EXTENSION AND REFURBISHMENT OF EXISTING DWELLING AND NEW ON-SITE WASTE WATER TREATMENT SYSTEM, TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
The development will consist of the construction of a new dwelling house, site entrance and construction of new on-site wastewater treatment system together with ancillary site development works.Decision record indexed
Cloghboley House, Cloghboley Manulla, Castlebar Co. Mayo
The construction of a new Independent Living Unit to the side of the existing dwelling house and connection to existing septic tank together with all associated site works and servicesDecision record indexed
Retain minor alterations to extension to dwelling house (change of flat roof to pitched roof) and upgrade septic tank to proprietary effluent treatment systemDecision record indexed
Construction of a new gymnasium on the club grounds including all associated ground works. The gymnasium shall consist of a structural foundation and a cladded steel structureDecision record indexed
The proposed development which will consist of the following elements: the installation and operation of 1no. battery energy storage system compound containing battery energy storage containers, 1no. electrical substation and compound, connected to the national grid system via c. 50m of underground cable to the ESB Castlebar 38kV substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years. The site of the proposed development has a total area of 0.89 hectares.Decision record indexed
Removal of the existing concrete post and wire fence, gates and pillars along the roadside boundary. The reinstatement of the roadside boundary with a capped blockwork wall with pillars and infill fence panels with new pedestrian and vehicular access gates to be set back from the line of the existing fence to accommodate the construction of a new 2.0m wide footpath along the same boundary. The provision of marked parking spaces (76 no. in total) along this roadside boundaryDecision record indexed
CONSTRUCT NEW DWELLING HOUSE, CONVERT EXISTING DOMESTIC DWELLING HOUSE INTO A DOMESTIC GARAGE AND INSTALL A NEW SEPTIC TANK WITH A RAISED PERCOLATION AREA, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
The development consists of the retention of a converted domestic garage granted under P98/1485 to habitable space, and the retention of the converted attic space over the original domestic garage for domestic use, including the dormer window installationDecision record indexed
Consist of the construction of 1 No. Dwelling House & Wastewater Treatment System with Soil Polishing Filter. Including all other ancillary site work and services.Decision record indexed
RETENTION PERMISSION FOR THE DWELLING HOUSE AS CONSTRUCTED ALONG WITH ALL ANCILLARY SITE WORKS PREVIOUS PLANNING REF NO. P86/291Decision record indexed
WORKS TO INCLUDE REVISIONS TO PREVIOUS PLANNING PERMISSION GRANTED, PLANNING REFERENCE NO 21/1300, PERMISSION TO CONSTRUCT A NEW DWELLING HOUSE, DOMESTIC GARAGE, TERTIARY WASTEWATER TREATMENT PLANT AND ALL ANCILLARY SITE WORKS. REVISIONS TO INCLUDE CHANGE OF HOUSE TYPE.Decision record indexed
The development will consist of the construction of a new single-storey family dwelling, detached garage, new wastewater treatment system, connection to existing services, and all associated site works and landscapingGrounds not yet categorised
The development will consist of the refurbishment and extension of existing dwelling house, construction of new on-site wastewater treatment system together with ancillary site development works.Decision record indexed
CONSTRUCT EXTENSION TO THE REAR OF THE EXISTING DWELLING HOUSE AND TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS ASSOCIATEDDecision record indexed
The development will consist of the upgrade of the existing septic tank system, and all associated site development works at the above address.Decision record indexed
Planning permission 1) for the demolition of existing domestic shed, 2) extension and alterations to existing dwelling house, 3) new site entrance 4) new wastewater treatment system and 5) to carry out all ancillary site worksDecision record indexed
Application to Mayo County Council on behalf of Cappaglen Developments Ltd. for planning permission to construct 32 no. houses on site previously granted permission under planning ref. No. P03/2167 & P05/1853 The development will consist of 10 no. 4 bed semi-detached houses, 8 no. 4 bed detached houses, 10 no. 3 bed semi-detached houses and 4 no. 2 bed semi-detached bungalows. The de-commission and removal of the existing temporary foul sewer and rising main system and construct and commission a new sewage pumping station at a new location with gravity sewers connected to the new pumping station. The construction of access roads and landscaped amenity open spaces including a MUGA. The application will include a Natura Impact Statement (NIS) for this development and connection to existing on site services and all associated site worksDecision record indexed
The development will consist of the construction of a new dwelling house, garage, on-site wastewater treatment system, and connection to existing services together with all ancillary site development works.Decision record indexed
CONSTRUCT PRIVATE DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO PROPRIETARY EFFLUENT TREATMENT SYSTEM, SOIL POLISHING FILTER TOGETHER WITH ASSOCIATED SITE SERVICES, PREVIOUS PLANNING P09/415Decision record indexed
Amend granted permission ref. P20/1034 for development consisting of changes to the planning approved building footprint, elevation and floor area and to the approved car parking layoutDecision record indexed
CONSTRUCT A GYM/BOXING CLUB FACILITY WITH OFFICE, CHANGING ROOMS, SHOWERS, KITCHEN, TREATMENT ROOM AND AN ADJOINING MEN'S SHED FACILITY TO INCLUDE A WORKSHOP, STORAGE, KITCHEN, TOILETS WITH ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENTDecision record indexed
Retention of an extension to the existing dwelling house at ground floor level and the retention of attic conversion to living accommodationDecision record indexed
Alterations and extension to existing dwelling house and the upgrading of existing septic tank system along with ancillary site worksDecision record indexed
The Proposed Replacement Of An Existing Septic Tank System With An Onsite Sewerage System With Polishing Filter In Accordance With EPA Code of Practice 2021 To Service An Existing Dormer Type Dwelling House And All Ancillary WorksDecision record indexed
The Proposed Replacement Of An Existing Septic Tank System With An Onsite Sewerage System With Polishing Filter In Accordance With EPA Code of Practice 2021 To Service An Existing Dormer Type Dwelling House And All Ancillary WorksDecision record indexed
EXTRACTION AND PROCESSING OF ROAD CONSTRUCTION MATERIALS FOR THE PROPOSED N5 WESTPORT TO TURLOUGH ROAD AND TO REPLACE THE MATERIALS WITH INERT FILL FROM THE AFOREMENTIONED PROJECT (SURPLUS INERT SOIL AND SUBSOIL)ON A 2.95 HECTARE SITE.Decision record indexed
RETAIN AND COMPLETE DWELLING HOUSE PARTLY COMPLETED, INCLUDING INSTALLATION OF A SEPTIC TANK/PERCOLATION - SECONDARY WASTE WATER TREATMENT SYSTEM/POLISHING FILTER AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
CONSTRUCT A NEW SINGLE-STOREY DWELLING HOUSE, SINGLE-STOREY DOMESTIC GARAGE/STORE, ON-SITE WASTEWATER TREATMENT SYSTEM AND SITE ACCESS, TOGETHER WITH ASSOCIATED AND ANCILLARY SITE DEVELOPMENT WORKS AND THE PROVISION OF ANCILLARY SERVICESDecision record indexed
Construction of a dwelling house, domestic garage, proprietary wastewater treatment system, and associated site works at the above addressDecision record indexed
Construct a bungalow dwelling house, detached domestic garage, proprietary effluent treatment system and all associated site works for same, upgrade existing entrance to domestic entrance, carry out all ancillary works on siteGrounds not yet categorised
The development will consist of the extension and redevelopment of an existing dwelling house and the construction of a garage/store and all ancillary site worksDecision record indexed