Retention Planning Permission for the following: single storey extension (Area 122m2 / c. 6.5m in height) to North elevation of existing industrial building, the installation of a fire escape door to East elevation (rear), alterations to the West (front) elevation, as previously approved under planning reference SD08A/0719 and associated site works at Units A1/A2 South City Business Park, Tallaght, D24HT95.
Single storey extension to front and all associated site works.
Construct a single storey extension to the rear of the existing warehouse unit including alterations to the existing to accommodate same; All ancillary site works and services.
Construct a single storey extension to the rear of the existing warehouse unit, including alterations to the existing to accommodate same, all ancillary site works and services.
Partial change of use from warehouse/storage to office use on ground and first floor level consisting of offices, canteen and toilet facilities, internal staircases, and associated facilities; 1 dock leveller located on the south west elevation to existing loading bay; new external windows & doors for office spaces to the existing south east south west and north west elevations with formation of entrance to office space to existing south east elevation; new carparking/hardstanding to provide 27 car parking spaces inclusive of 2 disabled spaces; external ramped/stepped to approach to office entrance to south west elevation; alterations to existing perimeters gabion walls to the south west of existing site and realignment of kerbing and shrub line to south west elevation; car parking external LED lighting provided by way of lamp standards to car park; alterations to existing surface water drainage and associated site works.
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.
Installation of a 7.5m x 8.65m retractable canopy/awning, glazed partitions and planters for a 65sq.m sheltered outdoor seating area to the front of existing commercial unit.
Development of a welfare facility to accommodate a future bus layover which was approved as part of the D24 Neighbourhood Cycle Network Scheme. The proposed development consists of a bus driver welfare facility comprising of two toilet units circa 6 m2 each, hard standing area, and associated infrastructure. The proposed development is approximately 0.05 hectares (ha) in size.
Opening ceremony of the Ireland Games comprising of a procession, ceremony, speeches and entertainment. Audient will include family members, supporters, sponsors and guests of Special Olympics Ireland.
Development on a site of c7.29 ha located on lands east of Barney's Lane, Brownsbarn, Baldonnell, Co. Dublin. The proposed development is comprised of change of use of the lands from vehicle distribution centre car park to a logistics warehouse campus. The proposed development includes 4 no. new logistics / warehouse units as follows; 1. Unit 1 - GFA c. 5,936 sq m (warehouse area c. 5,248 sq m, with c. 688 sq m ancillary office and staff facility spaces); 2. Unit 2 - GFA c. 3,632 sqm (warehouse area c. 3181 sq m, with c. 451 sq m ancillary office and staff facility spaces); 3. Unit 3 - GFA c. 6,389 sqm (warehouse area c. 5658 sq m, with c. 730 sq m ancillary office and staff facility spaces); 4. Unit 4 - GFA c. 4,089 sqm (warehouse area c. 3,591 sq m, with c. 498 sq m ancillary office and staff facility spaces); Access to the site will be provided via a new vehicular, pedestrian and cycle entrance via the roundabout at Brownsbarn Drive, to the south of the site, with associated modifications proposed to the roundabout to facilitate access. Each proposed block includes associated set down, turning areas, loading docks, delivery and marshalling yards; 164 no. car, and 106 no. cycle parking spaces; plant and tank areas. The development also includes all internal roads, cyclepaths and footpaths, all site development works and changes in level; site clearance works including the partial removal of hedgerows; hard and soft landscaping; signage; boundary treatments, ducting, cabling and pipework; public and security lighting; CCTV; 2 no. ESB Substations; SUDs including provision of pons; PV Panels; and all other ancillary works.
Construct agricultural shed incorporating loose and storage areas; wall manure area; hardcore area and access roadway; upgrading existing entrance and all associated site works.
Permission to permanently retain the change of use from Civic Offices to medical centre on foot of now expired, 10 year temporary permission (SD08/0594). Proposed uses include public attendance for consultation, treatment and general healthcare provision on all levels from lower ground floor to fourth floor, including retention of existing signage and roof top plant.
Residential development consisting of 16 two storey houses comprised of 1 four bed detached house; 6 three bed semi-detached houses & 9 two and three bed terraced houses; access to the proposed development will be via a new vehicular access road located off the existing Elder Heath Drive to the south of the subject site; including all associated development works, internal roads, drainage, landscaping etc; all on a site of circa 0.81 hectares located at Killinarden Heights and when finished will form part of the existing Elder Heath estate., The proposed development will have the effect of modifying part of previously permitted residential development as granted under Reg. Ref. SD12A/0168 and extended under Reg. Ref. SD12A/0168/EP.
Retention for internal mezzanine storage area (132sq.m); single storey compressor room extension (12sq.m) to rear of existing building and single storey packaging shed extension (38sq.m) to side of existing building.
Retention Permission for timber cabin used as art studio with sessional art classes to rear of existing house
Demolition of 29.5m2 loading bay and removal of 3 no. storage containers and ancillary 5 no. storage tanks with extension of 394m2 9.0m high warehouse extension with 2 no. roller shutters with internal layout changes for installation of new energy efficient and sustainable equipment to existing commercial laundry with 7 no. new car parking spaces, 24 no. new bicycle spaces in secure standalone shelter with new delivery and loading area covered with new canopy and revised internal vehicular routes while retaining existing entrances to Second Avenue with ancillary site and development works.
Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
Retention of single storey kitchen extension to front side and rear of existing house and all associated site works.
Refurbishment of residential structure in derelict condition; 2-storey extension to side; single storey extensions to side, rear and front; entry door canopy; access gates and pillars; all related works and drainage; Retention is sought for a 46.7sq.m garage to side and front.
Single storey temporary emergency accommodation structure for working staff, for a maximum period of 2 years, comprising 16 sleep pods, a kitchen/dining area, cleaning and changing rooms and toilet facilities, all associated windows and doors and associated site development works.
The amendments to the permitted development will consist of: 1. Reduction in the overall height and internal and external re-configuration of permitted development resulting in the omission of 1 no. floor in Block A and C, and 2 no. floors of Block B to comply with Condition 2 of the permitted development. This will result in an overall reduction in units in the permitted development by 55 no. units from 252 no. units to 197 no. units; 2. Omission of 41 no. studio apartments which will be replaced with 15 no. 1-beds, 13 no. 2-beds and 2 no. 3-bed units including any associated elevational changes to balconies and window openings; 3. Revised layout at ground floor to remove podium courtyard, parking and service area which will be replaced with a new underground car park, entrance and service area; 4. Relocation of permitted creche to the ground floor corner of Blocks B and C and inclusion of an associated outdoor play area resulting in the omission of apartment no. 40 and relocation of tenant amenities/ community space to Block A to comply with Condition 2 of the permitted development; 5. Inclusion of plant equipment at roof level; and, 6. Inclusion of a blue roof drainage system at roof level of all permitted apartment blocks. 7. The development also includes all site development works necessary above and below ground necessary to facilitate the development.
Full planning permission for the following: (a) replacement of existing roof including raising ridge height over existing single storey detached dwelling house, (b) new single storey extension to side / rear of said existing dwelling house, (c) decommissioning and backfilling of existing sewage treatment system and replacement of same with a new on-site domestic wastewater treatment system, (d) modifications to existing window openings along front elevation, (e) internal modifications, connection to all other existing on-site services, landscaping and all associated development works at Sycamore Cottage, Blessington Road, Boherboy, Saggart, Co. Dublin. Eircode D24 XY46
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
Retention for 3 no. roof lights (2 facing east a 1 facing south). A detached garden room of 16sq.m floor area. Permission for a rear, ground floor extension of 22sq.m floor area with a stove flue. A gable window facing south at attic level.
The development will consist of the provision of a new glazed entrance lobby (24sqm) at the existing west entrance to the Square Shopping Centre (Level 3) and all associated site and development works.
Subdivision of a two storey apartment across second and third floors (170.12sq.m) into two separate apartments each with own door access to be known as 311 Swiftwood (second floor - 84.65sq.m) and 411 Swiftwood (third floor - 85.47sq.m).
Change of use from existing short term tourist accommodation units to full apartment type living accommodation units consisting of 10 two bed ground floor units and 10 two bed duplex type units at first floor level (20 units in total); also, include small elevational changes to facilitate balcony extensions at first floor level and new balcony areas at ground floor level in order to accommodate private amenity space for the individual units; omit Planning Condition 6 of Planning Ref. S01A/0051 (which links the use of units to the City West Hotel); new bicycle shelter and all associated site development works, parking, landscaping and boundary treatment works.
Cairn Homes Properties Limited intends to apply for planning permission for a Large-Scale Residential Development (LRD) comprising amendments to a previously permitted Strategic Housing Development (SHD) (An Coimisiún Pleanála Reg. Ref. ABP-308088-20), as amended by SDCC Reg. Ref. SD22A/0357, at Garters Lane, Saggart, Co. Dublin. The development will comprise the provision of a new single storey ESB substation with associated switch room (21.5 sq m total with maximum height of c. 3.4m to the top of the parapet) to the north east of permitted Block B, associated minor revisions to soft landscaping and all associated site development and excavation works above and below ground.
224 apartment units arranged in 4 blocks and all associated public open spaces, communal amenity spaces and private amenity spaces comprising terraces/balconies. The proposed blocks are arranged over 2 single level basements (accessed via 2 vehicular ramps to east of the site) and comprise 5 to 6 storey blocks with an 8 storey element as part of Block A. Vehicular access to serve the proposed development will be provided via a new access at Garters Lane and will also provide access to lands to the east (development permitted under ABP ref PL06S.305563). Permission is also sought for 191 car parking spaces (180 at basement level and 11 at surface level); 470 bicycle parking spaces (290 at basement level at 180 at surface level); 1 ESB substation; 1 cycle store, hard and soft landscaping, pedestrian and cycle links, boundary treatments, public lighting, bin storage areas at basement, surface water drainage infrastructure and attenuation tanks, and all associated site development and infrastructure works.
224 apartment units arranged in 4 blocks and all associated public open spaces, communal amenity spaces and private amenity spaces comprising terraces/balconies. The proposed blocks are arranged over 2 single level basements (accessed via 2 vehicular ramps to east of the site) and comprise 5 to 6 storey blocks with an 8 storey element as part of Block A. Vehicular access to serve the proposed development will be provided via a new access at Garters Lane and will also provide access to lands to the east (development permitted under ABP ref PL06S.305563). Permission is also sought for 191 car parking spaces (180 at basement level and 11 at surface level); 470 bicycle parking spaces (290 at basement level at 180 at surface level); 1 ESB substation; 1 cycle store, hard and soft landscaping, pedestrian and cycle links, boundary treatments, public lighting, bin storage areas at basement, surface water drainage infrastructure and attenuation tanks, and all associated site development and infrastructure works.
The proposed development comprises amendments to a Strategic Housing Development scheme permitted under ABP Ref. ABP-308088-20. consisting of modifications to the previously permitted development (ABP Ref. ABP- 308088-20), comprising: replacement of 2 one bedroom unit with 1 two bedroom unit and an entrance lobby / concierge at ground floor level within permitted Block C; replacement of 3 three bedroom units with 3 two bedroom units and additional residential amenity spaces at first, third and fifth floor levels within permitted Block C; replacement of 2 two bedroom units with 2 one bedroom units and additional residential amenity spaces at ground and third floor levels within permitted Block D; and the provision of an enlarged stretcher lift through all floor levels of permitted Blocks C and D. The total number of residential units proposed will decrease from 224 to 223 as a result of the proposed amendments; The proposed development will also consist of: amendments to the permitted car parking areas at basement levels resulting in a total loss of 29 car parking spaces (151 car parking spaces are provided in total at basement level); the provision of c. 275sq.m of residential amenity space (incl. reception, office, staff amenities, multi-purpose spaces, meeting rooms and lobbies) at basement level of permitted Block C and D; minor elevation amendments to permitted Block D; the provision of a new external stair well to the eastern elevation of permitted Block D providing access from the ground floor level to the basement level; reduction of the roofed area above the basement ramp of permitted Block A and B; the provision of sprinkler tank rooms, landlord plants, comms room and attenuation tanks at basement level of permitted Blocks A, B, C and D; the provision of PV solar panel at all roof levels; amendments to hard and soft landscaping areas; and all associated site excavation and development works above and below ground.
Installation of roof-mounted solar photovoltaic panels on the roofs of two existing buildings including all ancillary works and services.
Extension to existing garden room with the re configuration of roof and all associated site works.
3 signs (1m metre high x 4.5 metres wide aluminium back panels with individual raised illuminated lettering) on the existing tower feature on the western elevation of The Square; 1 sign (1.2m meter high x 6.1 metres wide aluminium back panel with individual raised illuminated lettering) positioned externally on the southern elevation of The Square (south eastern corner).
Retention of an inclusion of 1 no. Velux window to the front and 2 no. Velux windows to the rear of the roof of the existing house, a conversion of the attic into storage space, and construction of a single-storey building in the rear garden for use as a home office/playroom and storage, together with all associated site works.
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
Subdivision of the existing retail department store (Unit 116 - 5,396sq.m. - formerly Debenhams) to comprise 2 retail units - 116A (2,431sq.m) and 116B (2,270sq.m) and new service corridor (176sq.m) to the rear of the proposed unit 116B to provide access to the existing service yard; associated modifications including the removal of the existing mezzanine floor within Unit 116 (497sq.m); creation of new retail frontage within the internal mall and associated signage; revisions to existing retail Unit 117 (113sq.m) and 118 (102sq.m) to form a single amalgamated unit (169sq.m) and creation of additional mall floor space (47sq.m) arising from the unit reconfiguration; all associated site and development works including minor revisions to the layout of the existing service yard.
Retention permission for hard stand area and for permission to complete works, incorporating the setting out of lorry trailer park, drainage network, attenuation tank together with Asphalt Concrete finish, and all associated site works.
Revisions to previously permitted internal modifications as approved under Ref. SD18A/0399 resulting in the reductions in the kiosk zone at Level 2 only by 196sq.m (from 1073sq.m to 877sq.m) to accommodate a new partially enclosed restaurant/café unit (196sq.m) and associated setting; the new restaurant and seating area will correspond with the footprint of the existing Units 260/262 and 263 and will contain associated facilities including a kitchen, front and rear counters, condiment unit, dining tables, chairs, booths and benches; associated signage and development works.
The development will consist of internal reconfiguration and amalgamation of 4no. existing Level 2 retail units (U238, U239, U240 and U241) to provide two retail units (U238: 516sqm and U240: 1282sqm) and ancillary circulation and general store rooms (c.274sqm) resulting in no overall increase in gross floorspace. Permission is also sought for all associated site and development works and reuse of existing signage zones.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
The installation of 6 no. 6m high floodlights around the existing pitch and associated site works and the retention of the existing pitch boundary treatment comprising 2.4m high painted metal mesh fence with access gates with 3m high netting above.
Mixed use commercial extension (9,956sq.m gross floor space) to the southern side of The Square Shopping Centre and a new public plaza and all associated site and development works including new signage; Level 1 - no changes; Level 2 - removal of southern mall entrance lobby and construction of new extension to existing Level 2 mall to include 6 retail units (2,611sq.m), a food hall/market hall area for multiple restaurant/food and beverage type uses with associated seating areas (2,041sq.m), a restaurant/cafe unit (67sq.m) and associated ancillary accommodation and circulation (1,534sq.m) and plant rooms (176sq.m) and introduction of new internal service corridor; Level 2 extension is replacing surface parking spaces (140) to the south of the shopping centre and an existing parking area (34 spaces) to the east of the proposed extension is to be reconfigured; creation of Level 3 entrance and creation of new public plaza to replace roof car park (111 spaces) and the new outdoor public plaza (0.74ha) will be used for multi-purpose events, civic and recreational uses and retail and food and beverage concessions involving temporary moveable structures erected on a seasonal basis; the creation of the new Level 3 entrance involves replacement of existing retail unit at Level 3 (Unit 307A) with mall area to include flexible kiosk type retail concession areas; 2 buildings accommodating 9 restaurant/bar units (3,324sq.m) and ancillary accommodation (175sq.m) and associated outdoor seating areas in the new plaza on south facing terraces; Level 4 - ancillary accommodation and service areas (28sq.m) on roof of 2 restaurants buildings within provision for screened plant areas and solar panels; the proposed extension has a maximum building height of 18 metres above existing ground levels; the extension is to replace and supersede the Plot B development previously permitted under Reg. Ref. SD13A/0192 (Bod Ref. PL06S.243280) which included a gross floor space of 5,684sq.m; the permitted northern extension (Plot A) remains unchanged. Permission is sought to amend Condition 3(a) of the Reg. Ref. SD13A/0132 (Bord Ref. PL06S.243280) to facilitate the construction of the proposed southern extension prior to the permitted northern extension (Plot A) subject to a phasing programme to be agreed.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Conversion of attic to domestic store; 3 rooflights; window to front elevation and all associated site works.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.