Extension to existing garden room with the re configuration of roof and all associated site works.
2 halo illuminated signs to the southern and northern elevations of Unit D and all associated works.
Plant and associated development for the permitted and under construction Unit D (Reg. Ref. SD19A/0370, Reg. SD20A/0215 and Reg. SD20A/0319; works to include 4 air handling units, 2 climate control condensers, 1 transformer, 1 container pump house, 1 sprinkler tank and all associated works including the reduction in car parking by 3 spaces on a site located between the Casement Aerodrome and the N7 national route.
Amend previously permitted application Ref. SD21A/0230 consisting of the installation of two external water tanks and associated concrete slabs, guardrails and access ladders, to the north-east of Units F & G (currently under construction) and all associated landscaping, infrastructure and site development works to facilitate the development.
Retention permission for hard stand area and for permission to complete works, incorporating the setting out of lorry trailer park, drainage network, attenuation tank together with Asphalt Concrete finish, and all associated site works.
Installation of 1 no. external permanent site back up generator to the north of the site.
Installation of 1 no. external air handling unit and associated ductwork to existing Unit F.
Installation of 2No. external non-illuminated lettered signs to the eastern and northern elevations at Unit F, Mountpark Baldonnell.
A residential development of 77 dwellings comprised of 63 two storey houses and 14 apartments & duplex units accommodated in one 3 storey building. The proposed houses are comprised of 8 two bed houses & 55 three bed houses; the proposed apartments & duplex units are comprised of 7 one bed apartments at ground floor & 7 three bed duplex units overhead. The proposed development also provides for all associated site development & infrastructural works, car & bicycle parking, open spaces, hard & soft landscaping, boundary treatments and bin & bicycle storage; access to the development will be via a new vehicular entrance at the south-west corner of the site off the Old Naas Road. Permission is also sought to demolish the existing building on site approximately 455sq.m. all on a site area of 2.28Ha, at Gordon Park, Old Naas Road, Kingswood, Dublin 22 bounded to the west by the Old Nass Road, to the south by the Silken Park development and is located in the townland of Brownsbarn.
Provision of signage on the north, south and west elevations; Provision of a storage yard, access road, mesh fence and walls to the west of Unit G; Additional door to access storage yard on the west elevation and all associated landscaping and ancillary works to facilitate the development.
We DSV Solutions Limited intend to apply for planning permission for the inclusion of a new rear elevation canopy to the existing warehouse facility located at Unit F, Mountpark Baldonnell, Baldonnell Business Park, Dublin 22 as follows: Addition of a canopy structure (157m2, 7,42m high) attached to the rear of existing warehouse unit plus directly associated elevational changes and site works.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
Material alteration to a single school wing consisting of the installation of an external insulation with rendered finish to the junior school wing and the installation of an external biomass boiler unit to the north elevation / creche wing as part of the pathfinder 2022 energy upgrade programme.
Additional 2no. fuel pumps and 2 no. islands. Retention permission is also sought for works completed. The completed works consist of the installation of 4 number underground fuel tanks (each fuel tank has a capacity of 75,000 litres and store HVO and BIO fuels), including a network of pipes and inspection manholes. These new tanks are located below ground in the Southeast corner of the site.
Relocation of 3 fuel pumps and the reconfiguration of permitted fuel islands from 1 long fuel island and 1 small fuel island to now provide for 3 small fuel islands, demolition/removal of single storey building along southern boundary and 1 new truck wash to south-western boundary of site; Planning permission is sought to remove 1 existing truck wash along the western boundary, demolition/removal of existing storage building to the western boundary and alterations to internal road layout to include directional arrows.
Proposed ground floor rear extension for use as family flat
6 floodlighting poles with varying pole top luminaire assemblies (4 poles will be 18.29m high and 2 poles are 12.19m high) located around existing grass pitches and all associated site works.
Construction of an extension and alterations to the existing sports centre building which will include alterations to part of the existing ground floor plan and the construction of a new single storey flat roof extension measuring 303sq.m to the rear and side of existing building. Accommodation will include 4 changing rooms, physio room, gym, refs room, coaching room, TV lounge, store all other associated facilities and site works.
The development will consist of a single storey extension to side and rear of existing dwelling (overall floor area 54.3m.sq.) incorporating a new common entrance hallway & toilet (10.6.m.sq.) located at the front of the proposed extension leading to a new 'family flat' (43.7m.sq.) located at the rear of the proposed extension and associated site works.
Erection of a new 95.5sq.m three bedroom dwelling house to the side of the existing house with new vehicular access and associated site works.
Single storey dwelling and detached garage with bored well and packaged waste water treatment system & polishing filter to EPA Code of Practice 2009, accessed from existing right of way.
The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement truck wash out facility (1,237 sq. metres); and related ancillary works within a 4.2 hectare application area at the existing quarry. The new concrete plant will replace the three existing concrete plants on site, all of which will be decommissioned upon commencement of operation of the new plant.
Construction of a three storey building, accommodating 13 residential units and a ground floor cafe (55sq.m); The proposed dwellings are comprised of 6 one bedroom ground floor apartments, with 7 three bedroom duplex units overhead; All associated site development & infrastructural works, car & bicycle parking, open spaces, hard & soft landscaping, boundary treatments, bin & bicycle storage etc; Access to the development will by via the permitted vehicular entrance to the south-west serving the Gordon Park residential development on site bounded to the west by the Old Naas Road, to the south and east by a permitted residential development (Ref. SD21A/0327) known as Gordon Park and is located in the townland of Brownsbarn.
Permission to demolish the rear porch and construct a corridor to the rear of the house. Retention to retain the existing single storey structure in the rear garden and use it as a bedroom and en-suite, which will be linked to the existing house with the proposed corridor, all with associated site works.
Permission to demolish the rear porch, construct a glazed link to the rear of the house and construct a new extension for a proposed bedroom and ensuite. Retention to retain the existing single-storey structure in the rear garden and use it as a bedroom and ensuite, which will be linked to the existing house with the proposed glazed link.
Retention of existing single storey extension to side and rear & porch to front of existing dwelling and all associated site works.
Ground floor side extension with pedestrian access door, pitched roof over and 1 roof light over.
Two storey extension and single storey side extension to existing dwelling, comprising of 160sq.m to ground floor and 137sq.m to the first floor, accommodating additional bedrooms and living accommodation and granny flat; Finishes to be painted sand and cement render to walls and natural slate tiles to the roof.
Proposed LED Flood-Lighting System on Grass Pitch consisting of 6 number 20 Metre high columns and all associated ducting, column bases and light fittings
The Development consists of 1. Single Storey extension to rear of property. 2. First floor Extension to the side of the existing 2 storey house 3. Installation of rooflights to the front and rear planes and construction of gable roof
Retention Permission for timber cabin used as art studio with sessional art classes to rear of existing house
Retention of conversion of a portion of an existing industrial unit for exclusive residential use for associated rewinds staff as residential accommodation over two floors consisting of 7 en-suite bedrooms; communal recreational area; communal kitchen and dining area; Permission for landscaped open space; bin and bicycle store and all associated site works.
The development will consist of A) minor demolition to the existing house to form new door open to the proposed extension, B) Minor demolition and alterations to the existing garage, C) The construction of a new single storey flat roof extension to the rear of the existing garage, and D) All associated site works.
The development will consist of sub division of the existing corner house site to allow for construction of a new two storey, 2 bed dwelling with existing access from the road off Beechwood Lawns for car parking, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The works also include demolition of two existing garden sheds to the existing site to make way for the new dwelling.
Subdivision of the existing corner house site to allow for construction of a new two storey dwelling with new access from the road off Beechwood Lawns for two car parking spaces, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The existing dwelling rear garden space will be altered as part of the works and shall include demolition of two existing garden sheds to make way for the new dwelling.
Single storey extension to side of existing dwelling consisting of downstairs sanitary facilities and utility space circa 3.5sq.m and all associated site works.
Retention for 3 no. roof lights (2 facing east a 1 facing south). A detached garden room of 16sq.m floor area. Permission for a rear, ground floor extension of 22sq.m floor area with a stove flue. A gable window facing south at attic level.
New primary school (Roll No. 20549P), including 20 classrooms, with a gross floor area of 3,449 sq.m over 3 storeys; The proposed development will also provide a no. multi-purpose hall and all ancillary teacher and pupil facilities; Vehicular, cycle, and pedestrian access to the site is proposed to the north-west of the school, with staff and visitor parking spaces; car and bus drop off and set down facilities and associated set down areas and accessible parking facilities; A secondary, future provision of pedestrian, vehicular and cycle access points are provided to the southern boundary of the site; The development will also include the provision of bicycle and scooter parking; external stores; Internal access roads, cycle and footpaths; hard and soft play areas including 2 ballcourts; piped infrastructure, connections and ducting; external plant area; landscaping and boundary treatments; green roofs, PV panels; 1 ESB substation; EV parking facilities; external courtyards and all hard and soft landscaping; ancillary ramps and stairs; lighting; signage; 3 attenuation tank; SUDs; 3 flagpoles; changes in level and all associated site development and excavation works above and below ground.
Retention of standalone residential building located at first floor level with external staircase adjacent to existing industrial unit for exclusive residential use for associated Rewinds staff as residential accommodation consisting of three bedrooms, communal living area, communal kitchen area and all associated site works.
Retain the amalgamation of both units for single occupancy and external alterations comprising of removal of external timber panel doors and replacement with PVC double glazed doors, removal of an external window and replacement of same with a double leaf door, installation of external signage and installation of external security shutters to windows and doors.
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
Single storey extension to rear, dormer loft extension to attic level to rear with solar panels to roof, two storey extension to side, energy upgrade and modifications to existing structure, rooflight to front roof ancillary works.
Two storey childcare facility of circa 459sq.m on a site measuring circa 0.136 hectares forming part of the existing Elder Heath residential estate; access to the proposed development will be via Elder Heath Walk & Elder Heath Crescent previously granted permission under Reg. Ref. SD12A/0168 (as extended under Reg. Ref. SD12A/0168/EP); car parking, landscaping and all associated site development works; the proposed development will have the effect of modifying part of a previously permitted development granted under Reg. Ref. SD12A/0168 as extended under Reg. Ref. SD12A/0168/EP.
Two storey extension to rear of 9 Ferneood Avenue Springfield Tallaght Dublin 24
Construct agricultural shed incorporating loose and storage areas; wall manure area; hardcore area and access roadway; upgrading existing entrance and all associated site works.
The development seeking retention consists of the construction of a ground floor extension to the rear of the dwelling.