Change of use of two community hall meeting rooms - to be used as Montessori classrooms with separate access and the use of kitchen, storage and WC facilities for the same.
Removal of an existing totem signage pole and installation of a new three-sided, 3.34 metre tall, partially internally illuminated totem sign. Five non-illuminated new fascia signs on the south elevation of Unit 10 and all associated works.
Change of use of land and building to allow for the storage (internal and external), distribution and direct trade/retail sale of gas and gear products; customer engineering services workshop; new roller shutter on rear elevation; new window and door security shutters; new vehicle gates; new security screens along existing southern boundary fencing; new 63sq.m single storey external storage container; external open storage areas; vehicular parking and all associated works.
The development shall consist of retention of Collect and Go Coffee Dock, together with associated services and signage.
Retention permission sought for 4 external signs at HSE Primary Healthcare Centre; sign 1 located on right hand side of main entrance pillar from Ninth Lock Road (0.348sq.m); sign 2 located at the left hand side of south-west facade at under-croft archway (1.32sq.m); sign 3 located on the right hand side of the south-west facade at under-croft archway (2.4sq.m); sign 4 located on north-east facade on right hand side of the building (1.109sq.m); total area (5.1773sq.m).
Installation of telecommunications equipment including a pole mounted tri-sector antenna and dish, remote radio units (RRU's), GPS, latchways system, cabinet, steelwork and all associated site development works on the rooftop; The development will provide for high speed wireless data and broadband services.
Construction of a single storey extension with 2 roof lights to rear; conversion of existing garage; two storey extension to the front and first floor extension to the side over garage; external insulation to all external walls; new canopy and bay window to front elevation; conversion of existing attic; new dormer window and 2 roof lights to the rear; modification of existing windows and doors to existing two storey semi-detached house and all associated site works.
(i) provision of a single-story extension (2.4m x 8.92m) to the front of the structure; (ii) internal works as follows: (a) plastering of internal walls with insulated lime plaster, (b) build-up of existing front window opes internally only on 1st floor level (maintaining window slats), and (c) internal layout revisions including the omission of existing partition walls/doors and provision of new partition walls at ground and first floor levels; (iii) restoration of roof slates with replacement where required. (iv) change of use of the structure from an ancillary storage building to guesthouse use to provide for 2 no. additional guesthouse suites, each inclusive of 1 no. bedroom, 1 no. living area and 1 no. bathroom; (v) The development includes all ancillary site works, inclusive of landscaping, tree-removal and drainage, necessary to facilitate the development. The proposed guesthouse will form part of the existing guesthouse use within Towerville and will result in a total of 9 no. guesthouse bedrooms provided on site. The subject building is within the curtilage of Towerville, a protected structure.
Permission to (a) construct extension to front of existing building & (b) convert existing Laundry room to bedroom with en-suite associated with Guest House / B&B.
(i) a change of use from existing residential dwelling to guest house, (H) the provision of 1 no. accessible bathroom at ground floor level, (Hi) changes to the external elevations inclusive of the widening and lowering of existing door ope to 0.8m on the south elevation, widening of gate into courtyard to (from O.8m to 1m wide) and subdivision of an existing window opening on the north elevation of the building, (iv) internal layout revisions including the omission of existing partition walls/doors at ground and first floor levels and provision of new partition walls to facilitate new internal layouts, and (v) provision of 1 no. accessible car parking bay. The development includes all ancillary site works, inclusive of boundary treatments, landscaping and SuDS drainage, necessary to facilitate the development, at Towerville, Tower Road, Dublin 22, D22 XTS1 (a protected structure: RPS Ref: 419).
To construct a new industrial building (412 msq) for maintenance of plant and machinery, with incorporated staff facilities, offices, meeting rooms and reception area along with a new connection to public sewers along with all associated services
Development of a ground floor extension (approx. 104 sqm GFA and 4.4m in height) and all other associated site development works above and below ground.
Alterations to planning Reg. SD20B/0073 consisting of construction of a first floor extension to the side of existing dwelling and attic conversion to include 2 dormer windows to rear of dwelling.
Construction of a 3.5sq.m single storey extension to front; 14.8sq.m single storey extension to rear of existing dwelling; change of use of 11.7sq.m garage to study.
Permission and retention permission is sought for the following development: Permission for an ancillary generator structure with a total height of c. 22m located between ICT Facility 2 and ICT Facility 3 including 13 no. double-stacked back-up generators with flues of c. 25m, fuel storage, transformers, and associated electrical equipment and plant. Permission for 13 no. ancillary generators within a fenced compound, with a total height of c. 8.1m located to the north of ICT Facility 3, including 13 no. back-up generators with flues of c. 25m, fuel storage tanks and fuel pump room building, transformers, and associated electrical equipment and plant. The primary fuel for the proposed back-up generators will be Hydrogenated Vegetable Oil (HVO). Permission for associated works including services connections, boundary treatments, lighting, and all ancillary works. Permission for reconfiguration of car parking spaces and the retention of 10 no. car parking spaces to the west of ICT Facility 3, resulting in an overall reduction of 8 no. car parking spaces. Retention permission for 4 no. existing water tanks with a total height of c.9.2m and an existing water processing building with a total height of c. 5.1m, located between ICT Facility 2 and ICT Facility 3. Retention permission for 1 no. sprinkler tank with an overall height of c. 8.1m and a single storey pump room with a total height of c. 3.2m to the north of ICT Facility 3. An EPA-Industrial Emissions Directive (IE) license is required to facilitate the operation of the proposed development.
Part demolition of the existing forecourt building (31.44 sq.m), the removal of the existing car wash, compound, storage shed, totem signs, one fuel pump island (resulting in 3 No. pump islands remaining), and associated reduction in size of canopy at Maxol Long Mile Road Junction, Naas Rd/Long Mile Road, Walkinstown, Dublin 12, 012 TDW3, and the demolition of existing building (180 sq.m) removal of portacabin (61 sq m) and the part removal of boundary treatments at Beechlawn Motors, The Huntsman Service Station, Naas Road, Dublin 12, 012 DC62 to incorporate it into the Maxol site consisting of construction of: 215 sq.m extension of the existing forecourt building resulting in a single storey forecourt building of 555 sq.m total gross floor area (comprising a retail unit (100 sq.m net area, including a 11 sq.m ancillary off licence), 3 No. restaurant/cafe areas (which will include the sale of hot and cold food for consumption on and off the premises) one of which will include a drive-thru facility, seating area, back of house areas and circulation spaces) with revised facades and screened roof plant; substation/ switch room (23.5 sq.m); car wash plant room (7.5 sq.m); solid fuel store (8 sq.m); external compound; and an EV Charging Hub (consisting of 6EV charging spaces; a canopy; ancillary plant; substation (11 sq.m)) revisions to the overall site layout (including the provision of 30 No. car parking spaces (separate to the EV Hub spaces); motorbike and bicycle parking spaces; alterations to vehicular circulation (including amendment of existing vehicular access point at the Beechlawn Motors site to provide entry only, and provision of a drive thru lane); new car wash facility, offset fills and vents; and alterations to external lighting); changes to levels; hard and soft landscaping, including revised boundary treatments; associated site servicing (water supply, foul and surface water drainage including surface water attenuation measures); all other associated site development works above and below ground. The development will also consist of 35 No. signs: 2 No. replacement 7m high double sided internally illuminated totem signs; 1 No.4.8m high double sided internally illuminated totem sign associated with the EV Hub; 11 No. attached to the forecourt building (7 No. of which are illuminated); 9 No. free- standing signs (4 No. of which are illuminated); 12 No. attached to other structures. The development will also consist of: a temporary structure (72 sq.m) to accommodate a shop (net retail area 36 sq.m), storage, ancillary support facilities; and the temporary siting of the proposed solid fuel store (8 sq.m) during the construction phase.
Retention permission is sought for an external, timber framed, flat roof, covered seating area (15.8m²) to the rear garden at side.
Change of use of the first floor from offices in No. 43 and restaurant in No. 44 to 3 two bedroom apartments and 1 one bedroom apartment and an interconnecting doorway between the two existing ground floor shop at No. 43 and the takeaway food shop at No. 44 Tower Road; new stone-clad shopfront with an aluminium glazing system and signage in the fascia over each unit.
Erection of a marquee type structure with a floor area of 618sq.m as an extension to the side and rear of existing warehouse buildings.
Demolition of attached garage and construction of a new one and a half storey dwelling; connection to main sewer and connection to all associated services.
Permission is being sought for works comprising the removal and replacement of two existing underground fuel storage tanks with a new 40,000 litre underground fuel storage tank, the decommissioning of a separate existing 70,000 litre underground fuel storage tank, the installation of a new 11,000 litre Class 1 forecourt separator with coalescing filter; along with all other associated site development, enabling and drainage works; Permission is also sought to retain the existing 24-hour fuel retail card facility and associated overground Adblue fuel tank.
Change of use of portion of the ground floor (29.48 sq m) from office to residential accommodation and retention permission for the incorporation of the internal courtyard (7.16 Sq m) as part of the residential accommodation.
(i) A change of use from existing residential dwelling to guest house, and (ii) the provision of 1 no. accessible bathroom at ground floor level. The development includes drainage, landscaping, boundary treatments and all ancillary works needed to facilitate the development.
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (4.5m x 1.5m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.1m x 1.4m) is a high level sign to replace existing on the southern elevation. Sign No.3 (4.5m x 1.5m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (6.1m x 2.1m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.6m x 2.1m) is a high level sign to replace existing on the southern elevation. Sign No.3 (5.3m x 2.2m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
The development will consist of 1) a side garage conversion and second storey side extension, 2) a single storey lean to extension to the rear, 3) the widening of the vehicular front entrance, 4) a front porch extension 5) a roof light on the south facing hipped roof and 6) all site ancillary works.
Retention of detached shed/sensory room/study to rear garden
The refurbishment of Katherine Tynan House, or ‘Whitehall’, a Protected Structure (RPS ref.197), with change of use from disused dwelling to community centre. Works will entail refurbishment of the roof and external walls; reinstatement of windows and external doors; ceilings and floors; reinstatement of a conservatory and glazed porch (10sq.m and 5sq.m respectively); new internal stairs and doors; new services and sanitary accommodation; two new single storey open-fronted structures on part of the footprint earlier outbuildings with an enclosed area for toilets (534sq.m); refurbishment of historic garden walls and gates; upgrading of the existing non historic entrance and approach from the Ballymount Road; and provision for parking on site.
1) The erection of a 2.3m high black palisade fence to the north, east and part of the west boundaries 2) Remove the foyer and rebuild a new one: a sloping roof with a height not exceeding 3380mm, a width of 3680mm, and a depth of 2630mm 3) Within the company courtyard, approximately 700 square meters of asphalt pavement is laid around the main building 4) Erecting company signage on the main building overall size 0.9m x 18.75m 5) Add 19 No. street lights within the company forecourt 6) Install two electric gates 7) Add metal lines above the roof of the main building 8) Repainting exterior wall paint 9) Replace all doors and windows of the main building, the outer frame color of doors and windows is gun grey 10) On the southeast side of the main building, establish a 4700mm wide and 3100mm high billboard.
Removal of existing front boundary wall and replace with new selected stone boundary wall with new extended front vehicular access opening and widen existing front driveway.
Demolition of the existing warehouse and ancillary office space (c. 459sq.m) and 2 curtain sided storage racks (c. 46sq.m) and the provision of a new warehouse with ancillary office space (c. 746sq.m) and associated development; The proposed warehouse will have a maximum height of c. 11.15 metres; Minor repositioning of an internal gate; The rearrangement of the car parking spaces comprising a reduction from 10 to 7 car parking spaces (including the provision of an accessible parking space); Bicycle parking; The provision of a sectional door on the north-east elevation; External signage; Rooflights; Lighting; Boundary treatments and all associated site development works above and below ground.
Planning permission is sought for the following alterations: • Internal alterations at the ground floor level of the permitted warehouse/logistics unit, including a change of use of 310 sq.m, to provide additional ancillary staff welfare facilities and ancillary office accommodation; • Provision of an additional 158 sq.m at first floor level for ancillary office accommodation; • Amendments to façade treatment including signage and louvres; • Repositioning of the roof mounted Solar PVs; • Other associated alterations including to the landscaped areas; and • All associated development works Retention permission is sought for the following: • Reconfiguration of car parking layout, including amendments to circulation arrangements adjacent to the building entrance. No change is proposed to the overall number of car parking spaces; • Repositioning of the bicycle shelters; • Amendments to façade treatment, including: o Reconfiguration of glazing mullion centres and incorporation of additional opening sections; o Provision of a first-floor opening vent window to Staircore 2; o Minor adjustments to the cladding arrangement at parapet level; • Repositioning of the roof mounted AOVs; and • All associated site development works. The proposed alterations result in an overall increase of 158 sq.m in the total GFA of the warehouse/logistics unit from 3,026 sq.m to 3,184 sq.m (including ancillary office and staff welfare facilities).
Conversion and extension of the existing garage structure and construction of a new link to the existing single-storey four-bedroom house, to provide a single-storey one-bedroom family flat with kitchen/ living area and outdoor area; construct an additional pedestrian gate in the existing garden wall, to install photovoltaic solar panels to the roof of the house and to complete some ancillary site, landscaping, and drainage works.
New rear dormer structure at attic level and conversion of the attic space to habitable space with ensuite
Change of use from warehouse to self-storage use; • The demolition of the existing mezzanine floor (c. 53 sqm); • The construction of an additional floor measuring 797 sqm at 1st floor level, increasing the total gross floor area from 874.7 sqm to 1,618 sqm; • Associated site signage measuring at 9 sqm; • Minor internal and external alterations to facilitate the change of use from warehouse to self-storage use; • All associated site development works including cycle parking provision
Sud-division of unit previously granted planning permission under planning Ref. SD16A/0065 into two separate units; minor internal alterations to layout of the previous grant.
Replace existing 18 metre telecommunications support structure (monopole design) previously granted under planning Ref. SD18A/0418 with a new 24 metre high structure (lattice structure design) carrying telecommunications equipment and ground level equipment cabin and fencing.
Planning permission sought for to remove the existing garage to the side of the existing dwelling & replace with a new extended ground floor extension with a new first floor extension over with tiled roofs over to match existing to the side of the existing dwelling; internal alterations to include new attic conversion and associate site works.
Erect 293sq.m of photovoltaic panels on the roof of existing unit with all associated site works.
(1) The demolition of the existing shed/garage building to the rear of the existing dwelling; (2) the construction of 1 2-bedroom, 3 person detached single storey pitched roof mews dwelling with attic conversion, and a single storey flat roof rear projection located to the rear of the existing dwelling and fronting Brideswell Lane; (3) the vehicular entrance is off Brideswell Lane; (4) connection to all public services; (5) all necessary ancillary site development works to facilitate this development.
Alterations to existing boundary wall/railings; proposals to construct a new pedestrian entrance gate and new concrete path to existing bank with all associated site works.
RETENTION: Retention of the existing office space at second floor level resulting in an overall office floorspace increase of 125 sqm approximately, Creation of 2no. openings to the south elevation and associated site development works.
PERMISSION & RETENTION: The development will consist of extension of the existing office space at second floor level resulting in an overall office floorspace increase of 125 sqm approximately, construction of a new mezzanine level in the warehouse area (circa 257 sqm) and a new stairwell. Creation of 2no. openings to the south elevation and 1no. opening to the west elevation and associated site development works. The development will also include the retention of the existing office space at ground and first floor level of 250 sqm approximately.
Demolish an existing single storey glazed conservatory to the rear. Erection of a new single storey flat roof extension to the rear. Erection of a new single storey porch structure and flat roof canopy to the front. Widening of existing vehicular entrance and all associated alterations & site works to the existing two storey house.
Conversion of an existing single storey structure into a two bed mews dwelling with one reception room; kitchen/dining area; bathroom; rear garden with all associated site works; existing structure will be given a new pitched roof; parking will utilise the existing three spaces off Brideswell Lane.
Planning Permission for (1) The demolition of the existing garage building to the rear of the existing dwelling (2) The construction of 1no. 2 bedroom 3 person detached single storey pitched roof mews dwelling with a single storey flat roof rear projection located to the rear of the existing dwelling and fronting onto Brideswell Lane (3) The vehicular entrance is off Brideswell Lane (4) Connection to all public services and all necessary ancillary site development works to facilitate this development at the rear of 101 Boot Road, Clondalkin, Dublin 22, D22 V3Y6.04
(1) The demolition of the existing shed/garage building to the rear of the existing dwelling; (2) the construction of 2 2-bedroom, 3 person detached two storey pitched roof mews dwellings with a single storey flat roof rear projection, located to the rear of the existing dwelling and fronting onto Brideswell Lane (3) the vehicular entrance is off Brideswell Lane (4) connection to all public services, and (5) all necessary ancillary site development works to facilitate this development.
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.
Construction of new side dormer structure at attic level and conversion of the attic space to a bedroom and bathroom. The dormer structure allows for stair access and a functioning bedroom and bathroom with limited space available from the existing hipped roofed structure
Retention permission for the existing telecommunications compound, including enclosure and ground mounted equipment; Permission for the replacement of a 25m high lattice tower with a new monopole carrying antennae, dishes and associated equipment with ground works, including foundation (overall height of 20m, excluding lightning finial).