Installation of 360 PV solar panels covering an area of 720 sq.m on roof; all associated site and development works.
Extension to existing garden room with the re configuration of roof and all associated site works.
The 71 sq.m development consists of a single storey extension (69 Sq.m.) to the existing restaurant area at the rear of the existing licenced premises and an escape stairs (2 sq.m.) from the existing mezzanine area to the roof of the extension.
Permission for development at An Poitin Stil - A Protected Structure consisting of construction of 20 en-suite bedrooms on the roof of the single storey portion of the existing premises and construction of a new 2 storey access with a lift and stairs to the proposed bedrooms incorporating the existing tower feature on the carpark elevation.
A new vehicular entrance and boundary fence to new display surface car parking, on 0.15ha of vacant land, located west of the existing car parking including a 6m high internally illuminated signage totem and tensile fabric canopy structures. Extension of existing workshop by 208sq.m located to the north of Block B and extension of 106sq.m for new vehicle preparation to the north of Block B and internal alterations including a trade parts counter and a new double door on the west elevation of the showroom building, known as Block B, a two storey extension matching the existing height of Block C of 692sq.m to the north of the servicing area of the building known as Block C for vehicle servicing and waiting facilities and an external canopy structure of 200sq.m to the east elevation of the existing parts building known as Block A on an overall site of 2.257ha.
Construction of two 4 storey office buildings, with a total floor area of 13,250sq.m. The proposed development also provides for plant rooms at roof level (125sq.m each), all associated site development works, landscaping, basement and surface car parking, bike sheds, 2 service buildings (70sq.m each), and 2 new vehicular entrances off Bianconi Avenue, all on a site area of 2.2ha.
Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground.
Erection of a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the existing concrete apron outside An Poitin Stil car park with 2 No. LED illuminated advertising panels each of 2.0 square metre area.
Single storey front extension and all associated site works.
Single storey domestic shed/workshop and all associated site works.
Attic conversion to storeroom and bathroom complete with new dormer windows to front, side and rear of house together with all associated siteworks.
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
Change of condition 4 of previous Reg. SD09A/0277 to increase number of children at existing sessional pre-school service from 10 to 11 at any one time and from 20 to 22 in any one day.
Extend the existing two storey building on site that provides after-school education to students in the area, where the new building will facilitate second and third level students; a new shared entrance serving both buildings; proposed extension is a two storey building, matching the scale and massing of the existing building; the building has been designed to achieve a Net Zero Whole Life Carbon standard and this in part is achieved by an external brick skin, a cross laminated timber structural system, harnessing of natural light and extensive use of photovoltaic solar panels; the building programme will provide a lecture theatre, a science laboratory, classrooms, a reading room, offices, a central atrium, and a kitchen facility; the flat roof will carry solar photovoltaic solar panels and a biodiversity outdoor classroom, and all associated site works; relocate the muga within the complex to the east of the existing building and provide additional outdoor sports equipment; all proposed boundary fencing will match the existing boundary treatment in size and material.
Change of floor plans and elevations from granted Ref. SD20B/0455 - first floor extension to existing house, new garage to side; Change in roof profile to parapet style flat roof; New sewage treatment system with percolation area; Relocation of site entrance.
First floor extension to existing house; new garage to side; change in roof profile to parapet style flat roof; new sewage treatment system with percolation area.
Amendments to existing dwelling house: (a) Removal of existing pitched roof and replacement with new flat roof, (b) Demolition of existing bay window to the front and construction of a new single storey extension, (c) Redesign of existing sun room to side to include new roof and extension to the rear, (d) New first floor extension partially located over existing dwelling footprint, (e) New two storey extension to rear, (f) Revised external window and door arrangements throughout, (g) Decommissioning existing sewage treatment system and replacement with a new on-site wastewater treatment system, (h) Connection to all existing on-site services, landscaping and all associated development works.
A community Mural on the wall at 1 the rear of 1a Knockmore Avenue, Tallaght. This community mural is a project funded by the Creative Ireland Mural Grant in collaboration with the Connect 4 project, connect for life and members of the local community. The mural draws its inspiration from the poem authored by Emmet O'Brien in partnership with Sean Farrell and the Connect 4 project. The central theme of both the mural and the poem concerns the positive impact of sport on mental health.
Demolition of 1 existing dwelling and 4 out-buildings/sheds and the construction of 14 residential units comprising of 6 one bed apartments, 6 three bed duplex apartments and 2 three bed semi-detached dwellings; all with associated private open spaces areas in the form of balconies and gardens, bicycle storage, bin storage, signage, associated drainage, landscaping, boundary treatments and site works.
Two storey two bedroom semi-detached house; Demolition of side rear extension to existing house.
Construction of cattle shed, dung stead, underground effluent storage tank, concrete yard, cattle crush, farm access road and all other associated site development works.
Installation of two internally illuminated external building mounted signs to the existing south-west and north-west facades.
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
Attic conversion for storage, bay window to rear and single storey extension to rear.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
Retention of house No. 78 Rathmill Park, Rathcoole, previously granted planning permission as a 4-bed house under planning Ref. No. SD17A/0101, SD16A/0229, as a 3-bed house with study. Permission is also sought to construct a 2 bedroom house with study attached to No. 78 to form a pair of semi-detached houses, No. 78 being a 3-bed with study and No. 78A being a 2-bed with study.
Residential development consisting of 99 dwellings comprised of 84 two storey houses, 15 apartments and duplex units accommodated in 2 three storey blocks; the proposed houses are comprised of 9 two bed houses, 71 three bed houses, 4 four bed houses; the proposed apartments & duplex units are comprised of 6 one bed units, 3 two bed units and 6 three bed units, also providing for all associated site development and infrastructural works, car and bicycle parking, ESB sub-station, open spaces and landscaping, bin and bicycle storage; access to the development via a new vehicular entrance on the western boundary of the site, off the existing access road to the Luas park & ride facility on a site area of 3.14ha bounded to the north by Citywest Avenue, located east of a permitted residential development known as Citywest Village and existing ESB sub-station and is north of the Luas red line.
Proposed Attic conversion with w.c. with dormer roof window on rear slope of roof & 2 no roof lights on front slope of roof all at attic level
Construction of attached, two storey three bedroom house and all associated site works.
Retain existing mezzanine storage floor as installed at first floor level; Permission to convert part of the first floor mezzanine storage floor to office space and install new windows to both the east (side) and the south (rear) elevations at first floor level.
Erect 1 company logo advertising sign at Unit 2 (Units 1 & 2 currently under construction as per previously granted under Ref. SD21A/0162 & SD22A/0313); The signage will consist of raised backlit company logo lettering; Total area of 12sq.m located 11.43m above ground floor level on the front (southern) elevation.
2 halo illuminated signs to the southern and northern elevations of Unit D and all associated works.
Plant and associated development for the permitted and under construction Unit D (Reg. Ref. SD19A/0370, Reg. SD20A/0215 and Reg. SD20A/0319; works to include 4 air handling units, 2 climate control condensers, 1 transformer, 1 container pump house, 1 sprinkler tank and all associated works including the reduction in car parking by 3 spaces on a site located between the Casement Aerodrome and the N7 national route.
Demolition of 2 sheds and 2 compounds and works to the existing building comprising of the construction/installation of 5 external dock levellers with roller shutter doors with associated revisions to the existing western elevation to accommodate same; associated site levels and drainage layout adjustments to accommodate the development; expansion of existing concrete yard and all associated engineering and site works necessary to facilitate the development.
Planning Permission is sought for 1) the retention, conservation, restoration and change of use of 113sq.m ground floor portion of the existing 344sq.m two storey former barn building to restaurant dining & restaurant toilets 2) 4 no. pre-fabricated container type structures to be located in the court yard area which will accommodate Restaurant Kitchens, toilets & staff room 3) 1 no. 59sq.m, mostly glazed, prefabricated enclosed, pergola type structure to be located in the court yard area, which will accommodate restaurant seating & restaurant reception area 4) use of remaining existing internal court yard area as an outdoor cooking area with external pizza oven, restaurant service area and bin storage area 5) proposed vehicular/ service entrance in existing court yard wall from existing car park area 6) associated signage and 7) ancillary alterations to existing elevations and all ancillary site works.
Planning permission is sought for 1) the retention, conservation, restoration and change of use of the existing 344 sq.m two storey former barn building to a 2 storey restaurant of circa 311 sq.m. 2) ancillary commercial kitchen, restaurant seating area, toilets, ancillary office & staff rooms 3) ancillary alterations to all elevations 4) use of existing internal court yard area as a dining area, with external pizza oven, and restaurant service area accommodation a freezer container unit & bin area. 5) proposed vehicular / service entrance in existing court yard wall from existing car park area 6) associated signage and 7) all ancillary site works.
A) Change of rear roof profile from having 2no apex roof dormers to rear to having 1no full box dormer to rear b) All associated site works to rear.
The provision of an amended junction and new link road from the existing Clonlara Road to the currently undeveloped lands with Enterprise and Employment zoning objective South of the Camac River and Nort of the N7 National Route. Interim measures are included within the application to block access to the new road until such time as the undeveloped lands are developed. All associated landscaping, infrastructure and site development works to facilitate the development.
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
The development will consist of: I. 384 residential units with a cumulative gross floor area of 33,190.15 sq.m comprising: a) 122. houses, consisting of 28 two-bed units, 83 three-bed units and 11 four-bed units, ranging in height from 2-3 storeys. b) 84 duplex units, consisting of 48 one-bedroom units and 36 three-bedroom units, ranging in height from 2-3 storeys. c) 178 apartments consisting of 43 one bedroom units and 135 two-bedroom units, ranging in height from 5-7 storeys. II. tenant amenity floorspace with a gross floor area of 139 sq.m. III. 1.49 ha of public open space including a public plaza and 0.15 ha of communal amenity space; IV. the provision of a childcare facility with a gross floor area of 239 sq.m and associated play area; V. the provision of 361 car parking spaces, including 10 disabled parking spaces and 16 reserved for visitor parking and 3 reserved for creche staff. VI. the provision of 734 bicycle parking spaces, including 472 residents bicycle parking spaces and 262 visitor cycle spaces. VII. vehicular access is proposed via 3 access points including the existing Kingswood roundabout on Citywest Avenue to the north, The Walk to the west and from the park and ride access road at the eastern end of the site. Dedicated pedestrian/cyclist links are proposed throughout the site. VIII. ESB substation, 3 x ESB kiosks, rooftop solar photovoltaics, landscaping and all ancillary site and development works.
Conversion of attic to storage including a dormer window and light tube to the front at roof level.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, A-style roof dormer to the front, 1 no. roof window to the front and 2 no. roof windows to the rear
The development will consist of retention permission for 4 no windows in the existing gable walls at existing converted attic floor level.
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
Alterations to an existing planning permission Reg. Ref. SD21A/0162 for a warehouse development of 2 units (Unit 1 & Unit 2) at the 4.04ha site comprising of reduction of 237sq.m of warehouse floor area on the ground floor due to, change of use of 63sq.m of warehouse floor area to office floor area, change of use of 91sq.m of warehouse floor to staff facilities floor area on the ground floor plan, and the remainder due to the addition of a 2.4m high perimeter blockwork wall in the warehouse area; Change of use of 14sq.m of staff facilities floor area to office floor area at the ancillary office ground floor plan; Change of use of 14sq.m of office floor area to staff facilities floor area over ist & 2nd floor plan; Reduction of 28sq.m of office over 1st and 2nd floor plan to facilitate structural alignment; Minor internal alterations to the ancillary staff facilities/office layouts with no area alterations; Elevational changes, omission of 5 dock levellers & associated canopy and addition of 1 fire escape door to the building's southern elevation; Addition of 2 fire escape doors to the building's northern elevation; Alterations to Unit 2 are as follows, omission of warehouse office/staff facilities block at the south-east & north-west corner of the warehouse resulting in, change of use of 40sq.m of office floor area to warehouse floor area and change of use of 76sq.m of staff facilities floor area to warehouse floor area on the ground floor; Addition of a 2.4m high perimeter blockwork wall internally within the warehouse area, resulting in a warehouse floor area reduction of 63sq.m; Alteration to the ancillary office/staff facilities block resulting in, a reduction of 101sq.m of office floor area and addition of llm2 of staff Facilities floor area on ground floor plan; Reduction of 104sq.m of office floor area & 52sq.m of staff facilities floor area over 1st & 2nd floor plan; Elevational changes, a reduction of 2 level doors and addition of 6 dock leveller doors & associated canopy to the building's north-eastern elevation; Associated site plan and drainage adjustments.
Construction of 2 warehouses with ancillary office and staff facilities and associated development; Unit 1 will have a maximum height of 16.35 metres with a gross floor area of 8,156sq.m including a warehouse area (7,397sq.m), ancillary office areas (362sq.m) and staff facilities (397sq.m); Unit 2 will have a maximum height of 15.35 metres with a gross floor area of 5,990sq.m including a warehouse area (5,031sq.m), ancillary office areas (536sq.m) and staff facilities (423sq.m); vehicular access/egress routes to the subject site via the existing roundabout and access road; alteration to the existing access arrangements to the subject lands to facilitate safe traffic flow to/from the proposed facilities; pedestrian access; 109 car parking spaces; bicycle parking; HGV Parking; HGV yards; level access goods doors; dock levellers; access gates; signage; hard and soft landscaping; lighting; boundary treatments; ESB substation; sprinkler tanks; pump houses; and all associated site development works above and below ground on lands bounded to the south by the N7 Naas Road, to the north and west by the National Distribution Centre and to the east by Brownsbarn Drive and the Royal Garter Stables, a Protected Structure (RPS Ref. 261).