For change of house design from that previously granted under planning reference 15/672 and subsequently extended under planning reference 20/391, detached home office, entrance, onsite waste water treatment system, connection to necessary services together with all associated ancillary and incidental works
For (1) to RETAIN part of land reclamation works consisting of peat topsoil extraction, hardcore gravel, access track and fencing. (2) PERMISSION for removal of part of land reclamation works consisting of hardcore gravel, fencing and container and reinstatement of stockpiled peat topsoil and (3)PERMISSION for the installation of a 30m multi-user lattice support structure carrying telecommunications equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works. The proposed development is in a different location to that proposed under planning reference P22/453 which was refused permission. The development will provide for strategic transmission of wireless data and broadband services
To Extend the Appropriate Period of Planning Permission Ref:15/672 to construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
(1) of part of land reclamation works consisting of peat topsoil extraction, hardcore gravel, access track and fencing, (2) PERMISSION for removal of part of land reclamation works consists of hardcore gravel, fencing and container and reinstatement of stockpiled newt topsoil and (3) PERMISSION for the installation of a 30m multi-user lattice support structure carrying telecommunications equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works on land at Reaskcamoge, Woodcock Hill, Co Clare. The proposed development is in a different location to that proposed under planning reference P22-453 which was refused permission. The development will provide for strategic transmission of wireless data and broadband services
For the construction of single storey sunroom and boiler room extensions to existing dwelling house, a raised external deck, change of use of existing out buildings to residential use and all ancillary site services
To construct dwelling house, domestic shed, entrance, waste water treatment system plus all ancillary site works
To construct domestic shed on site with permitted dwelling, planning ref P23-397, plus all ancillary site works
To alter and extend existing dwelling house along with ancillary site works
For the provision of a roofed structure for dry effluent storage (dugstead) and all associated site works
For detached single storey dwelling, detached domestic garage/home office, onsite wastewater treatment system and percolation are, bored well, new entrance together with all associated ancillary and incidental site works
To construct a two storey dwelling, site entrance, waste water treatment system and all associated site works
The development will consist of one two-storey dwelling house, wastewater treatment system, percolation area, new site entrance, driveway and all associated site works
To extend and renovate an existing cottage, to install a new sewerage treatment system and all associated works
To construct a private dwelling house, wastewater treatment system along with ancillary site works and to RETAIN an existing private bored well and pump house
For (1) PERMISSION for development which will consist of (a) alterations, extension and conversion of existing garage to study room (b) construction of a new separate domestic garage (c) minor changes to existing dwelling elevations (d) all associated site works. (2) RETENTION PERMISSION for side bay window in existing dwelling
For the demolition of part of an existing dwelling house and construction of a new dwelling house, refurbishment of an existing dwelling along with all associated works
To demolish existing single storey rear extension and to construct a new single storey rear extension, waste water treatment system and all associated site works
To construct a dungstead, livestock slatted unit to include slatted tank, calving area and ancillary concrete and all ancillary site works
To construct dwellinghouse, garage, bored well, waste water treatment system, entrance and all associated site works
To erect a dwelling house, garage, entrance and install an effluent treatment system and percolation area and all associated site works.
For the construction of 1.5 storey extension to the south western elevation of the existing single storey dwelling, detached domestic double garage, relocation of existing vehicular entrance together with all associated incidental and site works
Of a garage, (x2) sheds and changes to the dwelling house extension previously granted planning permission under (PL Ref. P07/739)
To Extend the Appropriate Period of Planning Permission for P18/178 for the construction of a 44 bedroom two storey over part basement nursing home ( floor area = 3161m2), a standalone single storey services building ( floor area = 40m2 ), a standalone single storey grounds keeping store ( floor area = 22m2), together with the provision a proprietary waste water treatment system and sand polishing filter, 35 no. car parking spaces and all associated site works. permission was previously granted on the site for a two storey nursing home and day care centre development under planning register reference no. P10-358 with permission extended for same under planning register reference P16-98. This application is accompanied by a Natura Impact Statement
To construct a new site entrance, dwelling house, private garage and wastewater treatment system, along with all associated site works
The development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For the construction of 4 new dwellings, new vehicular entrance, pedestrian access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works.
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
To construct an extension to side and rear of existing dwelling house comprising living room, bedroom, sunroom and associated renovation works
For the construction of a multi use games area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary and incidental works
For the construction of a single storey extension to the side and rear of the existing dwelling together with all associated ancillary and incidental site works
For development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
To construct an Agricultural Shed and associated site works
For development which will consist of the use of a caravan as an independent dwelling adjacent to an existing outbuilding.
For the demolition of existing derelict dwelling, construction of new detached two storey dwelling, onsite wastewater treatment system and percolation area connection to necessary services, new entrance together with all associated ancillary and incidental site works
For the construction of a single storey extension to existing derelict dwelling, alterations to existing derelict dwelling, vehicular entrance with new boundaries, new effluent treatment plant and all ancillary site works
For construction of two storey extension to the rear of the existing semi detached dwelling together with all associated incidental and site works
To construct a two bay double slatted shed with creep area
Of stonework finish to front elevation, rear ground floor extension area, first floor habitable area and raised roof ridge height including all ancillary works at existing site
For the change of use of an existing derelict public house for use as a dwelling house. Permission is also being sought for the following to facilitate the change to a dwelling house:- 1) renovation of the existing building to include elevational changes; 2) demolition of existing single storey extension to the rear; 3) construction of a single storey extension to the rear; 4) construction of a two storey side extension to include a drive through arch (to access the rear yard); 5) conversion of the existing attic space including provision of rooflights to the front roof slope and a dormer structure to the rear; 6) construction of garage and shed to rear of property and 7) all associated site development works
For the following works: 1) construct a new dwelling house which will replace the existing cottage on the site 2) To change the use of the existing cottage from use of a cottage to a shed/store 3) install proprietary wastewater treatment system, percolation area and associated ancillary works
To construct a 3 column round roof shed and associated ancillary works
To demolish existing storage shed, construct Ancillary Living Unit, connect to existing on-site waste water treatment system and all associated site works
Of as-constructed 2 storey extension to the rear of the existing dwelling together with all associated ancillary and site works.
For extensions and alterations to their existing semi-detached house and for a replacement waste water treatment system
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
To construct a five bay linear roof shed, seepage tank and associated ancillary works
To alter the design of the house extension and renovation previously authorised under planning permission ref no. P21/1173 along with all associated site works
For the demolition of rear extension and garage, the construction of an extension to the side and front of dwelling house with internal modifications and elevational changes to existing dwelling house, alterations to existing site entrance and all ancillary site works
To construct 4 no warehouse units to include office accommodation within each unit and connections to the existing estate services, provision of additional heavy and light vehicular parking together with all necessary ancillary services