Attic Conversion with front roof lights, attic yoga/storage spaceand rear dormer window bedroom extension including all associated ancillary works
Convert existing side garage from storage space to living space; single storey extension to the rear of dwelling with skylights; change existing hipped roof to an apex roof with gable; new roof to have a skylight to the front elevation and a new dormer window to the rear elevation; convert existing attic space to living space; widen existing entrance to accommodate off-street parking; internal alterations and all associated site development works.
Demolition of an existing lean-to shed and construction of a single storey domestic extension to the side and to the rear of house.
Combination of single storey and two storey flat roof extensions to the rear of the existing building along with associated internal modifications and siteworks.
Combination of single storey and two storey flat roof extensions to the rear and side of the existing building along with associated internal modifications and siteworks
Demolition of existing garage and construction of new 2 storey side extension; demolition of rear conservatory and construction of new canopy; construction of new dormer structure to rear; construction of 2 new dormer windows to front elevation; internal alterations to floor layouts; construction of new front porch canopy and all associated site works.
Alterations to an existing house including a first floor extension to the rear
Attic Conversion with WC dormer roof window & 1 no rooflight in rear slope of roof at attic Level
Extension to existing above ground natural gas installation; the extension will include a regulator/meter kiosk, boiler/generator kiosk, electrical/instrumentation kiosk, underground and above ground pipework, 2.4m high chain-link and palisade fencing, light/CCTV columns and all ancillary services and associated site works.
Porch and living room extension to front of house and all associated site and drainage works.
Detached three bedroom dormer bungalow house with shared vehicular access; shared parking and all associated development works.
The demolition of existing single storey side shed and the construction of detached two storey (two bed) dwelling to the side of existing house with amended landscaping, additional vehicular access to serve the new house onto Monastery Walk & new boundaries and site works.
370sqm side and rear extension, new entrance, and new facade to front elevation.
Detached four bedroom house with shared vehicular access; shared parking and all associated development works.
Remove existing roof on single storey extension to rear of existing dwelling; demolish garage in rear garden; erect single storey granny flat in rear garden and re-roof existing single storey extension to rear; all ancillary site works.
A) 2-Storey extension to side and front, with a wall proposed on boundary with Property No. 8 St Brigid's Road b) Single storey extensions to front and rear c) Refurbishment including change of fenestration and removal of chimney to rear d) Enlargement of existing vehicular access e) All related works.
Permission for a flat roofed single-storey rear extension, relocation of the second entrance door from the front to side of the building alterations to the window configuration to the front and side, new side gate and all associated site works
Single storey extension to front, side and rear of existing house; internal alterations allowing two bedrooms, lounge, kitchen and new works allowing separate new house for family needs; existing house reinstated; front door with porch to front view; relocating existing foul and waste pipe and all associated site works.
Alterations to an existing two storey dwelling including construction of a two storey extension to the front, side and rear elevations and all associated site development works.
A storey and a half extension to the side and a single-storey extension to the rear. The addition will include a new porch, games room, utility room, kitchen/ dining room and two additional bedrooms. Moreover, the proposal includes widening of the vehicular site access including all associated site works.
Alterations to existing boundary wall/railings; proposals to construct a new pedestrian entrance gate and new concrete path to existing bank with all associated site works.
The development will consist of the material alteration to existing medical centre (150msq) with the proposed expansion of the medical centre to provide additional floor Area (25msq) provided by the proposed reduction of the adjacent existing retail shop area reduced from 96msq to 71msq, new window to the east elevation in accordance with lodged plans and documents to include all associated/ancillary works
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Single storey outbuilding in the rear garden, which is a revision to the garage previously granted under An Bord Pleanala Ref. No. PL06S.247883 and all ancillary site works.
916sq.m new canopy overall height 5.8m over existing external retail area to the north of the existing polytunnel structure together with all associated site works.
Demolish the existing rear extension to the rear of the existing semi-detached bungalow and construct a new extension to the rear with a roof structure to match existing with rooflights; new bay window to side, internal alterations & associated site works.
Alteration to the front domestic south facing elevation consisting of 17sq.m of PV solar panels located on the existing house front roof pitch; alterations to first floor front bedroom windows ope to contain a central self-coloured acrylic render external insulated system on masonry wall to create new window elevational layout; alterations extending beyond the front building line of the domestic south facing elevation consisting of new self-coloured acrylic render external insulated system to ground and first floor level and grey brick slip finish to external insulated system to ground floor bay window walls.
The Development will consist of a single storey extension (totalling 10.1 sqm) located in the rear garden of the existing house and will include minor modifications to the existing ground floor kitchen to facilitate access to the proposed extension. The development will also include associated site works with hard and soft landscaping to the rear garden to accommodate the extension.
Retention Permission for a detached structure in the rear garden which includes Gym/Shower room utility and store with connection to existing services
Extension to existing external freezer plant platform structure to east of existing building and associated site works.
The development will consist of the construction of a single storey Deposit Return Scheme (DRS) Unit (Gross Floor Area: 17 sq. m) comprising of 2 no. signage panel areas for branding on the side elevation of the DRS Unit (1.0m x 2.0m), and all associated site development works. The development will result in the removal of 2 no. existing car parking spaces in the car park that serves the existing Aldi development. There is a Protected Structure on this site.
Single storey rear extension and a front porch extension incorporating internal ground floor modifications, plus all associated site works.
Retention permission for the removal of existing scrub plantation and for the plantation and for the placing of clean broken stone at ground level, for the creation of an overflow carparking area for work vehicles and buses and for the erection of a green mesh fence and galvanised palisade fence to the roadside (Boot Road) boundary. Full planning permission is being sought for the restoration of the existing stone wall that is adjacent to the boot road including proposed trees and all associated site works to the east of existing Green Isle Hotel, Boot Road, Clondalkin 22
Detached dormer dwelling with solar panels in rear garden, car parking, bin/bike store landscaping, new boundaries and car parking and bin/bike store to the front garden 12 Knockmeenagh Road, and all associated site works
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
Existing front glazed canopy for removal; proposed ground floor partial front extension of restaurant with flat roof over, extended floor area 75sq.m; new glazed canopy over to partial area of front facade & installation of 3 new signs on front facade.
Construction of a new two storey house adjacent to the existing house; a new driveway to the front; new garden access gates to the side and all associated site works.
Retention Permission for conversion of the existing garage to habitable space, A side extension at first floor level with double-pitched roof continuing the existing main roof profile and a front dormer window similar to the existing front dormer window. Permission for removal of the existing chimney, A front extension at first floor level with double-pitched roof. A flat-roofed ground floor level extension to the rear and a flat-roofed dormer extension to the rear.
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:•Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. •E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m •Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. •Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m • All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.
Retention of single storey flat roof garage to the side of an existing two storey house.
Erection of a first floor bedroom extension above the existing garage; raise section of the tiled roof to match the existing roof; front of the extension will have a dormer type roof with two windows to the front; convert the existing garage to a study and relocate the front door.
New external Freezer Plant Platform Structure; single storey MRO Stores building within the existing construction compound; external Data Centre unit to the south of the existing Manufacturing Suites Building; airlock extension & relocated external double emergency exit doors to the south of the existing Manufacturing Suites Building; Pallet Storage building adjacent to the existing Drum Store West building within the Utility Yard and boiler Water Chemical Dosing Unit within the CUB yard and all associated site works.
The development consists of a two storey rear extension with tiled roof, 2 bedrooms bathroom, roof lights, open plan ground floor living area with internal alterations and all associated site works.
Conversion of attic space comprising of modification of existing roof structure, new access stairs from first floor and flat roof dormer to the rear.
To Convert the existing attic space to home office/study with the construction of a dormer window in the rear elevation roof plane and addition of two roof lights in the front elevation roof plane.
Permission is sought for construction of a bedroom extension at first floor level to the side of existing house. Alterations to elevations and internal layout. 6 No. of roof lights. Relocation of existing front door, garage conversation and all associated site development works at no. 11 Monastery Crescent, Clondalkin, Dublin 22, D22 K199.
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (4.5m x 1.5m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.1m x 1.4m) is a high level sign to replace existing on the southern elevation. Sign No.3 (4.5m x 1.5m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (6.1m x 2.1m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.6m x 2.1m) is a high level sign to replace existing on the southern elevation. Sign No.3 (5.3m x 2.2m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
Construction of detached double garage (89sq.m) for domestic use in the rear garden and associated works.