Of changes to dwelling layout and elevations from previously granted permission 08/1292 which includes addition of playroom, utility and WC at the ground floor & additional extra floor area and conservatory to the rear, relocated site entrance, changes to site layout. PERMISSION to construct a single storey extension to the side of the dwelling and all associated site works
To erect a dwelling house, garage, entrance, effluent treatment system and soil polishing filter and associated site works
To construct a storey and half dwelling house, installation of a wastewater treatment system and percolation area, new site entrance and associated site works
The development consists of the construction of a slatted unit and associated site works
To construct a dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To construct a two bay double slatted shed with creep area
To renovate / alter dwelling, to include removal of part of rear external wall and internal walls, remove lean-to roofs at side and rear and replace with new raised roof, with 3 no. velux type windows and flat roof and to erect new extension at rear, with ancillary works, to provide new internal layout
To a) RETAIN modifications to dwelling house, b) RETAIN private garage to rear of dwelling house and c) RETAIN site boundaries / site entrance / site layout as constructed along with all associated site works and services. Original planning reference P95/1017
To construct a single storey dwelling house, detached store/plant room, covered car port, PV Solar panels, entrance, boundary walls, connection to existing public foul sewer and all associated site works
For development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
Of bay window and other minor changes to the elevations of house, garage/shed for private domestic use and existing entrance and driveway as constructed and all associated site works
To construct a dwelling house with ancillary site works
To construct an Agricultural Shed and associated site works
For 40' Storage Container
To demolish to derelict dwelling house, construct a dwelling house, waste water treatment system with percolation area and associated site works
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
To install an all weather pitch and floodlighting and all associated site works
To install a padel ball court and all associated site works
`for development, the development consists of the construction of agricultural loose house and associated site works
For the construction of a dwelling house, garage, treatment unit and all associated site works
The development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To construct a dwellinghouse, accessed utilising the existing roadside vehicular entrance serving the ancestral farmhouse and landholding along with associated site works, including bored well and septic tank treatment system
To construct a 3 bedroom single storey dwelling house, entrance onto public roadway, effluent treatment system and associated works
For development which will consist of side and rear extension to existing dwelling, alterations to existing elevations, replacement of existing sewage treatment system and all ancillary works
To erect a dwelling house, garage, entrance and install an effluent treatment system and percolation area and all associated site works.
(ref#P19/696) the development will consist of demolition of ruined house, construction of one new 1.5 storey dwelling house with waste water treatment system, bored well, use of existing entrance from public road and all associated works
For development which will consist of demolition of ruined house, construction of one new 1.5 storey or dormer style dwelling house with wastewater treatment system, bored well, use of existing entrance from public road and all associated works
For the construction of a multi use games area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary and incidental works
To RETAIN and complete extension to rear of house and all associated site works
For development, the development consists of the construction of an extension to existing slatted cubicle unit, walled silage pit, an overground circular slurry store and associated site works
To construct milking parlour, collecting yard/drafting yard, office, External milk silo, water tank, Meal Bin, storage, flow channels, slatted tank, hardcore areas and all associated site works
To construct a straw bedded shed with slatted tank and ancillary works
To construct an entrance dwelling house & wastewater treatment system with soil polishing filter together with all associated site development works and services.
To construct an extension to the rear of existing dwelling, a porch entrance to the front of existing dwelling, conversion of existing attic area to include dormer windows to front & rear of existing dwelling, detached garage, demolition of existing garden shed, install a waste water treatment system and all associated site works.
To construct a dwelling house, garage, new site entrance, waste water treatment system and associated site works
Of two dormer windows, septic tank and percolation area, and an incomplete extension. and also PERMISSION for alterations to the extension and completion of the dwelling place and all associated site works
To construct a dwelling house, garage, waste water treatment system and all associated site works
Of first floor conversion including alterations to elevations and also retain garage erected for private domestic use and all associated site works
For the construction of 4 new dwellings, new vehicular entrance, pedestrian access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works.
To retain existing works & Permission for: internal alterations at existing property, The application comprises Retention of the existing 2 storey extension to the rear (previously demolished). Alterations include: minor demolition and rearrangement of the existing internal walls in order that same can be used as a single domestic dwelling house together with a new wastewater treatment facility and percolation area in adjoining lands & all ancillary works
To remove one window from front elevation and replace this window with a door and convert part of existing store room on ground floor to entrance hall to provide separate entrance to existing residential unit on first floor
To retain the as constructed covered outdoor dining areas to the side & the rear of existing village shop together with all associated site works
For to erect a two storey extension to existing dwelling house and all associated site works
To construct extension to front of private dwelling house, modify existing dwelling house, decommission existing septic tank and install new septic tank / percolation area along with all associated site works and services
For change of use from dressingrooms to a creche and preschool with minor elevational and internal alterations and all associated site works
For the change of use of part of the existing community hall, Broadford, Co Clare into a full day care early years service and all ancillary site works
Of a dwelling house and septic tank on revised site boundaries.
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To install an all weather astro turf training pitch with perimeter fencing and flood lighting and all associated site works