    WEB1738/25Granted

    144, Harmonstown Road, Dublin 5

    PAMES Developments Limited intends to apply for planning permission for a residential development of 43 later living apartment units, designed to the requirements of Fold Housing Association, comprising two linked 6 storey Apartment blocks at 144 Harmonstown Road, Harmonstown, Dublin 5 (D05 AY07). The proposed development will comprise of: (a) the demolition of the existing 2 storey detached light industrial building; (b) construction of 43 gallery accessed one-bedroom apartments in 2 blocks as follows – Block A, a 6-storey building facing Harmonstown Road consisting of 20 one-bedroom apartments with north facing external access galleries and private balconies to the southern elevation at floors 1 to 5, a communal room, office, 22 covered bicycle stands and 1 covered motorbike parking space at ground floor level; Block B, a 6-storey building consisting of 23 one-bedroom apartments with north easterly facing external access galleries and south westerly facing balconies, bin storage enclosure, enclosed parking / charging spaces for 3 mobility scooters and 8 enclosed bicycle spaces at ground level. (c) landscaping, communal open space, internal access road, vehicular turning head and boundary treatments including a 2m high block wall to the railway cutting on the southern boundary; (d) provision of 8 car parking spaces all at surface level, 4 of which will have electric vehicle charging points, (e) roof level plant area; and (f) all ancillary site development works necessary to facilitate the development, including new vehicular and pedestrian access and egress from Harmonstown Road.Decision record indexed
    Decision28 October 2025View record
  2. © OpenStreetMap
    2560009Granted

    Tully Road, Kildare, Co. Kildare

    For development on a site of approx. 0.387 ha. (The site is generally bounded by existing residential development at Oaktree Avenue to the north and east; Oaktree Road to the south; and an existing dwelling (R51 KR76) and Bride Street/Tully Road to the west and south west.) The proposed development shall consist of the following: The construction of 13 no. accessible age friendly residential units comprising 10 no. 1 bed houses (single storey in height) in a mix of semi-detached and terraced style units and 3 no. 2 bed houses (single storey in height) in the form of terrace style units; the provision of private open space for each residential unit in the form of side / rear gardens; and the provision of public open space to include the partial removal of an existing boundary wall to the east of the site to connect to the existing adjoining area of open space. The development will also provide for 13 no. car parking spaces (including 1 no. accessible space); vehicular and pedestrian access via Oaktree Road; additional pedestrian access to the adjacent site to the east; new footpaths and a pedestrian crossing at Oaktree Road to connect to existing pedestrian infrastructure; and all associated site development and infrastructure works providing for water, foul and surface water drainage and all associated connections, all landscaping, lighting and ancillary worksDecision record indexed
    Decision24 October 2025View record
  3. © OpenStreetMap
    SDZ25A/0030WGranted

    Site in the townland of Doddsborough, Adamstown, Lucan, Co. Dublin

    Evara Developments Limited intend to apply for permission for development at this c. 0.85 Ha site in the townland of Doddsborough, Adamstown, Lucan, Co. Dublin. The site is generally bound: to the north by Adamstown Drive; to the east by lands subject to a live Application for Tandy's Lane Village Phase 3 Development (Reg. Ref. SDZ24A/0034W) and part of an access road (to form part of Tandy's Avenue) which is currently under construction (permitted under Tandy's Lane Village Phase 1 Development (Reg. Ref. SDZ19A/0011, as amended under Reg. Refs. SDZ21A/0008 & SDZ21A/0011) and also included within the Tandy's Lane Village Phase 2 Development (Reg. Ref. SDZ22A/0006, as amended under Reg. Ref. SDZ23A/0006) and the live Application for Tandy's Lane Village Phase 3 Development); to the south by part of an access road (to form part of Tandy's Row) which is currently under construction (permitted under Tandy's Lane Village Phase 2 Development); and to the west by part of an access road (to form part of Tandy's Glen) which is currently under construction (permitted under Tandy's Lane Village Phase 2 Development). This application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to Phase 4 of development within the Tandy's Lane Village Development Area of the Adamstown Strategic Development Zone. The development also includes amendments to the permitted Phase 2 Development within the Tandy's Lane Village Development Area (Reg. Ref. SDZ22A/0006, as amended under Reg. Ref. SDZ23A/0006). The proposed development will principally consist of the construction of 30 No. dwellings including 7 No. 2-bed units, 7 No. 3-bed units and 16 No. 4-bed units. The development will range in height between part 1 No. to 3 No. storeys. The development will also include: foul and surface water drainage connections; amendments to the landscaping and footpaths permitted to the east, south and west of the site and to the car parking layout to the west of the site permitted in Tandy's Lane Village Phase 2 Development; 52 No. car parking spaces; ESB substation; hard and soft landscaping; boundary treatments; public lighting; and all associated site and development works above and below ground.Decision record indexed
    Decision24 October 2025View record
  4. © OpenStreetMap
    25/5103Granted

    Boherbue Comprehensive School Laharan East and West Boherbue Mallow Co.Cork

    Permission for:- 1) Construction of 2 no. connecting single-storey extensions to the existing school, consisting of an entrance space to the front (North) elevation and a construction studies room to the rear (South) elevation. 2) Construction of a standalone two-storey school building to the rear (South) of the site, containing 4 no. classrooms, library, GP/dining hall and ancillary educational spaces. 3) Demolition of an existing storage room. 4) Internal layout changes and alterations to all facades of the existing school block. 5) Together with the provision of extending the internal access road, pedestrian footpaths, modifications to entrance gateways, additional staff car parking spaces along with designated SEN and bus drop off area, including all associated ancillary site works and connections to services. Permission for Retention for: 1) External canopy structure to rear of existing school block, currently used as an external eating area and proposed to be used as an external SEN recreational space in the future.Decision record indexed
    Decision23 October 2025View record
  5. © OpenStreetMap
    2560315Granted

    Arden, Tullamore, Co. Offaly

    Amendments & modifications to the permission granted for 98residential units (including 28 no. apartments) & a community creche under Ref. 21/328, made concurrently with an application for modifications to the permission granted under Ref. 21/327, including: -Elevational & design changes to all dwelling units; -Relocation of the 2.4m high northern boundary wall; -Repositioning of the permitted dwelling units 27 & 68-72 to facilitate the relocation of the northern boundary wall; -Repositioning of the permitted dwelling units 17-27 to facilitate the change in the location of the eastern boundary wall; Change to road layout to the front of dwelling units 21-27; -Relocation of the permitted bin and bike storage serving both blocks of duplex units 1-16 and 87-98 as well as redesign of the car parking layout to the front of both blocks and provision of EV spaces to the north of the playground between these blocks; -New universally accessible parking space off the permitted vehicular access road to the west of the block of duplex units 102-113 that were permitted under Planning Ref. 21/327; -Modifications to driveways and increase in private amenity space to serve houses throughout; -Addition of side passages to a number of houses to enable direct access from the front to the rear gardens of several dwelling units (units 36,37,46,47,56,57,66,67,68,72); -Private off-road and offcurtilage parking changes throughout including 2 no. additional car parking spaces to the front of the dwelling units 46/47 and 66/67 of the permitted development; -Amendments to the creche car parking layout; -Finished floor, ground and road levels reduced throughout; -Front garden boundary walls of dwelling units replaced with hedging; -Rear garden, side boundary walls to be replaced by concrete post with infill timber panel boundary to each dwelling unit; -2 no new substations with 1 no. adjacent and to the north of the permitted vehicular access road from Arden Road & 1 no. to the east of the permitted creche; -Rationalisation of permitted open space to reflect the changes in the overall layout; & - Amendments to all site development and drainage works, hard & soft landscaping, lighting, fencing, & signage as well as connection to permitted development as granted under Ref.21/327, & proposed to be amended under concurrent application. See Application form Appendix A for full development description-unable to include full description here.Decision record indexed
    Decision23 October 2025View record
  6. © OpenStreetMap
    2560988Granted

    Kilwoghan Woods, Crodaun, Celbridge

    Large Scale Residential Development - to amend a previously permitted Strategic Housing Development (SHD) (ABP Case Reference 307100-20) on a site of approx. 12.93 ha located on lands at Kilwoghan Woods. The proposed amendments relate to phase 2 (c.3.94ha) of the overall permitted development and, will include amendments to 239 no. residential units. (The overall total number of permitted 467 no. units in phase 1 and 2 remain unchanged). The proposed development comprises a redesign of phase 2 to include: a) The construction of 2 no. 4-storey apartment blocks at the north of the site (81 no. units in total) to include a creche (351sqm – 94 no. children) with outdoor play area (93sqm) at ground floor; i. Block A - 38 no. units consisting of 17 no.1 bed and 22 no. 2 bed units ii. Block B - 43 no. units consisting of 20 no. 1 bed and 23 no. 2 bed units b) 5 no. 3-storey apartment and duplex units to be located on the eastern boundary of the site; i. Duplex C - 08 no. units consisting of 4 no. 2 beds and 4 no. 3 beds ii. Duplex D - 18 no. units consisting of 4 no. 1 beds, 8 no. 2beds, and 6 no. 3 beds iii. Duplex E – 18 no. units consisting of 4 no. 1 beds, 8 no. 2beds, and 6 no. 3 beds iv. Duplex F – 20 no. units consisting of 10 no. 2beds, and 10 no. 3 beds v. Duplex G – 18 no. units consisting of 4 no. 1 beds, 8 no. 2beds, and 6 no. 3 beds c) 76 no. terraced houses consisting of; i. 48 no. 2 bed mid terrace units ii. 12 no. 3 bed end terrace units iii. 16 no. 3 bed end terrace dual frontage units d) 252 no. of car parking spaces which includes 2 no. car sharing spaces, 14 no. motorcycle spaces and 540 no. bicycle parking spaces will be provided for in phase 2. e) Amendments to the previously permitted open space in phase 2 to now provide 5,379sqm Public Open Space, 1,159 sqm Communal Open Space and 3,313 Amenity Space. Each of the units are afforded their own private open space in the form of private gardens, balconies or terraces. f) Amendments to internal residential access roads and cyclist/pedestrian paths to allow for the 4 arm entrance junction and a new shared pedestrian / cycle path through the site running north to south. g) All associated site development works, services provision, infrastructural and drainage works, internal access roads, home zones, cycle and pedestrian infrastructure, bin stores, car and bicycle parking, public lighting, communal open spaces, private open space in the form of gardens, terraces and/or balconies, landscaping anDecision record indexed
    Decision23 October 2025View record
  7. © OpenStreetMap
    2560267Granted

    Ballyrichard, Carrick-on-Suir, Co. Tipperary

    The demolition/removal of external stairs and detached buildings to build an extension to the rear of the building with car parking and new access. The extension will consist of a part single part two storey building. It will be located to the north of the existing college and will have a flat roof. It will include classrooms and ancillary uses at ground level, a new entrance foyer, fire escape stairs, lift and will also include fire escape from the existing building and staff facilities at first floor level. The development will include a new car park and entrance to the rear (North) with access from St. Nicholas Park. The existing vehicular entrance will be widened. The development will include all associated site works, landscaping and services. The landscaping will include soft and hard surfaces, ramps and steps, a new deck area to the west of the existing building, a new courtyard area with a podium adjacent to the new entrance and covered bicycle parkingDecision record indexed
    Decision22 October 2025View record
  8. © OpenStreetMap
    2560145Granted

    Coomnakilla North, Blackwater Bridge Killarney, Co. Kerry

    The development consists of (a) retention planning permission to retain the conversion of the attic space to habitable accommodation, (b) retention planning permission to retain elevational changes made to the design of the house, (c) retention planning permission to retain the domestic shed as constructed, (d) retention planning permission to retain the roadside and entrance fencing as constructed, and (e) retention planning permission to retain the house, shed, wastewater treatment system, bored well, site entrance, driveway and parking area within revised site boundaries and Full Planning Permission to decommission the existing septic tank and to replace it with a new wastewater treatment systemDecision record indexed
    Decision22 October 2025View record
  9. © OpenStreetMap
    2560541Granted

    Block 4 Quayside Business Park, Mill Street Dundalk, County Louth

    The development will consist of the provision of external plant at the rear (north east) façade of Block 4 comprising of air conditioning unit, a heat pump and 2 No. condenser units all on a concrete plinth; and the provision of boundary hedgerow planting.Decision record indexed
    Decision17 October 2025View record
  10. © OpenStreetMap
    2560539Granted

    Athlumney Alexander Reid Ferganstown and Ballymacon, Navan, Co.Meath

    Permission for a Large-Scale Residential Development - The proposed development will consist of 223no. residential dwellings (26no. 1 -bed, 50no. 2-bed, 138no. 3-bed and 9no. 4-bed) and a crèche. The mix of residential units consists of 155no. houses (18no. 2-bed, 128no. 3-bed, 9no. 4-bed) and 68no. apartments (26no. 1-bed, 32no. 2-bed, 10no. 3-bed). Apartments are three to four storey simplex/duplex own door apartments arranged in 5no. blocks. All housing is two storey in height. The crèche is a two storey standalone building (c.443sq.m) with allocated car parking and set down area. The proposed development includes all associated site development works including reprofiling of the site, works to an existing drainage ditch, the construction of a temporary foul water pumping station and rising main, public lighting, three ESB substations, bin and bicycle storage structures, car parking and landscaping of open space. The proposed development also provides for connections both vehicular and pedestrian to the residential development by Meath County Council known as Gort Na Glaise including the culverting part of an existing drainage ditch, removal of part of an existing hedge and existing boundary walls constructed within the Gort Na Glaise development. Provision is also made for future pedestrian/cycle connectivity to the west in keeping with Masterplan MP12. The development includes pedestrian/cycle connections onto the LRD6 and will provide a pedestrian crossing point on Old Road to the south of the application site. The development will be accessed by extending a spur off an existing roundabout junction on the new LRD 6 distributor road to the north of the application site. A portion of this spur road was previously permitted under P.A. Ref. 21-1046/ABP-312746-22. The proposed development also provides for an additional vehicular/pedestrian access to connect to the main access road proposed as part of a development to the north / north-west of the application site under P.A. Ref. 24/60415 (currently on appeal to An Bord Pleanála ABP-322341-25). A footpath and cycle path will be constructed along the western side of the application site as part of this planning application to provide access to the new development. A natura impact statement (NIS) has been prepared in respect to the proposed development and will be submitted to the planning authority with the planning application. Significant further information/revised plans submitted on this applicationDecision record indexed
    Decision15 October 2025View record
  11. © OpenStreetMap
    LRD25A/0003WGranted

    Woodtown, Ballycullen, Dublin 16.

    The proposed development will consist of 502 no. residential units (108no. 1-bed, 170no. 2-bed, 162 no. 3-bed; 62 no. 4-bed) comprising 197no. 2 storey houses (terraced/semi-detached/detached) (19no. 2-bed, 116no. 3-bed; 62no. 4-bed) and 28no. 3 and 4 storey simplex/duplex apartment blocks providing 305no. apartments (108no. 1-bed apartments, 151no. 2-bed apartments, 46no. 3-bed apartments). The proposed development also includes a creche (c.475sq.m), public open space, car parking (surface/undercroft), bicycle parking, bicycle storage structures and lockers, bin stores, and 8no. ESB substations. Vehicular access to be provided from the existing spur road connection to Stocking Avenue to the west of the site, and via Stocking Wood Drive to the east of the site (with relocation of existing ESB substation and associated works to the existing hammerhead). Additional pedestrian only routes will be provided into Abbot's Grove Park and Stocking Wood Copse with future connections provided for into Stocking Wood Manor, White Pines Park and the future school site to the north of the application site. The proposed development includes all associated site development works (including site reprofiling, retaining structures and downing of ESB overhead lines), landscaping, boundary treatments and services provision the lands are located to the east of Abbots Grove Park, south-east of Abbots Grove Avenue, south of Stocking Avenue and Stocking Wood estate and west of White Pines Park.Decision record indexed
    Decision15 October 2025View record
  12. © OpenStreetMap
    2560946Granted

    Ballymore GAA, Bishopsland, Ballymore Eustace

    For: Low energy floodlights consisting of six number lamp standards 20m in height located around the main playing pitch. The installation of three number proprietary solar power generating car-ports 50.4sqm each to be located to north of tennis courts. The installation of 31sqm solar panel array to south facing roof of existing clubhouse. Ancillary facilities include 10 number bicycle parking standsDecision record indexed
    Decision13 October 2025View record
  13. © OpenStreetMap
    2560715Granted

    The Park Hotel, Kenmare, Co. Kerry

    • Demolition of an existing single storey timber building to the north-east of the site. • Development of a new single storey ‘Tigin’ building, comprising a multi-use space for small events, ancillary storage, kitchenette and W/C facilities, providing a total gross floor space of 147sqm, with the proposed ‘Tigin’ to be used be used for ancillary purposes to complement the existing facilities in the main hotel building • The proposed development includes all associated and ancillary works including landscaping and infrastructure works.Decision record indexed
    Decision10 October 2025View record
  14. © OpenStreetMap
    2560116Granted

    Newbridge Road (R445), Jigginstown, Naas

    For the development will consist of the provision of 2no. motor sales and service facility buildings and a wash, bin store and recycling building; comprising of Building 'A', single storey motor sales showroom and service workshop facility with associated ancillary spaces, with a total gross floor area of 2470 sq.m. (maximum height of c. 7m); Building 'B', single storey wash, bin store and recycling building, solely for use as part of the vehicle service business, with a total gross floor area of 211 sq.m. (maximum height of c. 5m): Building 'C', single storey motor sales showroom and service workshop facility with associated ancillary spaces, with a total gross floor area of 2162 sq.m. (maximum height of c. 7m), The development will also include: illuminated signage on the building facades; 3no. free-standing double-sided illuminated pylon signs; removal of existing site entrance and forming new site entrance; customer and staff car parking; bicycle parking; new and used vehicle display parking; vehicle storage area and service parking; electric vehicle charging points; fuel dispense area; associated lighting; hard and soft landscaping including the provision of boundary treatments, gates, fencing, walls and bollards; SUDs measures; associated site servicing (foul and surface water drainage and water supply); and all other site excavation and development works above and below ground at 2.4 hectare site on the north side of the Newbridge Road, (R445) bounded by the Aldi distribution facility to the west and Naas Sports Centre to the EastDecision record indexed
    Decision08 October 2025View record
  15. © OpenStreetMap
    2560854Granted

    Site in the Townlands of Castlefarm Rusk and Clonee Dunboyne County Meath on lands generally bound to the east and south by agriculturally zoned lands to the west by the Iarnród Éireann rail line, and to the north by the residential development perm

    Permission for a Large-Scale Residential Development - the development will comprise amendments to the permitted development as per Large-scale Residential Development permission reference 23/849 which comprises 517no. apartment units, 44no. duplex units,155no. 2storey houses, a creche and associated site works. The proposed development incorporates the following amendments: (I) Reconfiguration of apartment block B1 with reduction of associated basement parking and provision of ground level parking in lieu of same. Apartment block B1 is amended with omission of 3no. 2 bed apartments to comprise a total of 67 apartments in lieu of 70 apartments as granted. (II) The omission of the Creche from apartment block B1 with a new two storey creche to be provided. (III) Revised phasing and associated site works. (IV) Reconfiguration of apartment block B2 with reduction of basement parking and provision of ground level parking in lieu of same. Apartment block B2 unit mix is amended with omission of 5no. 1 bed apartments and 3no. 2bed apartments to comprise 69 apartments in lieu of 77 apartments as granted. (V) The reduction in basement parking provision and overall parking provision will be amended by the provision of additional spaces at ground level. Revisions to bicycle storage provision are also proposed. (VI) Amendments to the design of duplex units (unit type D) comprising revised facades and roof designs to incorporate provision of a mono-pitch roof in lieu of previously approved pitch roofs. (VII) The amendment of 44no. duplex units from 1bed and 2bed units to now incorporate 2bed and 3bed units; (no change in overall duplex unit numbers proposed). (VIII) The overall residential unit numbers will decrease to 506no. apartment units, 44no. duplex units and 155no. dwelling houses (705 residential units in lieu of 716 units as granted). (IX) A revised phasing proposal with the creche provided in phase 1B. (X) Reconfiguration of public open space and communal space and associated site works.A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this applicationDecision record indexed
    Decision07 October 2025View record
  16. © OpenStreetMap
    2460649Refused

    Lands to the East of the Western Relief Road South of the Marlbog Road & north of Wadman Park, Raynoldstown Village Haynestown, Dundalk Co. Louth.

    Permission for the construction of 91 houses comprising of 4 no. end of terrace 2 storey 3 bedroom dwellings (Type A), 53 no. terraced 2 storey 3 bedroom dwellings (Type B), 12 no. semi-detached 2 storey 3 bedroom dwellings (Type C2), 3 no. semi-detached 2 storey 3 bedroom dwellings (Type C3), 1 no. detached 2 storey 4 bedroom dwelling (Type D), 3 no. detached 2 storey 4 bedroom dwellings (Type E),10 no. semi-detached 2 storey 4 bedroom dwellings (Type F), 1 no. detached 2 storey 4 bedroom dwelling (Type G1), 1 no. detached 2 storey 4 bedroom dwelling (Type G2), 1 no. detached 2 storey 4 bedroom dwelling (Type H), 2 no. detached 2 storey 3 bedroom dwellings (Type J), and all associated ancillary site development works, boundary treatments, landscaping, open spaces and ESB sub-station on lands of circa 3.18Ha. (Previous Permission 03/1754) via the existing approved vehicular and pedestrian access from the Western Relief Road and the approved pedestrian/ cycle path from the Marlbog Road at Raynoldstown Village, HaynestownGrounds not yet categorised
    Decision07 October 2025View record
  17. © OpenStreetMap
    SDZ25A/0036WGranted

    Kishoge Urban Centre (sub sector KUC-S4), Within the Clonburris Strategic Development Zone, in the townland of Kishoge, Clonburris, Dublin 22.

    Amendments to existing planning permission Ref: SDZ23A/0043 which included a Large 2 storey retail unit (over an undercroft car park) comprising: A. Ancillary off-licence use of the large 2 storey retail unit, including a designated off-licence display area measuring c. 72 sqm; B. Layout / elevational alterations including: additional customer entrance to Northern elevation, reconfiguration of loading bay ramp and roof (to allow service access to first rather than ground floor level) and associated modifications, reconfigured rooftop plant compound and access arrangements, ventilation louvres, and revisions to façade metal cladding arrangements; and, C. Advertising signage including a total of 5 no. internally illuminated building mounted Lidl logo signs measuring c. 2.5 m x 2.5 m to the North, South, East and West elevations of the large 2 storey retail unit.Decision record indexed
    Decision07 October 2025View record
  18. © OpenStreetMap
    2560434Granted

    Site 1 Phase 2 North Paddocks, Mount Juliet Thomastown, Co. Kilkenny

    For provision of a revised entrance to that previously approved (Grant of Permission ref. 21/389), driveway, parking area, external store, and associated site works at Site 1, Phase 2, North Paddocks, Mount Juliet, Thomastown (formerly described as Site opposite 10th Green, Mount Juliet). The existing boundary was extended and a permitted water tank was approved under Ref: 23/60349. A number of Protected Structures exist at Mount Juliet Estate (including Refs C367, D24, C1021, C1022, C1023); however, no works are proposed to these structuresDecision record indexed
    Decision06 October 2025View record
  19. © OpenStreetMap
    2560164Granted

    The former Guilfoyle’s Garden Centre site, Grey Abbey Road, Kildare Town Co. Kildare

    For the demolition of an existing single-storey house and garage and the provision of twenty homes comprising two no. two-storey terrace blocks of housing containing five no. three-bedroom dwellings in each block; one two-storey terrace block of housing containing four no. three-bedroom dwellings; and a two-storey detached building containing six no. two-bedroom own-door apartments. The application includes modified site access and internal access roads with turning hammerheads, the creation of twenty five parking bays, the provision of passive and active communal open spaces and all water, sewage and stormwater connections to the local networks. Revised by Significant Further Information which consists of: The number of residential units proposed has been reduced from twenty to eighteen. Two storey own-door apartment block type ‘A’ containing six no. two bed apartments is replaced with new terrace block 4 containing two no. three bed houses and two no. two bed houses. Terrace blocks 1 & 2 each now have four no. three bed houses and one no. two bed house. This mix replaces the former mix of five no. three bed houses in each block. Engineering design for the foul, surface water and water infrastructure has been updated. A new connection into the existing foul sewer on the Grey Abbey Road is now proposed. Amendments to the site layout have also resulted in updated car and bicycle parking provisions. The design for the access at the site frontage and the frontage to the north of the site has been updated to include for a priority junction and continuation of the existing cycle track and footpath along the Grey Abbey Road. This will tie into the existing cycle track and footpath further north at Grey Abbey View. Revised by Significant Further Information which consists of the following (with these amendments carried out in response to a Clarification of Further Information request): (a) Terrace block type 4 has been amended as follows: o Previously proposed 2 no. 2 bed mid-terrace house type ‘B1’ has been replaced with 2 no. 2 bed mid-terrace house type ‘D1’ to eliminate any overlooking from habitable rooms to the rear at first floor level. o Previously proposed 1 no. 3 bed end-terrace house type ‘C1’ has been replaced with 1 no. 3 bed end-terrace house type ‘A1’. o The total no. of units in terrace block type 4 is still 4 and has the same mix (2 no. 2 beds and 2 no. 3 beds with house types as follows: 1 no. house type ‘A1’, 1 no. house type ‘C1’, aDecision record indexed
    Decision06 October 2025View record
  20. © OpenStreetMap
    2461149Granted

    Newtown, Enfield, Co. Kildare

    For (A) Change of use of existing vacant ground floor retail unit to residential use consisting of 1 no. single storey, 2-bedroom apartment and 1 no. single storey, 1-bedroom apartment. This includes the removal of the existing shopfront to be replaced by 3no. windows and 2no. entrance doors to the front (east) elevation. (B) Change of use of existing, adjoining vacant public house to residential use consisting of 1 no. two-storey, terraced 3-bedroom house and 1 no. semi-detached 4-bedroom house. This includes the removal of the existing entrance doors and provision of 2no. new windows and 1no. new entrance door to the front (east) elevation. (C) Permission for alterations to the side (north) elevation consisting of the removal of the existing ground floor porch window, to be replaced by a new entrance door and provision of 1no. new ground floor window. (D) Permission for the demolition of existing flat roof portion of public house to rear (west) elevation to facilitate the provision of private rear gardens for the proposed houses. (E) Permission for alterations to the rear (west) elevation consisting of the removal of 2no. rooflights and the provision of 4no. new ground floor windows, 2no. ground floor sliding doors and 4no. new first floor dormer windows. (F) Permission for 4 no. connections to the existing on-site waste water treatment system with a new tertiary sand polishing filter percolation area. (G) Permission for on-site car and bicycle parking with new screen boundary walls and all associated site development works. Revised by Significant Further Information which consists of: The redline boundary has changed on the site and entrance onto the site has changed from being vehicular to pedestrianDecision record indexed
    Decision06 October 2025View record
  21. © OpenStreetMap
    SD25A/0129WGranted

    Former Agnelli Motors, Greenhills Road, Tallaght, Dublin, D24 PW77

    The development will consist of: (1) Permission for works comprising of: (i) Partial change of use from warehouse to office use at ground floor level [c.270sq.m GFA] and refurbishment of the existing first-floor office [c.263sq.m GFA] in the north of the unit. The office space [c.533sq.m Total GFA] will comprise individual offices, meeting rooms, stairwells and circulation areas, storage areas, plant, canteen facilities, and WC facilities - including a new accessible WC on the ground floor. The proposed works will also include the reinstatement of existing windows and an entrance, the opening of blind windows, and the installation of a new window on the west elevation. (ii) Change of use from motor showroom, including ancillary workshop and office / storage areas, to warehousing [c.1,056sq.m + c.1,065sq.m. GFA] in the south of the unit. The proposed works will include the demolition of internal partition walls, floors, stairs, and doorways in the south-east of the unit. The works will also include the removal of a mezzanine level in the south-west of the unit [c.130sq.m.] and the installation of two new free-standing mezzanine levels [1,056sq.m. GFA at first floor level + 1,056sq.m. GFA at second floor level] with associated stairwells and a service lift in the south-west of the unit. (iii) Reconfiguration of the car park layout to the south and west of the unit to accommodate 35 no. car parking spaces, including 2 no. accessible spaces and 7 no. electric vehicle (EV) charging spaces, and a service yard to the north-east of the unit. (iv) Provision of 15 no. bicycle stands under a dedicated shelter located to the north of the unit, providing secure long-term parking for up to 30 no. bicycles, and provision of 2 no. bicycle stands to the west of the unit, providing short-term parking for up to 4 no. bicycles. (v) Repurposing of the external plant room to a bin store. (vi) Reinstatement and rebranding of 2 no. previously permitted pylon signs (Reg. Ref. SD15A/0190), located to the west and south-west of the unit, respectively. (vii) Provision of designated signage zones located above the glazed sections at the south-west corner of the building, as well as above the office and warehouse entrances on the west and south elevations. (viii) Provision of hard and soft landscaping, including the planting of native trees along the southern and western boundaries. (2) Retention permission for the existing pylon sign located at the main entrance to the site in the south-east corner. The pylon sign is to be rebranded. (3) All associated site development and services work on a site of c.0.8609ha.Decision record indexed
    Decision03 October 2025View record
  22. © OpenStreetMap
    2560400Granted

    IDA Business & Technology Park, Garrycastle Dublin Road, Athlone Co. Westmeath

    Retention permission - development consists of an additional hardstanding area of circa 262m² for Heavy Goods Vehicle container parking to the North of the existing site, with all associated landscaping and ground worksDecision record indexed
    Decision01 October 2025View record
  23. © OpenStreetMap
    2460245Granted

    Ridge Road, Portlaoise, County Laois

    Construct one retail building containing 2 large retail units with a separate enclosed service area and one restaurant with drive through facility. The proposed development will include the demolition of two residential bungalows, garden walls and the partial demolition of the existing stone walls within the curtilage of the protected structure, Portleix House (NIAH Reg: 12505147). Partial demolition of the existing boundary wall to the Dublin Road to form a new pedestrian access/plaza to the development and erection of a new railing boundary treatment to the Dublin Road frontage, partial demolition of the existing boundary wall along Ridge Road and replaced with a new retaining boundary wall with railings along Ridge Road. Site works will comprise of; (a) provision of a new access road/entrance to the north east of the development off Ridge road; (b) provision of 85 no. car parking spaces (including 5 no. accessible parking spaces); (c) provision of landscaping, drainage systems, footpaths, boundary treatments, lighting and all ancillary works necessary to facilitate the proposed development; (d) the proposal facilitates an area required for the future construction of the Triogue Blueway Part B (Phase 2) by Laois County Council.Decision record indexed
    Decision30 September 2025View record
  24. © OpenStreetMap
    WEBPWSDZ1571/25Granted

    Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4

    Pembroke Beach DAC intends to apply for permission for development for a 228 No. bedroom Hotel development (referred to as Phase 2B) (including a café, licenced bar / restaurant, business centre and ancillary elements) on this site of 15.06ha including lands known as the former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 0.211ha (identified as within the 'A1 Lands') in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019) (as amended). The overall site is bounded to the: north-west by Sean Moore Road; north-east by South Bank Road; south-east by Dublin Port lands and Dublin Bay; and south-west by Sean Moore Park. The overall site subsumes the 4.3ha site of the 'Infrastructure Permission' (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year Permission) on 28 January 2020, permitting streets, transportation, water services and utilities' infrastructure; public realm and public amenity spaces (including the Village Green and Dog Park); and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the Poolbeg West SDZ Planning Scheme (2019) (as amended) as approved by An Bord Pleanála. The proposed Phase 2B Hotel Scheme development will consist of: • Construction of a 228 No. bedroom Hotel development ('Block Q') (10,593 sq m GFA (excluding basement)) comprising a 20 No. storey landmark tower (with set-back storey at Sixteenth Floor Level 16) over two levels of basement (2,054 sq m), to provide: Hotel and ancillary uses, café, licenced bar / restaurant and ancillary spaces, business centre; and ancillary back-of-house facilities / spaces (including ESB Substation and associated ancillary rooms, bin store, laundry store, staff changing rooms, staff canteen, staff office and sprinkler tank and associated spaces). • Provision of 8 No. car parking spaces (including 1 No. accessible car parking spaces) and 1 No. service vehicle delivery bay at Basement Level -01, provision of 24 No. secure long-stay bicycle parking spaces for staff at Basement Level -01, and provision of 16 No. new short-stay bicycle parking spaces at surface level for visitors and provision of 1 No. new cargo bicycle parking space at surface level to service the proposed Hotel. • Amendment of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24): • In those external landscaped areas at Ground Floor Level in the immediate curtilage of the proposed Phase 2B Hotel Scheme site (including 'Gabbard Street' and 'South Bank Link Street') (within the focused site area) to facilitate amendments to permitted layouts, including the omission of 1 No. permitted EV-charging car parking space, the relocation of 1 No. accessible car parking space and 1 No. EV-charging car parking space, the relocation of 20 No. permitted short-stay bicycle parking spaces; provision of 1 No. new loading / pick-up/drop-off bay; addition of an access point on South Bank Link Street for proposed ESB substation, materials, urban tree locations and landscaping; • At substructure level to facilitate connections for vehicular movements, pedestrian movements and services between the permitted and proposed substructures. Accessing and servicing of the proposed Phase 2B Hotel Scheme development will be by way of 'Gabbard Street' (previously permitted under the Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and the Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24) and also by the permitted vehicular ramp on 'Ouzel Street' to / from the basement of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24). This Application will be accompanied by a Natura Impact Statement (NIS).Decision record indexed
    Decision30 September 2025View record
  25. © OpenStreetMap
    SD25A/0103WGranted

    Greenfort Avenue, Quarryvale, Dublin 22, D22 PW58

    Single storey extension as SEN Unit to north-east of school building with 2 No. SEN Classrooms (70sqm each); 2 No. Quiet Spaces (13sqm each); 1 No. Multi-Activity Room (20 sqm); 1No. Central Activity Space (100sqm) and Daily living skills (15sqm); 1 No. office(20sqm); toilets and shower area(18.52 sqm); 3 No. staff toilets (8.15 sqm); 1 No. changing place (12.52sqm); 2 No. storage spaces (14 sqm); 1 No. cleaner store (3sqm); 1 No. sluice(3sqm) and ancillary services; external new secure soft play area (120sqm) and sensory garden (90sqm); 6 No parking spaces and all associated site works and services including new vehicular & pedestrian gates to Greenfort Lawns at St. Bernadette's Senior National School, Greenfort Avenue, Quarryvale, Dublin 22, D22 PW58Decision record indexed
    Decision29 September 2025View record
  26. © OpenStreetMap
    2560484Granted

    42 Woodlands Park, Coill Dubh, Co. Kildare

    For (A) Construction of two storey extension to Side (south east) elevation and alterations to front entrance porch on Front (north east) elevation and (B) Single storey extension to Rear (south west) elevationDecision record indexed
    Decision25 September 2025View record
  27. © OpenStreetMap
    SDZ25A/0034WGranted

    Within the townlands of Clonburris Great and, Kilmahuddrick and, Clonburris Little, Clondalkin, Dublin 22.

    The development will consist of the construction of 3 no. strategic public parks located inside the Clonburris SDZ as per the Clonburris SDZ Planning Scheme (2019) in the southern part of the overall SDZ comprising: Site A) Provision of 'Stage 3' Griffeen Valley Park Extension' public park of c. 15.94 hectares, on 2 no. parcels of land north and south of the Clonburris Southern Link Street in the western part of the SDZ lands comprising landscaped areas, 1 no. all-weather GAA pitch (with floodlighting - GAA pitch is also sized to cater for 2 no. soccer pitches), 2 no. natural soccer pitches, 3 no. tennis courts and 1 no. padel court (with floodlighting), play areas, 1 no. basketball court, 2 no. cricket practice creases, 1 no. cricket crease, rebound wall area as well as allotment areas and coach parking set down area including 27 no. car parking spaces & 78 bicycle spaces (as well as 2 no. pedestrian access points to Haydens Lane) - vehicular access from permitted access under Planning Reg. Ref. SDZ20A/0021 to the Clonburris Southern Link Street; Site B) Provision of 'Stage 4A' Grand Canal Park' public park of c. 7.32 hectares (to the south of the Grand Canal) comprising 2 no. natural soccer pitches, play areas, ESB substation, and allotment area as well as 30 no. car parking spaces [with access from Lockview Road] & 66 no. bicycle spaces; Site C) Provision of 'Stage 5' Na Cluainte Park South' of c. 4.04 hectares located centrally within the SDZ (on 2 no. sites either side of the Clonburris Southern Link Street) comprising landscaped areas, attenuation ponds, 1 x Soccer All Weather Pitch (floodlit), 1 no. natural soccer pitch, 2 no. basketball courts, play areas, 2 no. cricket practice creases, and 1 no. multi-sports pitch (weights table games etc.) and allotment areas as well as 30 no. car parking spaces & 96 no. bicycle spaces, with access provided from the permitted Clonburris Southern Link Street; Permission is also sought for all associated drainage infrastructure works to include surface water attenuation areas including attenuation ponds and revisions to the permitted 'Stage 1' infrastructure under Planning Reg. Ref. SDZ20A/0021 relating to the coach parking area and attenuation area to the north of the Clonburris Southern Link Street and associated ancillary amendments and integration of the 'Stage 1' infrastructure (under construction) with the proposed development (to include relocation of flood compensation area to the west of the Griffeen River, increased landform variation in attenuation area no. 1, revisions to internal paths, removal of retaining walls to attenuation area no. 2, additional planting). Permission is also sought for all ancillary site development (including site accommodation, site compounds, and temporary construction boundary fencing) and landscape works/planting associated with the development, including hard and soft landscaping, 3 no. temporary project signage (at 3 no. locations) and Irish water foul water diversions in Grand Canal Park.Decision record indexed
    Decision25 September 2025View record
  28. © OpenStreetMap
    25145Granted

    Charterschool Land, Manorlands 2nd Divions & Commons Td 7th Division, Trim Co. Meath

    EXTENSION OF DURATION OF PLANNING PERMISSION SHD307507-20 - the development will consist of the following: • 320 no. dwellings comprising: o 136 no. houses comprising 10 no. 2-bed, 105 no. 3-bed and 21 no. 4-bed; o 120 no. apartments within 4 no. 3-5 storey blocks comprising 11 no. studio, 30 no. 1-bed, 71 no. 2-bed and 8 no. 3-bed; o 64 no. duplex apartments within 8 no. 3-storey blocks comprising 32 no. 2-Bed and 32 no. 3-Bed. o All units with associated private gardens/ balconies/ terraces to the north/ south/ east/ west elevations. • A creche and community centre (total floor area c.739 sq.m). • 563 no. car parking spaces, 188 no. secure/covered bike parking areas and communal bin stores for apartments/duplexes. • Vehicular and pedestrian accesses from Summerhill Road (R158) with associated upgrades including new cycleways and footpaths. • All other site works, landscaping, boundary treatments, ESB substation/switchrooms, plant and services provision required to facilitate the development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Meath County Council Development Plan 2013-2019 and Trim Development Plan 2014-2020. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.Decision record indexed
    Decision24 September 2025View record
  29. © OpenStreetMap
    WEB2122/25Refused

    105, 107, 109, Emmet Road, Dublin 8

    Planning permission is sought by Orbitiz Ltd. for a mixed-use residential & commercial development on land measuring approximately 0.053ha hectares at 105, 107, 109 Emmet Road, Dublin 8. This site is bounded by Pocket Park to the east, Myra Close to the north, and Kilmainham Banks apartment development to the north and west. The development will consist of: i) demolition of a) 2 no. existing 2-3 storey derelict buildings at no.’s 105 & 107 Emmet Road, and b) 1 no. 2-3 storey existing residential building at 109 Emmet Road; ii) construction of a 3-5 storey mixed-use semi-detached development comprising of 16 no. residential units over 5-storeys, (9 no. 1-bedroom, and 7 no. 2-bedroom units), and 1 no. commercial unit at ground floor level, all with balconies to east or south; iii) construction of detached single storey bin store to north of site at lower ground floor level; iv) boundary treatments; v) provision of bicycle parking; vi) landscaping, SuDS drainage and all ancillary works necessary to facilitate the development.Grounds not yet categorised
    Decision24 September 2025View record
  30. © OpenStreetMap
    WEB2678/24Granted

    Curlew Road Health Centre (D12 KF85), Mother McAuley Day Care Centre (D12 C432) and Alzheimer's Society of Ireland (D12 XE62) at Curlew Road, Dublin 12

    The development will consist of: -The demolition of all existing structures on site (known as HSE Health Centre, Mother McAuley Centre and Alzheimer’s Society of Ireland); -The construction of a new 1-3 storey building (for the following uses Primary Care Centre(HSE), Creche and Day Care Centre (Mother McAuley Centre) and Day Care Centre(Alzheimer’s Society of Ireland) with a total gross internal area of c. 4,041 sq.m and associated landscaped courtyards and roof terraces; -Provision of signage to the Primary Care Centre, Alzheimer’s Society of Ireland and Mother McAuley Centre, and site wayfinding signage; -Provision of a new public space at the south-east and south-west corner of the site with direct access to the Primary Care Centre and Creche entrances and associated landscaping and hardscaping; -Provision of a relocated vehicular access onto Curlew Road with gate at the western site boundary, and the addition of a gates to the existing vehicular entrance to the eastern boundary; -Provision of a new consolidated car park providing 55nr. car parking spaces, 3nr. van spaces for the Mother McAuley Centre and Alzheimer’s Society of Ireland and 2 No. set down areas; -Provision of 3nr. motorcycle parking spaces and 18nr. sheltered bicycle parking and 18nr uncovered bicycle parking spaces to serve the proposed development; -Partial demolition of sections of the existing north boundary wall; -All associated and incidental site development and infrastructural works including site clearance, incidental works/removal of existing boundary wall/railings, new boundary treatments and gates, pedestrian footpaths, plant and pv panels at roof level, green roof areas, removal of trees, bin stores, substation / switchroom and all associated landscaping and hardscaping.Decision record indexed
    Decision24 September 2025View record
  31. © OpenStreetMap
    2560332Granted

    O'Halloran Rd, National Technological Park, Castletroy Limerick

    The installation of a Solar Photovoltaic (PV) Farm 1MWp (1Megawatt peak) system (1.829 hectare in size) on the existing greenfield area on the north west side of their existing 2.7 hectare campus at O’Halloran Road, National Technology Park, Castletroy, Co. Limerick, Ireland, The Solar Farm will consist of metal PV frames at ground level, an electrical equipment enclosure, hardcore gravel access roadway, perimeter fencing to match local park finishes, making good to existing landscaping, revisions to existing carpark, underground service trenches, and associated site works. This application relates to development, which comprises an activity, which holds an Industrial Emissions Directive Licence (Reg. No. P0973-01)Decision record indexed
    Decision23 September 2025View record
  32. © OpenStreetMap
    2560527Granted

    Unit 301 IDA Industrial Park, Cork Road co. Waterford, Waterford Ireland

    The demolition of existing store (39.2 sq.m) and existing shelter (61.1 sq.m) on the West Elevation and existing plant enclosure (75 sq.m) to the North of Unit 301. The construction of a new 308 sq.m single storey Warehouse Extension (7.91 metres high) and a new 35.76 sq.m stand-alone Laboratory Consumables Store (5.5 metres high) complete with all associated site works and servicesDecision record indexed
    Decision18 September 2025View record
  33. © OpenStreetMap
    24/5935Granted

    Carrigaline Town Centre Carrigaline West Carrigaline Co Cork

    Permission for the construction of a mixed use development at Carrigaline Town Centre on a 1.84 ha site consisting of 88 no. residential housing units (23 no. 1 beds, 47 no. 2 beds and 18 no. 3 beds). 5 no. ground floor retail units are proposed in the form of a café, gym, hair salon, day care and news agents comprising 886.3 m2. Permission is also sought for the development outlined herein as well as 48 no. car parking spaces and 128 no. bicycle parking spaces. Pedestrian access is proposed to the east off Main Street R611 and to the north of the site off Pottery Road, vehicular access is proposed to the west and will be a continuation of the existing public street. Permission is also sought for all associated drainage, landscaping, bin storage, plant, set down areas, delivery/loading bays etc. and all associated site development and infrastructure works. A Natura Impact Statement will be submitted to the Planning Authority with the application.Decision record indexed
    Decision17 September 2025View record
  34. © OpenStreetMap
    2560851Refused

    Knocknagee, Co Kildare, R93 PD78

    Retention permission and permission for development that consists of: Existing pre-1963 self-contained unit with altered independent access, retention of four no. single-storey commercial units in use as industry and warehousing; additional vehicular entrance to the north of the site, storage and parking yard; signage, site lighting. landscaping and boundary treatments and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including permission for a new wastewater treatment system and percolation area, (Note: a small portion of the subject site and an additional building is in Gorteengrone, Co. Carlow which is the subject of a concurrent planning application Carlow Co. Council Pl. Ref. 2560051)Grounds not yet categorised
    Decision17 September 2025View record
  35. © OpenStreetMap
    2560289Granted

    Supervalu Nenagh, 61 Kenyon Street & Abbey Street, Nenagh Co. Tipperary

    A) demolition of single storey entrance lobby, single storey stores and two storey stores to the East elevation, b) revised shopfront to Kenyon Street (West Elevation) to include new shopfront, signage and glazing at ground floor level, window replacement at first and second floor levels and revised lighting, c) revised shopfront to Abbey Street (North Elevation) with associated signage and glazing, d) revised rear (East) elevation to provide new shopfront, wall finishes, glazing and associated signage, e) internal alterations to accommodate new retail fitout at ground floor level and ancillary areas at first floor level, f) installation of external plant area at roof level, g) revised car parking layout, construction of low-level wall with railing above along the Northern boundary, installation of Deposit Return Scheme Unit and all associated ancillary site and drainage worksDecision record indexed
    Decision16 September 2025View record
  36. © OpenStreetMap
    2560728Granted

    Ardhu House, Ennis Road Roses Avenue, North Circular Road Limerick.

    Amendments to the permitted Large-Scale Residential Development (LRD), Limerick City & County Council Register Reference 23/557; An Bord Pleanála Reference ABP-319721-24 comprising as follows: (i) the approved LRD development pedestrian-only entrance at the existing vehicular entrance on Roses Avenue is to be upgraded to a vehicular, cyclist and pedestrian entrance, (ii) the approved vehicular and cyclist entrance on Roses Avenue is to be amended to a pedestrian and fire tender only entrance, (iii) omission of 1 no. 1-bed apartment and provision of 1 no. 2-bed apartment all at ground floor level of Block 5 to provide for revised vehicular access route to the approved car park. There is no change to the overall number of apartments permitted in the LRD scheme, (iv) re-location of bike store. Ardhu House is a Protected Structure, RPS Reg. No. 3281Decision record indexed
    Decision16 September 2025View record
  37. © OpenStreetMap
    25113Granted

    52 Brayton Park, Kilcock, Co Kildare

    For 1. The conversion of the attic space into additional bedroom with dormer window facing north east and skylight windows facing south west together with internal modifications and all with proposed site development worksDecision record indexed
    Decision16 September 2025View record
  38. © OpenStreetMap
    2560463Granted

    Units GD3B & GF4 Keltic Business Park, Clieveragh Industrial Estate, Listowel Co. Kerry

    We, Resilience Healthcare Ltd. intend to apply for Permission for development at this site GF3B & GF4 Keltic Business Park, Clieveragh Industrial Estate, Listowel, Co. Kerry The development will consist of: a) Amalgamation of existing ground floor units GF3B & GF4 b) Change of use from Vehicle Repair Workshop and Storage to Day Care Service for the provision of daytime care for vulnerable persons c) Removal of existing roller shutter door and installation of new glazed screen and entrance door to North Elevation. d) Installation of new high level window to West elevation e) Erection of window manifestations to North & East elevations f) Associated alterations to existing elevationsDecision record indexed
    Decision16 September 2025View record
  39. © OpenStreetMap
    2560997Refused

    Carraghy, Co. Galway, Co. Galway

    To construct a new service station and associated site development works. The development will consist of; 1. The provision of a vehicular entrance from the N83; part of a proposed footpath cycleway to the north-east to tie into the existing footpath network, associated works to carriageway including modification of existing footpaths, removal of central median and creation of right turn lane with a new ghost island junction, proposed footpath at the front of the site to the east to tie in with existing footpath network, existing lamp post-ESB pole relocation and associated ancillary works; 2. Provision of 6 no. fuel pump island car/van forecourt with canopy over (maximum height of c. 4.50m), 2 no. diesel fuel pump HGV forecourt with canopy over (maximum height of c. 6.50m), Air pumps and LPG stations together with underground fuel storage tanks and ancillary pipe works; 3. A two-storey service station building (1,170sqm total gross floor area) with a maximum height of c. 7.950m. The ground floor will comprise of a convenience retail store (net retail floorspace 100sqm), a food court with 3 no. food providers (including a drive-thru facility), with communal seating area including external terrace seating, W. C. facilities; ancillary food preparation, storage, servicing areas, and office space. The first floor will comprise of additional food court seating area, W.C. facilities, and ancillary office, storage, and servicing areas; 4. Parking for 80 no. cars including provision for 18 no. EV spaces, disabled parking, 13 no. HGV, 4 no. coach parking, and 36 no. covered bicycle parking spaces; 5. 1 no. illuminated totem commercial sign (measuring c.6.5m in height) at the vehicle site entrance; 1 no totem commercial sign on the north side of the site, signage on the services building and canopy (illuminated and non-illuminated); 6. New pedestrian and cycle route through the site to connect to the bus stop at the northeast of the site; 7. Revised boundary treatments, public lighting, and ESB substation; 8. Hard & Soft Landscaping throughout the site, including external seating areas; 9. On-site wastewater treatment plant, surface water drainage proposals, and connection to public water supply to serve the development; together with all associated site works and services. Gross floor space of proposed works: 1,170.00 sqmGrounds not yet categorised
    Decision16 September 2025View record
  40. © OpenStreetMap
    WEB2229/25Granted

    26 Clyde Road, Dublin 4

    PROTECTED STRUCTURE & CHANGE OF USE: Works will consist of: change of use of the building from office use to a single residential house (as previously granted under Reg. Ref: 4007/24). Construction of a part single storey, part two storey extension to the side and rear, including a double height space. Internal alterations to the existing building including: closing up of interconnecting doors with 27 Clyde Road, removal of stud partition walls on all floors, relocation of some door openings, the replacement of the stairs from lower ground floor to upper ground floor, laying a new concrete floor slab to the lower ground floor with insulation and underfloor heating. Form two new window openings at upper ground floor level on the North-west facade, replacement of uPVC windows to the rear with new up-and-down timber sash windows, refurbishment of existing sash windows to the front and side of the house, replacement of front door with new door to original detail, the alteration of three windows to form door openings and repointing of the brickwork to the front facade. New mechanical and electrical installation including new electrical and gas meters to the front of the house in accordance with Bord Gais and ESB standards. New bathrooms fit outs. New surface water drainage. Landscaping works including gravel parking area to the front and paved terrace to the rear. Widening of the existing vehicular entrance.Decision record indexed
    Decision16 September 2025View record
  41. © OpenStreetMap
    2560483Granted

    Lands at Dundalk North Business Park, Armagh Road, Sportman Hall Co. Louth

    The development will consist of: (1) Construction of a light industrial / manufacturing facility [c.15,967sq.m GFA / height c.14.57m]. The main facility will include manufacturing and warehousing areas at ground floor, with production offices and storage at first floor / mezzanine-levels. Ancillary uses will consist of research and development (R&D) and office space, a reception / showroom, stair and lift cores, circulation areas, and staff welfare amenities, all extending over two floors in the north and west of the facility. (2) A pedestrian and vehicular access and egress point to the west of the facility and a HGV access and egress point to the south-west of the facility, both connecting to the internal road network of the Dundalk North Business Park. (3) Provision of 200 no. car parking spaces, including 10 no. accessible spaces and 40 no. electric vehicle (EV) charging spaces, and 14 no. motorcycle parking spaces, located to the west of the facility. (4) Provision of 40 no. covered bicycle parking spaces, located to the north (10 no. spaces) and west (30 no. spaces) of the facility. (5) A service / marshalling yard to the east and south of the facility. (6) Provision of out / utility buildings [c.1,329.9sq.m. GFA], shelter structures, external storage, battery storage, plant, a generator, a transformer, sprinkler tank and pump house. (7) An ESB substation and switchroom to the north-west of the facility. (8) A R&D yard to the north of the facility, comprising of varying terrains and slopes, a viewing platform, a machine wash area, a machine compound, and a bio-retention SuDS area. (9) Provision of site lighting, security fencing, and gates. (10) Installation of PV panels at roof level. (11) Erection of building mounted signage on the north, east and west elevations [(c.5m high x c.3m wide) x 3 no. signs] and an illuminated totem sign located at the facilities main entrance [c.2m high x c.1m wide]. (12) The erection of a retaining wall, an acoustic fence, and a berm with screen planting along the eastern boundary, and a berm with screen planting to the north and west of the R&D yard. (13) All hard and soft landscaping works, including the provision of SuDS features, surface treatments, planting, and boundary treatments. (14) All associated site development works, including above and below ground services, on a site of c.6.39ha.Decision record indexed
    Decision15 September 2025View record
  42. © OpenStreetMap
    258003Granted

    Beechpark Machinery Yard, Beechpark, Ennis Co Clare

    To carry out the following development: for Beechpark Machinery Yard building & site upgrade, proposed works to include: 1) Construction of a new 162m2 storage shed located at the rear (north) of the site. 2) Reroofing and recladding of the existing warehouse and office building. 3) Provision of 47 no. car parking spaces, 7 no van parking spaces, 7 no. rigid lorry bays and 3 no. articulated lorry parking bays & 2 no. accessible parking bays. 4) Provision 9 no. EV Charging spaces. 5) Removal of existing boundary fencing and entry gate and provision of new palisade boundary fencing with sliding entry gate. 6) Demarcation of new pedestrian crossing area. 7) Installation of solar panels to southwest facing side of main warehouse and office building roof. 8) Provision of rainwater harvesting system and new surface water attenuation area. 9) Provision of service area for mobile library. 10) All ancillary site works and services. In accordance with the habitats Directive, Appropriate Assessment Screening has been carried out on the project, and the screening report accompanies this application. In accordance with Articles 81 and 120 of the Planning & Development Regulations 2001, (as amended), Clare County Council has concluded from an EIA screening determination that no significant effects on the environment are likely as a result of the proposed development and that an Environmental Impact Assessment is not requiredDecision record indexed
    Decision15 September 2025View record
  43. © OpenStreetMap
    2560351Granted

    Oakley Park House, Oakley Park or Laurencetown Kells, Co. Meath

    The development will consist of: Demolition of a modern single storey annex & the construction of a new two storey over basement extension to the rear/ North of the house together with various internal & external alterations and repairs to the existing house, removal of remaining fill material in the unroofed basement structure & external areas & the restoration, alteration & repairs to the basement storey including the unroofed structure and external basement areas, replacement of existing modern mechanical and electrical services throughout, a new garden terrace over part of the existing basement storey & associated landscaping and site works including the decommissioning of an existing septic tank and the provision of a new proprietary waste water treatment system. Permission is also sought for retention of the removal of modern fill material from the existing unroofed basement structure & external basement areas. This is a protected structure.Decision record indexed
    Decision12 September 2025View record
  44. © OpenStreetMap
    2560704Granted

    Waterways Ireland Shannon Navigation, Limerick Navigation Abbey River and Shannon River (center point ITM easting 558124 northing 658029) and Park Canal (ITM Eating 559079 Northing 657734), Limerick City

    The development, Limerick Navigation and Park Canal 5-year Maintenance Works along the Abbey River and Shannon River Navigation from Quay Lock to Ardnacrusha Tail Race junction and the Park Canal, in the townlands of Rebouge, Rebouge Island, Park, Monamuck, Irishtown, St. Francis Abbey, English Town, King’s Island, Corbally, Monabraher, Co. Limerick., will consist of essential maintenance works along the Shannon Navigation and Park Canal, as outlined in the Construction Environmental Management Plan (CEMP) submitted with the planning application and in accordance with Waterways Ireland’s statutory remit comprising of the following: • Removal from the navigation, along the Abbey River and River Shannon to the Ardnacrusha Tail Race, overhanging branches and infringing trees (including dead trees) that have fallen over more than 60 degrees out into the navigation channel causing a hazard to passing vessels. • Maintenance of overgrown vegetation impacting and overgrowing the water portion of the Park Canal, aquatic weed management as required, and removal of debris and litter. • Maintenance of the south back drain associated with the Park Canal. • Removal of vegetation impacting Park Canal structures and undertaking necessary physical minor repairs to Quay/Limerick Lock Chamber and associated Footbridge, Troy’s/Park Lock Chamber and Park Bridge and associated canal or lock wing and quay walls. The proposed works will involve maintenance to, but not altering the materials or the character of Protected Structures No. 6063 Canal Footbridge at Lock Quay and No. 6064 Canal Quay and Lock Walls at Lock Quay. The vegetation works will involve working within close proximity to or within the curtilage of, but not undertaking any works to, RPS No. 3478 Stone and Brick buildings at Quay Lock, RPS No. 3319 Lock Quay Carriage Arch, RPS No. 6058 O’Dwyers Bridge and RPS No. 3314 Athlunkard Boat Club An Ecological Impact Assessment (EcIA) and Natura Impact Statement (NIS) accompany the planning applicationDecision record indexed
    Decision11 September 2025View record
  45. © OpenStreetMap
    2560314Granted

    Arden, Tullamore, County Offaly

    Amendments and modifications to the permission granted for 98 residential units (including 36 no. apartments within three duplex blocks) under Planning Ref. 21/327 (no change is proposed to the number of dwelling units or dwelling mix). This application is being made concurrently with an application for modifications to the permission granted under Planning Ref. 21/328 on lands to the east. This development will consist of: - Elevational and design changes to all dwelling units including materials, fenestration, canopies, PV panels and omission of chimneys; - Addition of side passages to a number of houses to enable direct access from the front to the rear gardens of several dwelling units (units 149, 150, 159, 160, 169, 170, 187, 188); - New universally accessible parking space off the permitted vehicular access road to the west of the block of duplex units 102-113 that were permitted under Planning Ref. 21/327 (also being applied for under concurrent application); - Relocation of the permitted bin and bike storage serving three blocks of duplex units 129-140, 117-128 and 102-113 of the permitted development; - 1 no. new substation adjacent and to the north of the permitted vehicular access road from Arden Road (also being applied for under concurrent application); - Modifications to driveways and increase in private amenity space to serve houses throughout the permitted development; - Finished floor, ground and road levels reduced throughout; - Front garden boundary walls of dwelling units replaced with hedging; - Rear garden, side boundary walls to be replaced by concrete post with infill timber panel boundary to each dwelling unit; - Modifications to road layout and parking spaces throughout the permitted development; - Rationalisation of permitted open space to reflect the changes in the overall layout; and - Amendments to all site development works, attenuation, foul and storm water drainage network, hard and soft landscaping, lighting, fencing, and signage as well as connection to permitted development as granted under Ref. 21/328, and proposed to be amended under concurrent application.Decision record indexed
    Decision10 September 2025View record
  46. © OpenStreetMap
    WEB2145/24Granted

    Beaumont Hospital, Beaumont Road, Dublin 9, D09 V2N0

    Two number new bike storage units to be located at two separate locations within the Beaumont hospital campus, one to the north-east of the Ashlin Centre and one adjoining an existing surface level car park to the east of the Trim Road entrance. Each bike storage unit will be an enclosed, covered single-storey structure with racks to accommodate 56 no. bikes and additional, dedicated space for parking cargo bikes. The gross development floor area of the new build elements will be 138 sq.m.Decision record indexed
    Decision10 September 2025View record
  47. © OpenStreetMap
    2560090Granted

    46 Revington Park, North Circular Road, Limerick

    The construction of a shed with gym and all associated site worksDecision record indexed
    Decision09 September 2025View record
  48. © OpenStreetMap
    2560220Granted

    Block E University of Galway, University Road, Galway City

    Permission for development which consists of: The University of Galway are applying for planning permission to Galway City Council to facilitate the development of a new School of Medicine at a site located at the University of Galway, Co. Galway. There is an existing building, known as Block E, located on the site. Block E is a protected structure (RPS No. 10309 - Civil Engineering Block). There are 4 no. other protected structures in the vicinity of the subject site including RPS No. 10310 (Dept. of Education Block), RPS. No. 8501 (rivers & waterways, including embankments and walling), RPS No. 10308 (Former IMI Building) and RPS No. 10307 (Martin Ryan Institute). The proposed site extends to 0.36 hectares. The development will consist of: 1. Demolition of the existing 3-storey extension of Block E and the existing prefabricated building to the immediate north-east of Block E and the removal of 20 no. car parking spaces. 2. The construction of a part 4-storey building to accommodate teaching, research and administration facilities for the School of Medicine. The proposed building extends to c. 3,925sqm and has an overall maximum height of c. 20.7m. 3. The ground floor consists of tutorial rooms, a seminar room and a collaboration zone. The first floor incorporates further seminar rooms and study areas. The upper floors contain seminar rooms, research labs, bench space areas, meeting rooms and offices. 4. Restoration of the original northern elevation of Block E and the provision of a glazed atrium link connecting Block E to the proposed building. 5. Provision of landscaping, bicycle parking and public lighting. 6. Provision of plant and photovoltaic panels at roof level of the proposed building. 7. Provision of all associated surface water, watermain and foul water drainage services and connections (including nature-based drainage solutions) and all associated site works and ancillary services necessary to facilitate the proposed development. This application is supported by a Natura Impact Statement (NIS).Decision record indexed
    Decision09 September 2025View record
  49. © OpenStreetMap
    2560745Granted

    The Lidl site at lands to the west and north of Saint Peter and Saint Paul’s Catholic Church, Main Street, Dunboyne Co. Meath

    Retention permission for development which consisted of: the relocation and construction of the ESB substation building from its permitted location on the northern boundary of the site to the north east boundary of the site. Permission is sought for development that will consist of: (1) amendments to the car parking layout of the development to facilitate 4 Electric Vehicle (EV) parking spaces (serviced by two 50KwHr chargers) and 2 operational spaces for staff; and 20% of other parking spaces ducted for future EV parking. (2) The proposed development includes an updated lighting scheme and underground drainage proposals as well as updated path and curbing details. (3) The proposed amendments are in contravention of condition 12 of ABP Ref: ABP-315651-23. The proposed levels of EV parking and ducting are in accordance with the standards set out in the Meath County Development Plan 2021-2027. (4) All works necessary to carry out and complete the developmentDecision record indexed
    Decision05 September 2025View record
  50. © OpenStreetMap
    WEB2502/24Granted

    Corner of Brunswick Street North and Church Street Upper, Dublin 7

    PERMISSION The development will consist of the following: 1) The demolition of existing walls within the subject site and the construction of a housing development scheme divided into 2 no. apartment blocks (A and B) ranging between 3 - 6 no. storeys in height. 2) The new development comprises 34 no. residential units (each with private balconies/winter gardens/rear gardens): • Block A (6 no. storeys): - Comprises an entrance lobby (c.44.2 sqm - fronting Brunswick Street North), a commercial retail unit (c.114.4 sqm - fronting both Church Street Upper and Brunswick Street North) including a bin store (13 sqm) and circulation space (3.6 sqm), a bike store (28.5 sqm) for a total of 28 no. bicycle parking spaces (including 2 no. cargo spaces), a bin store (19.4 sqm), and a plant room (13.8 sqm) all located at ground floor level, and - 28 no. residential units (16 no. 1 bed units & 12 no. 2 bed units). • Block B (3 no. storeys): - 6 no. residential units (3 no. 1 bed units & 3 no. 2 bed units). 3) 2 no. pedestrian access points to residential units, from Brunswick Street North and Church Street and 1 no. public pedestrian access point to the commercial retail unit from the corner of Brunswick Street North. 4) Communal open space in the form of a courtyard area (208.3 sqm) for residential use, including 3 no. separate areas for bicycle parking for a total of 38 no. bicycle parking spaces in the form of a bicycle shelter (30 no. spaces) and 2 no. separate bicycle parking areas (4 no. spaces in each - totalling to 8 no. bicycle parking spaces). 5) The associated site and infrastructural works include provision for surface water drainage services and connections, attenuation proposals, green/blue roofs, landscaping/public realm works, boundary treatment and all associated site development works.Decision record indexed
    Decision05 September 2025View record