all associated site works
Of glass conservatory (12sqm) to side of existing residence
To construct a six bay shed which will consist of slatted area with slurry holding tank underneath and cubicles. Also construct a silage pit, dungstead with retaining walls and all associated site works
To erect fully serviced two storey dwelling, detached domestic garage, install sewerage treatment unit, percolation area, form entrance and all associated works
To erect fully serviced dwelling, detached domestic garage, install sewerage treatment unit, percolation area, form entrance/access and all associated works. Significant further information and revised plans have been submitted.
For construction of a bungalow type dwelling, domestic garage, formation of new site entrance onto existing laneway leading to the public road, installation of proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
For construction of a bungalow type dwelling, domestic garage, formation of new site entrance onto existing laneway leading to the public road, installation of proprietary wastewater treatment unit and percolation area and completion of all ancillary site works
To erect fully serviced factory unit, incorporating 2 storey administration & staff facility areas, single storey manufacturing/assembly/storage areas, access via existing entrances, parking, signage, landscaping, boundary treatments, bicycle shelter, connection to public sewer, surface water, watermain and utility services and all ancillary works
For variations to a previously approved Advanced Building Solution consisting of office and light industrial/production space. Permission is sought for revisions to the previously approved main building including a minor increase in permitted floor area, the vehicular/pedestrian entrance, timber post-and-rail boundaries, car parking, landscaping, and access road and all associated site works. This includes new permission for signage, cycle shelters, underground fire-fighting water storage tank, and an independent ESB substation & switch room building, and all associated site works. This application is a variation to previously approved site and building granted under application ref. no. 21117
For (1) the demolition of existing extension (2) construct a single storey extension to the rear and side of dwelling, (3) the renovation of existing dwelling (4) all services connected to all existing services together with all associated site works
To erect fully serviced Food Enterprise Centre which incorporates administration areas and warehouse storage, access via newly proposed service road, newly proposed parking, signage, landscaping, boundary treatments, bicycle shelter, connection to public sewer, surface water, watermain and utility services and all ancillary works
For alterations to the plans and elevations of previously approved Storey and a half dwelling with detached domestic garage and all and ancillary siteworks, all of which differs from that approved under planning application 21/609
To erect fully serviced storey and a half dwelling with detached domestic garage, entrance, sewerage treatment facilities & all ancillary works. Significant further information and revised plans have been submitted.
To erect fully serviced story and a half dwelling with detached domestic garage, entrance, sewerage treatment facilities and all ancillary works
For the construction of a single storey pitched roof conservatory to the side of the existing 2 storey dwelling and all necessary ancillary site development works to facilitate this development
For (1) the change of use of the existing detached single storey pitched roof garage building to residential to form ancillary family accommodation (2) the construction of a single storey pitched roof extension to the existing garage/new residential ancillary family accommodation (3) decommission existing septic tank and install a new wastewater treatment system and soil polishing filter, and (4) all necessary ancillary site development works
For development consisting of Construction of a fully serviced industrial unit, works include construction of a new site entrance from service road, connection to existing public services and associated site development works. Significant further information and revised plans have been submitted.
To construct a part two storey, part single storey dwelling, with integrated car port, a detached domestic garage, form new entrance from public road, install propriety sewage treatment unit and percolation area, together with all associated site works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.
For change of use from 'office ancillary to motor sales facilities' to 'office use', and all associated works
For (1) construction of a fully serviced industrial unit to incorporate a single storey production and manufacturing area together with a two storey ancillary administration and staff facilities area, (2) provision of car parking, bicycle parking, external yard area, landscaping, boundary treatments and access via existing site entrance, (3) erection of signage to proposed building façade, (4) connection to public foul water, surface water and water main, (5) completion of all ancillary site works and associated structures
To consist of an extension of existing service road in order to provide new entrance to existing commercial unit site, lighting, footpaths, connection to all existing services, removal of existing entrance, alterations to site boundaries and all ancillary works
For the change of use of the unit from light industrial to warehouse with trade counters for the sale of building related products principally to trade. Proposed external works on the south east elevation include a new access door and side glazing panels and operator sign with external downlighting. North east elevation: new double exit doors and a vinyl seasonal sign. North West elevation: mechanical plant and air handling units. Internally: the erection of trade counters and staff facilities. All other ancillary works associated with the proposed development
For the demolition of existing non-habitable buildings and the construction of an efuel research facility, provision of ancillary plant storage tanks, cooling plant area, new boundary treatments, alterations to existing entrance and internal access road, new wastewater treatment and percolation areas, attenuation pond, and all ancillary site development works. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED
To retain alterations to previously approved unit under Planning Ref. No. 18/477. Alterations include 1) Revised Site 6 site plan incorporating revised site boundaries, site entrance, location of Unit 1 and parking layout, 2) Additional single-storey extension to Unit 1, 3) Alterations to plans and elevations.,4) Additional detached storage unit, 5) 2 no. signage added to Unit 1 elevations, 6) All associated ancillary works
For RETENTION of a) alterations to site layout, entrance and site boundaries, b) external plant and gas tanks, c) 2 no. temporary storage vessels and d) all associated and ancillary works at site 7, IDA Cavan Business Park, Killygarry, Cavan. PERMISSION is also sought to erect 1 no. permanent storage vessels to replace existing temporary storage vessels and for the relocation of the previously approved bicycle shelter within the site
For the construction of an ESB substation building and all ancillary site development works
For alterations to previously approved unit under planning reference 18/477 to include - a) reduction in building height, b) additional floor area, c) associated alterations to floor plans and elevations, d) alterations to site layout & boundaries, e) alteration to site entrance and f) all associated and ancillary works