To construct dwelling house, attached garage, waste water treatment system, percolation area, entrance and all associated site works
To construct a private garage to rear of private dwelling house along with all associated site works and services
For the following; 1. Two storey dwelling including garage structure to rear, 2. new entrance gate, piers and driveway 3. effluent treatment system percolation area and bore well 4. and all necessary site works and services
To revise the boundaries granted under reference P21/408, thus reducing the site area
To construct a single storey extension to the side of the existing dwelling house, including site services and all ancillary site works
Of 1. the existing Garage as built on site 2. the site boundaries which are altered from those granted under Ref P8/13066 & PERMISSION to upgrade septic tank on site
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
For development which will consist of (1) A revised house and garage design to that previously granted under Planning Ref. P21-817. The revisions will include for additional ground floor area to the site and rear of the dwelling, with changes to elevations and internal layout. (2) Site works and waste water treatment, all as previously granted under Planning Ref. P21-817
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a new dwelling house and a private garage, new entrance and sewerage treatment facilities along with all associated works
For the construction of a dwellinghouse with integrated auxiliary living accommodation, garage & proprietary waste treatment plant, bored well & road entrance including ancillary site works
Of upper floor garage
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
For (a) to refurbish and reroof and for a change of use of an existing outbuilding from storage use to accommodation use ancillary to the existing house, and to construct a new extension and (b) To refurbish and reroof an existing barn to include a roof mounted PV solar array, and to construct a new glass house and ESB switch room/ services building, all located close to a protected structure ref RPS no. 640.
To construct a new dwelling house, septic tank, sewerage treatment system and access to the public road
To repair and reroof an existing outbuilding located close to protected structure (ref RPS no. 640)
To remove an existing greenhouse superstructure and to construct a new greenhouse, restore and rebuild an existing outbuilding structure and to reroof in part, all located close to protected structure ref RPS no. 640.
For the development of a dog park with shelter, parking area, modifications to existing entrance, signage and all associated site works to facilitate the proposed development
To construct a private dwelling house, garage, wastewater treatment system and ancillary site works at the above address.
The development will consist of the construction of a slatted unit and associated site works
(Ref No. P19/202 of Outline Permission) to construct a private dwelling house, garage, wastewater treatment system and ancillary site works
To construct a new dwelling house, private garage, site entrance on-site waste water treatment system and all associated site works
For development, the development consists of the construction of a slatted unit and associated site works
Of a separate garage to the side of the existing dwelling house
For (a) Renovation of the exiting bungalow (b) storey and a half extension to the side of the existing bungalow and all associated site works and connections to existing services
For the construction of a slatted shed along with all necessary ancillary works
For development as follows: Demolition of existing storage building, construction of extension and alterations to existing dwelling house, construction of detached garage behind house with all associated site works and connections to existing services
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To demolish existing outhouse, construct an extension to both sides of existing dwelling house to include associated renovation works and site works
To construct a single-storey dwelling house, detached garage, entrance, boundary walls, waste water treatment unit and polishing filter and all associated site works
The construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
To RETAIN garage as constructed together with all ancillary site development works and services
To: 1) Revise the Site Boundaries and 2) retain a storage shed as constructed and associated site works
For development at Newmarket-on-Fergus Wastewater Treatment Plant in the townland of Boheraroan, Newmarket-on-Fergus, Co. Clare and an associated rising main traversing the townlands of Ballyconneely, Ballynacragga, Boheraroan, Dromoland, Latoon North, Latoon South, Manusmore, Newmarket and Rathfolan, County Clare. The development will compromise proposed works within the existing Newmarket-on-Fergus Wastewater Treatment Plant, including: a. 1 No. 7.8m high storm storage tank with minimum storage capacity of 516m3, measuring approximately 11m diameter. Between 3.6m - 5.0m will be above ground level, the remainder will be buried below ground level b. New below-ground discharge pumping station with associated below-ground valve chambers and wet well c. New 4.1m high tertiary treatment system (including 2 No. tertiary filter units and flocculation tank with a volume of 8m3) d. 2 No. 2.7m high chemical storage tanks (each with a volume of 7.5m3) e. Electrical control kiosk (6.4m L x 5.2m W x 2.5m H) f. Standby generator g. Diversion of the flows from the existing final effluent pump chamber via 110m of 300mm external diameter sewer to the new discharge pumping station. The proposed development will also include: h. Construction of approximately 4.4km of 400mm diameter outfall rising main from the proposed pumping station to the proposed outfall diffuser within the River Rine i. An outfall diffuser with three diffuser heads of 225mm diameter located within the River Rine foreshore j. All ancillary works site development works including site preparation works, hardstanding, site clearance, ground levelling and site drainage as required to facilitate the development. This application is accompanied by a Natura Impact Statement (NIS).
For development which will consist of (1) The demolition of an existing derelict dwelling house (2) The construction of a new dwelling house and garage with a proprietary wastewater treatment system and ancillary site works
To construct a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works
To decommission and remove existing septic tank, install secondary treatment system and polishing filter
To extend the existing dwelling house to the rear to provide a new kitchen/dining area and to the side to provide an attached Granny Flat & all other associated site and ancillary works
The development will consist of planning PERMISSION for a period of five years to construct and complete a Solar PV Energy development with a total site area of 16.08 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, watercourse crossing, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
To construct a new agricultural entrance onto the public road including site works
To develop a motorway service area and rest area adjacent to Junction 12 of the M18 motorway, which will include service station building with convenience shop, food court, staff facilities, canopy, fuel facilities, parking and circulation space, children's play area, picnic area and access provision. The development also includes infrastructural works public lighting, signage, landscaping, internal fencing, electrical substation, sixteen electric car charging points, roof mounted solar panels, storm water runoff, petrol interceptors and attenuation system, on-site wastewater treatment plant including access road, pumping station and connection to public foul sewer, drainage improvement works, underground fuel storage tanks, rain water harvesting system, connection to public water supply, underground storage tanks for fire-fighting purposes, underground rain water harvesting tanks, works to improve visibility at access point, upgrade to adjacent roundabout and ancillary works. The connection to the public sewerage system will be by means of a rising main to an existing public sewer. The rising main sewer will cross under the M18 motorway by directional drilling and thereafter underground via existing road margins/public road and under River Fergus and railway line through the townlands of Kilbreckan, Killow, Skehanagh, Clareabbey and Ballybeg. The inert soil from the directional drilling will be used in landscaping works on the site of the service station building. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
The development consists of the construction of a slatted unit and associated site works
For development, the development consists of the construction of a slatted unit and associated site works
To construct an entrance, dwelling house, garage, waste-water treatment system and soil polishing filter together with all associated site development works and services
For development, the development consists of the construction of a slatted unit and associated site works
To construct dwelling house, shared entrance, waste water treatment system and percolation area, bored welll plus all ancillary site works
The development will consist of the demolition of existing boundary walls, demolition of existing single storey six classroom school building of 685sq.m demolition of existing open shed of 25sq.m and demolition of prefabricated classroom building of 207 sq.m. The existing 4no. Classroom block constructed in 2011 with a gross floor area of 370sq.m will be retained and integrated into the new school. The new development consists of new two storey primary school building with a gross floor area of 1720sq.m. New accommodation consists of 8no. new Classrooms, a General Purpose Room and ancillary accommodation. In addition, site works include the replacement of the existing gated entrance with 2no. new gated vehicular and 2 no. new separate pedestrian entrance off the Knockanean Road boundary, serving 24 no. on site car parking spaces and associated set down areas, pedestrian pathways, together with 2 ball courts, play areas, a bin store, a bicycle shelter, gas tank enclosure, 3no. flagpoles, connection to existing foul drainage treatment system, separate surface water drainage, signage, landscaping and all associated site works on an overall site area oof 1.34 hectares. The building will be set back 63.285m from the Knockanean Road