For modifications to the dwelling and site granted permission under Reg Ref 20/746. For (1.) A reduction to the overall subject site area.(2) A revised location for the approved dwelling site layout/entrance driveway. (3). A revised location packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards (4.) A revised location for a proposed groundwater well and all together with required site and development works
3 detached dormer bungalows with connection to public services and all ancillary site development works
An extension to side of existing community building, the new extension is to be used as a storage area and associate works
Outline Reg Ref 23/444. The development will consist of a dwelling circa 191msq, a domestic garage, packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards, a groundwater well, together with all required site and development works
Erect a first floor dormer extension with alterations and revisions to the elevations of the existing dwelling along with all associated site development works
4 no. Glamping Lodges, provision of 4no. carparking spaces, upgrading of existing effluent treatment system to comply with current EPA guidelines, provision of additional passing points along access laneway and associated works
New dwelling house & driveway, a packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards & a groundwater well together with required site and development works
Proposed new dwelling, upgrade to existing entrance, bored well, effluent disposal systems to EPA Cop 2009 standards and all associated site works
Construction of a slatted cattle house/store, cattle handling facilities, farm roadway and farmyard entrance, together with associated concrete yards and site works
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Sunroom to the side of existing dwelling and PERMISSION to remove the entire pitched roof and demolish 111 sqm of the existing dwelling, erect a 272 sqm two storey extension to the first floor and sides of the retained 77 sqm structure with alterations and revisions to the elevations and internal layout along with an additional 32 sqm garage / store linking to the existing garage and all associated site development works
Rear/side extension to existing main cottage. Permission for new extension to the rear of main cottage, which will create a link connection, to existing outhouse buildings, conversion of existing outhouse building to home office/workshop and conversion of existing outhouse building to self-contained apartment/granny flat, with double bathroom extension to the rear-south elevation, one for the studio, one for self-contained apartment/granny flat. Associated site works and some internal alterations
For retention permission existing agriculture lane as constructed, upgraded works to existing agriculture entrance and permission for new agriculture shed, agriculture yard, upgrading existing agricultural entrance on to public road, turning a section of gravel driveway back into grassland and associate works
Demolition of existing cottage and reconstruction of the replacement cottage on the same footprint as existing cottage with traditional finishes as per existing cottage, new waste water treatment system to EPA standards and associated works
Construction of an extension to side and rear of existing garage, creation of a granny flat in part of extension to garage and part of existing garage, creation of boiler room in part of rear extension to garage, removal of 2 containers, new outdoor patio area, new covered canopy area to rear of dwelling, converting rear window in existing dwelling to door and associate works
Dwelling, wastewater treatment system to EPA standards, entrance incorporating revision to existing entrance and associated works
1. Construction of a single storey dwelling with new vehicular entrance, driveway, well and effluent treatment system to EPA and all associated site works. 2. Block up the existing agricultural entrance. 3. To decommission the existing septic tank belonging to existing house and replace with new treatment system and all ancillary site works
Erect a dwelling and garage with services along with all associated site development works
A 36m² garage to the lower ground level of the north east elevation & Permission to erect a 16m² extension to the south east elevation and a 42m² extension to the north east elevation with alterations and revisions to the elevations and internal layout of the existing dwelling along with all associated site development works
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Erect a dwelling and garage with services along with all associated site development works
Installation of a new agriculture shed and associated site works
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
Installation of a concrete base to sit an Elliptical Milk Tank on and associated site
The construction of a new dwelling, garage, wastewater treatment unit and polishing filter, new well, new entrance onto public road, demolition of existing stables and associate works
Construct an extension to the side of our dwelling and all associated site works
Retention permission of foundations and rising walls constructed on site (granted under PRR11/4667 & 05/3286) and Permission for completion of dwelling with some alterations to same with associated site works
Construction of a bungalow, new entrance and driveway off existing laneway, new treatment system to current EPA standards and all ancillary site works
The construction of a two storey dwelling, bored well, secondary treatment system & soil polishing filter, new entrance, and all associated site works
Upgrade of existing effluent disposal treatment system to current EPA standards together with a new bored well and all ancillary site works
1. Change of use from Short Term Holiday Letting to single rural dwelling 2. Division of site boundary from existing dwelling and farmlands on site to form separate land holding from that granted under PRR06/5063, 3. Removal of existing septic tank and installation of new Waste Water Treatment Unit and polishing filter and all associated works
Dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Agricultural field gate entrance onto public road and associated works
To convert part of my home to preschool facilities and all associated site works
To relocate existing vehicular entrance to our home to improve sightlines to public road and associated site works
For a new dwelling, garage, new entrance, wastewater treatment unit and soil polishing filter and associate works
1 no. agricultural slatted unit of 67.5sqm with underground effluent storage tank, for the housing of cattle. The structure is mono-pitched with a maximum height of 4m and the effluent storage tank is 2.4m (8ft) deep. The shed is constructed of poured concrete base and rising walls, rolled steel joist (RSJ) beams and galvanised sheet cladding
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
Fully serviced dormer dwelling house with detached domestic garage and associated site works, and access drive to existing shared entrance
Erect a dwelling with services and domestic garage and all associated site and ancillary works
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Proposed revised boundaries to previously granted dwelling ref no 22/882 and associated works
95 dwellings comprising 71 no. semi-detached and terrace houses with 2,3 and 4 bedrooms together with 24 apartments in 6 blocks and Creche. The development includes provision of open spaces, roads, footpaths, connection to services and all associated ancillary site development works
Extension of existing farmhouse and permission for change of use of existing farm outbuildings to habitable space and connection back to existing farmhouse. The development consists of connection of existing farmhouse to 3 number outbuildings to provide additional family accommodation and amendments to existing effluent disposal system to EPA Standards and change of use of separate south barn to short term holiday let and separate effluent disposal system for this unit to current EPA standards
Dwelling house with services, domestic garage and all associated site works and permission for proposed improvements to the roadside boundary to create a new shared entrance to the field and dwelling house
Permission for upgrade to existing sewage treatment system