Planning records
Showing 301-350 of 28,302 public recordsAmendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
Part single storey, part two storey dormer extension of 170.43sq.m. to rear of an existing 49.57sq.m. house; a domestic garage, a wastewater treatment system and all ancillary works.
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.
Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Retain deviations to an approved two storey side extension under Reg. Ref. No. SD20B/0364 as follows: (i) repositioned/enlarged/additional windows to four facades of dwelling, (ii) provision of a non-habitable structural basement plant/storage room under extension, (iii) coloured nap plaster external first floor finish in lieu of steel cladding to dwelling, (iv) minor external alterations, (v) rainwater harvesting tanks and (vi) additional landscape planting and associated site development works.
Demolition of existing granny flat; construction of two storey extension to side of house and installation of new wastewater treatment system.
1) REMOVAL OF EXISTING TEMPORARY STRUCTURE (LOG CABIN) AND 2) CONSTRUCTION OF A NEW DETACHED DWELLING TO THE REAR OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS.
Construction of single storey extension to the side and rear of existing dwelling comprising of bedroom c/w en-suite, open plan kitchen, dining, living space and utility room. Internal modifications and all associated site works.
The Construction of 2 no. 6.50m wide X 3.0m high digital advertising panels (arranged in a V plan 6.50 meters from ground to top of structure) with a 250mm frame all around each
Demolition of an existing utility room to the west/rear and the construction of a new single storey flat roof extension to the west/rear of the property comprising of new dining and living spaces along with all associated ancillary drainage, landscaping and site works.
Demolition of existing single storey dwelling and the construction of 274 units on a 4.62 ha (net) site (density 60 units per hectare). It will comprise of 51 houses, 38 duplex units and 185 apartments. The height of the proposed scheme will range from two storey houses and three storey duplexes to 5 storey and part 8 storey apartment blocks. The proposed residential mix will comprise of: 17 2-bed houses, 27 3-bed houses and 7 4-bed houses, 2 1-bed duplex, 17 2-bed duplex and 19 3-bed duplex units, 62 1-bed apartments, 119 2-bed apartments and 4 3-bed apartments. A 4-classroom crèche of c. 276 sq.m and 2 substations are also included in the proposed development. 276 car parking spaces and 634 bicycle spaces are provided. A planted woodland berm will be developed along the northern boundary with the N7 to provide a sound barrier and amenity open space. There are a number of green spaces located in the centre of the site and on the south east and west of the site with natural play and SUDS elements as well as a large open communal space for the two apartment blocks to the south. Vehicle, pedestrian and cycle access to the site will be from the Mill Road. A new road will be constructed running east west at the southern boundary of the site. The residential element of the site will have two access points off the proposed new road. This new route will extend eastwards to provide cycling and pedestrian connections through neighbouring Citywest lands and to the Saggart LUAS light rail terminus. Secondary access is proposed at the north west of the site from an existing access road connecting to Mill Road. This access is designed as services and emergency only and will be controlled by collapsible bollards.
Retention for 12 metre high telecommunications support structure carrying telecommunications equipment together with existing equipment containers and associated equipment within a fenced compound as previously granted under SD10A/0180. The development will continue to form part of Eircom Limited's existing and future telecommunications and broadband network.
Conversion and modification of existing attached garage space comprising of 2no. bedrooms, bathroom and open plan kitchen and living area.
Extensions to the rear and side of the existing single storey bungalow house. The existing house consists of 3 bedrooms and measures 59.3sq.m.The proposed extended house will have 5 bedrooms and will measure 149.2sq.m. The application will include a new site entrance, storage area, a new septic tank, polishing filter and all new service connections ancillary to the development.
A new single storey three bedroom end of terrace house measuring 96.8m2; an extension of 15.5m2 to the rear of the existing terrace house adjacent to the proposed new house; the subdivision of the property into two separate residential sites; two new waste water treatment plants with soil polishing filters to the rear of both houses; a new vehicular entrance for the new house and all new service connections ancillary to the development.
2 halo illuminated signs to the southern and northern elevations of Unit D and all associated works.
Plant and associated development for the permitted and under construction Unit D (Reg. Ref. SD19A/0370, Reg. SD20A/0215 and Reg. SD20A/0319; works to include 4 air handling units, 2 climate control condensers, 1 transformer, 1 container pump house, 1 sprinkler tank and all associated works including the reduction in car parking by 3 spaces on a site located between the Casement Aerodrome and the N7 national route.
Planning permission is being sought by Peamount Healthcare CLG for part change of use from ancillary staff accommodation to laundry, and material alterations to include; (i) new door - front elevation (ii) new double doors - side elevation (iii) new double doors - rear elevation (iv) internal alterations and all associated site works at the Avenue Building, Peamount Hospital Campus, Newcastle, Country Dublin
Extension to the rear and side of the existing house to be refurbished including an undercroft lower floor level below the new extension providing access to the lower rear garden; works to the house will include replacing the existing entrance with a window, a new bay window to the side (southwest) elevation, new vehicle entrance gate, driveway and parking area to the west of the existing house, leading to a new glazed entrance and hall way to the side (existing garden and gates in front of the cottage to be retained); the rear extensions will provide new living/dining/kitchen facilities with the extended and refurbished cottage providing room four bedrooms; the undercroft level will provide a garden level play room as well as storage areas; works include for all services on and under land including a new effluent treatment system and new dry stone rubble boundary walls along the existing road.
Extend existing dwelling at the rear to include two dormer windows with all ancillary site works.
Permission for development on a site of 6.7ha. The proposed development will consist of the construction of a Photovoltaic Solar development to the North of the Citywest hotel on lands formally in use as a golf course [comprising a change of use from former golf course to solar development]. The proposed development will include the installation of solar photovoltaic (PV) panels on ground mounted frames/support structures, underground cabling and ducting, security fencing, CCTV cameras, temporary construction compound and an area of hardstanding for an electrical compound. The electrical compound will consist of two modified shipping containers, containing 3 inverters and LV Switch gear. This compound will also accommodate the Battery Energy Storage system, PV inverter and a transformer. The proposed development includes the above as well as drainage, landscaping, bio-diversity enhancement measures and all other associated site excavation, infrastructural and site development works above and below ground. While the proposed development relates to a total site area of 6.7ha, c.3.5ha of this constitutes the actual land take post development. The operational lifespan of the solar PV development will be 30 years. A Natura Impact statement (NIS) accompanies the planning application.
The demolition of existing rear bay window & rear roof over kitchen and construction of new ground floor single storey rear sun room & boot room extension, and new first floor rear extension over existing kitchen to inc. new master bedroom, new dressing rooms, ensuite, alterations to existing bedroom & all associated internal and external works
Change of use from aparthotel to restaurant, together with external signage and all associated site works.
Construction of a detached single storey split level bungalow; single storey domestic garage; upgrade of existing agricultural entrance to vehicular entrance; secondary effluent treatment system and all associated site works.
Construction of a detached, single storey split-level bungalow; single storey domestic garage; upgrade of existing agricultural entrance to vehicular entrance; secondary effluent treatment system and all associated site works.
The construction of a split level single storey dwelling (199 sq.m.) with a detached garage (40 sq.m.), an on-site proprietary waste water treatment plant and percolation area, modifications to existing agricultural entrance at the L2019 to access the proposed dwelling and all ancillary site development works
Relocation of the existing entrance door and provision of an open porch to the front elevation. Demolition of an existing single storey extension and construction of new single storey extension to the rear. Replacement of the existing septic tank with a new secondary waste water treatment system and soil polishing filter and all associated ancillary site development works above and below ground.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
The provision of an amended junction and new link road from the existing Clonlara Road to the currently undeveloped lands with Enterprise and Employment zoning objective South of the Camac River and Nort of the N7 National Route. Interim measures are included within the application to block access to the new road until such time as the undeveloped lands are developed. All associated landscaping, infrastructure and site development works to facilitate the development.
The development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: • Construction of a single storey main building (RNG Building - c.1,124.3 sq.m) with air handling units (AHUs). • External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. • MV substation & Stormwater attenuation pond. • 12 no. car parking spaces (2 of which are EV parking spaces and with 1 accessible parking space). Bike parking shelter and bin store. • New road access provided from adjoining permitted estate road (granted under SDCC Ref. SD24A/0107W) and including bridge over existing watercourse. • Internal road and footpath layout, perimeter fencing, security gates and retaining wall. • Landscaped and planted areas including riparian corridor and swale. • Temporary Construction compound and parking area (including temporary bridging of existing watercourse/field drain). • All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,384.2 sq.m
Demolition of existing single storey extensions to front & rear (60.15sq.m) & entire first floor (66.87sq.m). Construction of single storey pitched roof extension to front & flat roof extensions to rear & side (58.82sq.m), new first floor extension to include raising of perimeter walls by 1.45m, raising of ridge height to main roof to front by 0.515m to 7.375m above ground level, matching level of return roof to side, all to create new first floor area (181.46sq.m), complete with new former roof's and velux roof windows to front side & rear, selected stone cladding at ground level, together with internal alterations & renovations and all associated site works.
(i) construction of a detached, single-storey, split level, four-bedroom dwelling (261 sq.m), with on-curtilage car parking, private amenity space and associated wastewater treatment system, percolation area and surface water soakaway, (ii) 4.01m high, single storey stable structure (64 sq.m) with 4 no. stalls, (iii) Utilisation of the existing agricultural entrance to the south with alterations to increase visibility; and (iv) the development will also include all associated works including, landscaping, planting and boundary treatments, infrastructure, lighting, and all ancillary site works necessary to facilitate the development at Redgap Foliage Farm, Bolger's Lane, Hillsbrook, Co. Dublin
One/two storey dormer style four bedroom house; associated works and water treatment system.
The proposed development seeks to provide a temporary construction access road including entrance from Baldonnel Road to provide for the construction of a Regional Network Gateway (RNG) facility permitted under South Dublin County Council Reg. Ref. SD25A/0035W. The works will also involve the temporary provision of a security hut, security gate, vehicle set down area, associated fencing, lighting, civils, drainage, and landscaping works. The temporary works will be removed and lands reinstated to their former use when the construction of the RNG facility is complete.
Renovation of existing detached dwelling comprising of single storey peripheral extension. Removal of existing roof structure and remodel of internal layout, comprising of 2 no. bedrooms at first floor level and living room, office, WC and utility room at ground floor level. Construction of new one and two storey extension to the side of existing dwelling, comprising of 2 no bedrooms and en-suite at first floor and open plan kitchen, living and dining space and plant room at ground floor level. Upgrading of effluent treatment system and all associated ground works
Modify the previously granted planning permission (Ref. SD25A/0161W). The proposed modifications consist of the construction of a dormer attic extension by converting the as-granted attic space for habitation, comprising of 1 no. bedroom, 1 no. en-suite and 1 no. wardrobe to all the 3-no. as-granted. The development will include alterations to the rear elevation, provision of cladding finish to the dormer exterior, and internal alterations to the existing first floor to facilitate access to the attic level.
Emerald Irish Creative Ltd, intend to apply for Planning permission for the construction of 03 no. two-storey residential dwellings situated to the rear of the existing property at 13 Mill Road, Saggart, Dublin. The proposed development will consist of 01 no. detached three-bedroom house and 02 no. semi-detached three-bedroom houses with private rear garden and car parking spaces, removal of existing steel shed at the rear garden, widening of the existing vehicular entrance boundary wall with a new gate. All with associated site works, landscaping, and drainage connected to existing services.
The development consists / will consist of: (i) retention of partially constructed domestic workshop or garage building and permission for continuance of the construction of said building for the incidental enjoyment of the existing main house, (ii) permission for a 2 storey extension to the side and rear and remodelling of existing 2 storey house including change of external finishes and demolition of existing domestic garage, (iii) relocation of existing vehicular site entrance and provision of ramped driveway and revised front boundary treatments and (iv) all associated site works and ancillary services as relates to the above, including changes in ground levels and a new waste water treatment system and percolation area.
A new part single/part two-storey dwelling, with new vehicular access off Peamount Lane, a proprietary wastewater treatment system, and all associated site and infrastructural works.
Alterations to existing two storey detached house to include partial demolition works, new two storey front extension, new single storey rear extension, new chimney stack to rear and side, alterations to existing external window fenestration, energy update including full external insulation system, revised external elevations, increased ridge and chimney stack height to facilitate new slate pitched roof, internal modifications, additional habitable floor area, landscaping works, SuDS drainage and all associated ancillary works to facilitate the development.
Anthony Neville Homes Limited intends to apply for permission for development on lands located adjacent to Drury Mills and Drury Park, Swiftbrook, Saggart, Co. Dublin. The site is located within the curtilage of protected structures associated with the former Swiftbrook Mills (RPS refs. 314, 330 & 332) comprising chimney, storage building, millpond, tail-race, entrance gates and wall. The development will consist of a residential scheme of 73 no. units comprising a mix of 6 no. houses, 59 no. own-door duplexes and 8 no. apartments arranged in 4 blocks set around a central amenity space. The mix of units will consist of 5 no. 1-bedroom duplexes/apartments, 46 no. 2-bedroom duplexes/apartments, 16 no. 3-bedrooom duplexes and 6 no. 4-bedroom houses. The 4 no. blocks are labelled A to D on plans and consist of: Block A - a 3 to 4-storey terrace accommodating 18 no. duplex units with associated balconies & terraces; Block B - a 2-storey terrace accommodating 6 no. houses and 2 no. duplex units with associated gardens & terraces; Block C - a 3 to 4-storey terrace accommodating 27 no. duplex units with associated balconies & terraces; Block D - a 4-storey terrace accommodating 8 no. apartments and 12 no. duplex units with associated balconies & terraces. The development will include: New internal roads accessed from Drury Mills and Drury Park; 84 no. car parking spaces; Bicycle and bin stores and substation; Landscaped public and communal open spaces and boundary reatments; All associated site works and services.
Retention Permission to retain and complete modifications to the internal layout of the existing unoccupied ground floor creche to provide a new reduced sized creche with an outdoor play area and to retain and complete the change of use from permitted creche use to accommodate three number one bedroom, one number two bedroom and one number three bedroom ground floor residential apartment units and associated open space provision. Permission for modifications to the southern elevation to include replacement of existing door opening with an infill wall at ground floor and modifications to the eastern elevation to include a replacement of an existing window opening with new entrance doors all located withing curtilage of a Protected Structure being the existing Rag Store, entrance gates, Chimney, Tail Race, Mill Ponds of the Swiftbrook Mill now known as Mill Race Green on foot of previously approved by An Board Pleanála decision PL 06S.248162 all at Mill Race, Saggart, County Dublin.
Permission for modifications to the internal layout of the existing unoccupied ground floor creche to provide a new reduced sized creche with an outdoor play area and change of use from permitted creche use to residential use to accommodate three number one bedroom, one number two bedroom and one number three bedroom ground floor residential apartment units and associated open space provision, modifications to the southern elevation to include replacement of existing door opening with an infill wall at ground floor and modifications to the eastern elevation to include a replacement of an existing window opening with new entrance doors all located within the curtilage of a Protected Structure being the existing Rag Store, entrance gates, chimney, Tail Race, Mill Ponds of the Swiftbrook Mill now known as Mill Race Green on foot of An Board Pleanála decision PL 06S.248162
Development at this site on lands that include the Aylmer Road (L6003); Baldonnel Road (L2001); and lands that include a small section to the north, but are primarily to the south, of the Aylmer Road, including part of the Griffin allotments, within the townland of Kilmactawlay and Milltown, Newcastle, Co. Dublin consisting of the widening, to its south, of the existing Aylmer Road (L6003) from its junction with the Baldonnel Road (L2001) for a distance of c. 520m to the west. The widened road will tie in with the existing road to the west of a proposed new roundabout. The new roundabout will be created by utilising lands to the north and south of Aylmer Road to facilitate access to a new internal estate road (270m in length) to its south-east with a new roundabout at its end that will provide future access to the lands to its north and south. The widening of the Aylmer Road to a 7.5m wide carriageway will be almost entirely to its south and will include a proposed new shared cycle path and pedestrian footpath along its southern side, with the existing hedgerow to be retained for large lengths, and a new hedgerow to be planted where the existing one is to be removed. The proposed new shared cycle and footpath will tie in with a proposed new footpath and cycle path that will be located either side of the new internal estate road. These works will include the provision of 2 new dry attenuation basins on the south side of the widened road. The development will include all ancillary infrastructural works, street lighting, site development and ground works, including fencing, signage, and landscaping.
Minor alterations to existing elevations and internal layout; demolition of an existing single storey living room extension & storage shed both to rear of dwelling and replacement with new single two storey extension to rear and side of existing dwelling; all associated windows, roof lights, landscaping, SUDS, site and ground works necessary to facilitate development.
Demolition of existing single storey living room extension and storage shed both to rear of dwelling and replacement with new single/two storey extension to rear and side of dwelling; reconfiguration of internal layouts of ground floor of existing house including raising first floor level and existing ridge level of roof; addition of bedroom dormer windows and feature entrance to front of dwelling including al associated windows, roof lights, landscaping, SUDS, site and ground works necessary to facilitate development.