Permission to construct an extension to rear of dwelling to connect existing home office (22.6sq.m) to the main dwelling & all associated site development works.
Retention permission for side porch. And a single storey extension to rear.
Amendment to Unit A of Tramway Lane (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit A has permission for commercial / retail use. The proposed amendment is for change of use to Dentist. The development will also include a single storey plant area located to the rear / north side of the premises. The proposed amendment includes all associated site services and development works required to facilitate the proposed change of use.
Construction of a single storey side and rear extension to the existing dwelling and all associated ancillary site works.
Planning Permission is sought for Demolition of existing outhouses, and Renovation and extension of existing dwelling to include construction of new two storey extension to rear comprising ground floor kitchen/dining/living room and first floor bedroom with en- suite bathroom and walk-in wardrobe, and associated site works.
Amendment to Block D4 of the Strategic Housing Development permitted under ABP-310570-21. The proposed amendment to Block D4 is for a reduction in height to 9 storeys (from 13 storeys) and associated reduction in the number of units to 44 (from 60 units); Block D4 will have 4 one beds (no change), 34 two beds (down from 46) and 6 three beds (down from 10) all with associated private balconies/terraces to the north/south/east/west elevations; This will result in the reduction in the total number of residential units across the entire development site from 421 residential units to 405 residential units; Block D4 will also provide 564sq.m residential amenity space at ground floor level (an increase of 9sq.m); Minor amendments to the southern elevation are also proposed. The application includes for all site services required to facilitate the amendment to Block D4.
The development for which retention permission is sought consists of the reconfiguration and internal alteration of the permitted ground floor layout of Block F (including plant room layout) whereby the permitted Retail Unit (42 sq.m) and Café / Restaurant Unit (176.5 sq.m) (as permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref's SD22A/0299 and LRD24A/0009W) have been augmented into a single amalgamated unit of approximately 220 sq.m in floor area, together with external alterations to the northern and western elevations of Block F at ground floor level to include the omission of a plant room door from the northern elevation and provision of same to the western elevation together with a reduction in the glazed area to the western elevation. The proposed development for which permission is sought will consist of a proposed change of use of the retained amalgamated unit at ground floor level within Block F from its permitted Retail and Café / Restaurant uses (as permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref's SD22A/0299 and LRD24A/0009W) to a Medical Clinic / Group Practice (220 sq.m) use.
The development will consist of amendment to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit B (c.257.2 sq.m) has permission for commercial/retail use. The proposed amendment to Unit B consists of the incorporation of an off-licence area within the permitted retail unit (c.13.3 sq.m). The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block (on lands located north of the Luas red line and Fortunestown Luas stop.
Single-storey flat roof extension to the front with new entrance door, window, and two rooflights; attic conversion for storage with new dormer window and rooflight to the rear roof slope.
Removal of existing roof and construction of a new pitched roof with dormer windows to accommodate two office spaces over existing office along with a change of use of existing residential apartment to office space at ground floor level and all associated site works.
To construct a single storey modular structure approx. 115m2 to existing warehouse dispatch area.
Single storey warehouse extension of 150sq.m to the south of the existing warehouse together with ancillary works including site landscaping and drainage.
Amendments to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21) and Large Scale Residential Development (SDCC Ref. LRD23A/0007) to include a single storey plant area to the rear, beside the permitted cycle stores. The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block.
Construction of a four-storey apartment block ( 4224 sq.m) consisting of 58 age friendly residential units comprising 20 one bedroom units and 38 two bedroom units with associated private balconies, associated lift and stair cores, entrance lobby, and circulation space; Provision of a community facility (99.3 sq.m) and ancillary accommodation including refuse store (26.9 sq.m), cycle store (36 sq.m), plant room (46.2 sq.m), sub-station (14 sq.m), switch room (16 sq.m), landscaped public open space (907.4 sq.m) and communal open space (1225.6 sq.m), and 30 car parking spaces and 80no. cycle parking spaces to serve the development; Vehicular access to the development will be provided via an upgraded entrance from Tay Lane with a minor pedestrian access provided from Eaton Drive to facilitate direct linkages to the town centre; Planning permission is also sought for all ancillary site and development works above and below ground to facilitate the development including the provision of internal access roads and pedestrian / cycle pathways and linkages, boundary treatment, public lighting, hard and soft landscaping, services, rooftop PV panels and associated signage.
Construction of a residential scheme comprising 421 units, offices, retail units x3 and residential amenity areas x2, within 9 blocks ranging in height from 1-13 storeys. The proposal will include 289 car parking spaces along with 650 cycle parking spaces. The development will provide public and communal open spaces throughout including a public plaza adjoining Fortunestown Luas stop. Provision of vehicular, pedestrian, and cyclist accesses to the site, including pedestrian bridge to the public park (under construction) to the east. The application includes for all landscaping, ESB substations, plant areas, bin storage, surface water attenuation and all other site development works, and site services required to facilitate the proposed development. The proposed development seeks to amend SHD permission ABP-302398 -18 (under construction to the west), replacing 32 permitted duplex apartments along with associated amendments to internal roads and open spaces. The current proposal also replaces permission SD16A/0078 previously granted on this site.
Deviations from permission granted under Reg. Ref. No. SD22B/0031 (i)Enclosure of approved open courtyard to habitable space, (ii) 2No. Velux roof lights and sky tube facing north and 1No. Velux roof light facing south, (ii) Increased width of flat roof apex (900mm to 1750mm) (iv) and uPVC window frames to all windows, all to the approved extension
Single storey side and rear extension.
The development will consist of the installation of approximately 658.63 sq.m of Photo-Voltaic Solar Panels onto the existing roof. The solar panels will be used to create green electricity, all of which will be used by building.
Extension of an existing warehouse by approximately 1,685sg.m and the addition of 1 loading dock, extension of existing loading yard and upgrade of 11 parking spaces for E.V charging, 2 spaces to accessible parking spaces, and the addition of 35 covered bicycle parking spaces all on a site of approximately 1.6 hectares in the townland of Fortunestown.
Modifications to rear of an existing two-storey, detached house (Protected Structure Ref. 323) which adjoins the Scout Ireland Hall also a Protected Structure Ref.324; re-instatement of fire-damaged internal linings as per Conservation Report; insert a rear window to ground floor of the existing house; demolish single storey extensions and separate outhouse (22sq.m); construct new slated two-storey & single storey flat roofed extension (70sq.m) to rear to contain a kitchen/dining, 2 bathrooms, stairs and 1 bedroom; modify existing entrance piers and re-construction of missing pier to 2m height with timber gate and ancillary site works.
Expansion of the floor plate of proposed creche/pre-school facility (area 370sq.m) to include adjoining storage space (32sq.m) with revised layout plan to that approved in ref. SHD3ABP-302398-18.
Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
The development will consist of a single storey rear extension to existing clubhouse. The structure will be of steel frame with external insulated cladding panels and all associated site works
A two storey extension to existing house, a new waste water treatment system and associated site works.
A residential development comprising: 526 residential units and all associated site and development works as follows: - 274 3-bed 2 storey terraced units, 185 4-bed 2 and 3 storey terraced and end of terrace units, 67 2-bed apartment/duplex units (37 2-storey, 2 bed terraced duplexes, 18 1-storey 2 bed terraced apartments and 12 1 storey 2 bed end of terrace apartments). The development also provides for a district park (4.58 ha) and a neighbourhood park (0.71 ha) in accordance with the Fortunestown Local Area Plan 2012. Permission is also sought for 789 car parking spaces, bin storage areas, ESB substations and all associated site development and infrastructural works. Vehicular access to serve the proposed development will be provided via two new access points off Garter Lane and via a new signalised junction at the southeastern corner of the site to replace the existing roundabout off Fortunestown Lane. Provision is made for a future access to Bianconi Avenue. In addition, an interim local square is proposed within the subject site providing a direct pedestrian link from the proposed development to the Saggart Luas stop. Two direct pedestrian links are proposed between the subject site and the adjoining school sites permitted under Reg Ref No SD16A/0255 providing a direct link between the school and the proposed district park and a direct link from the west of the school site to the proposed residential development. Lands identified for future development are located along the southern boundary of the current application site adjacent to Fortunestown Lane/Saggart Luas Stop. These areas will be subject of a future planning application (Phase 2) and will include the final design and layout of the local square.
Retention of house No. 78 Rathmill Park, Rathcoole, previously granted planning permission as a 4-bed house under planning Ref. No. SD17A/0101, SD16A/0229, as a 3-bed house with study. Permission is also sought to construct a 2 bedroom house with study attached to No. 78 to form a pair of semi-detached houses, No. 78 being a 3-bed with study and No. 78A being a 2-bed with study.
Construction of cattle shed, dung stead, underground effluent storage tank, concrete yard, cattle crush, farm access road and all other associated site development works.
Proposed Attic conversion with w.c. with dormer roof window on rear slope of roof & 2 no roof lights on front slope of roof all at attic level
Construction of a new two storey attached two bedroom house to the side of the existing house with all associated site and drainage works and for single storey porch extension to front of existing house with revised front driveway to facilitate off street parking for both new and existing houses.
Attic conversion to storeroom and bathroom complete with new dormer windows to front, side and rear of house together with all associated siteworks.
The 71 sq.m development consists of a single storey extension (69 Sq.m.) to the existing restaurant area at the rear of the existing licenced premises and an escape stairs (2 sq.m.) from the existing mezzanine area to the roof of the extension.
Permission for development at An Poitin Stil - A Protected Structure consisting of construction of 20 en-suite bedrooms on the roof of the single storey portion of the existing premises and construction of a new 2 storey access with a lift and stairs to the proposed bedrooms incorporating the existing tower feature on the carpark elevation.
Provision of signage on the north, south and west elevations; Provision of a storage yard, access road, mesh fence and walls to the west of Unit G; Additional door to access storage yard on the west elevation and all associated landscaping and ancillary works to facilitate the development.
Change of condition 4 of previous Reg. SD09A/0277 to increase number of children at existing sessional pre-school service from 10 to 11 at any one time and from 20 to 22 in any one day.
Amend previously permitted application Ref. SD21A/0230 consisting of the installation of two external water tanks and associated concrete slabs, guardrails and access ladders, to the north-east of Units F & G (currently under construction) and all associated landscaping, infrastructure and site development works to facilitate the development.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
Erection of a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the existing concrete apron outside An Poitin Stil car park with 2 No. LED illuminated advertising panels each of 2.0 square metre area.
Demolition of 1 existing dwelling and 4 out-buildings/sheds and the construction of 14 residential units comprising of 6 one bed apartments, 6 three bed duplex apartments and 2 three bed semi-detached dwellings; all with associated private open spaces areas in the form of balconies and gardens, bicycle storage, bin storage, signage, associated drainage, landscaping, boundary treatments and site works.
The Construction of 2 no. 6.50m wide X 3.0m high digital advertising panels (arranged in a V plan 6.50 meters from ground to top of structure) with a 250mm frame all around each
Attic conversion for storage, bay window to rear and single storey extension to rear.
One/two storey dormer style four bedroom house; associated works and water treatment system.
We DSV Solutions Limited intend to apply for planning permission for the inclusion of a new rear elevation canopy to the existing warehouse facility located at Unit F, Mountpark Baldonnell, Baldonnell Business Park, Dublin 22 as follows: Addition of a canopy structure (157m2, 7,42m high) attached to the rear of existing warehouse unit plus directly associated elevational changes and site works.
Residential development of 112 dwellings comprised of: 90 two storey houses consisting of 10 four bed detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 42 three bed semi-detached houses and 28 three bed mid-terrace houses along with 22 one and two bed apartments in a four storey apartment building. The proposed development includes all associated site development and infrastructural works, car parking, bin storage, open spaces and landscaping. Access to the development will be via two vehicular entrances from Garter Avenue. All on a site of 3.74ha bounded to the east by the N82 Citywest Road, to the north-west by Garter Avenue and to the south by lands that will be developed as a Neighbourhood Park (permitted under Reg.Ref. SD15A/0127) in accordance with the Fortunestown Local Area Plan 2012.
Ground floor extension to side; widen driveway entrance and pavement dish to front; new access gates and pavement dish to side with associated site works.
Installation of 1 no. external permanent site back up generator to the north of the site.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Installation of 2No. external non-illuminated lettered signs to the eastern and northern elevations at Unit F, Mountpark Baldonnell.
Installation of 1 no. external air handling unit and associated ductwork to existing Unit F.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.