Planning records
Showing 401-450 of 31,885 public recordsAmendments to the Phase 2 residential development permitted under Reg Ref: SDZ19A/0008. The proposed amendments relate to permitted house No's 26-40 Hallwell Lane and No's 34-66 Hallwell Avenue (affecting the northern side of Hallwell Avenue only), resulting in changes to the permitted house types and the provision of 4 additional houses. The amendments consist of the following: alterations to permitted units 26-40 Hallwell Lane to provide for a change of house type and quantity from 12 4-bed units (Type A & A1) and 3 3-bed units (Type C2 & C3) to 17 3-bed units (Type C1, C2 & C3). These modifications result in the inclusion of 2 additional houses; Alterations to permitted units 34-66 Hallwell Avenue (northern side only) to provide for a change of house type and quantity from 17 3-bed units (Type B1, B2 & B) to 10 3-bed units (Type D1, D2 & D3) and 9 2-bed units (Type E1 & E2). These modifications result in the inclusion of 2 additional houses; all associated site and ancillary works.
10msq single storey extension to the front to extend the living room and hall. a 30msq extension to the rear to extend the kitchen and dining space and a mew window to the side
Front bay extension comprising porch and disability bedroom and bathroom. Two storey extension to rear for bedroom and kitchen.
Proposed garden boundary walls with a pedestrian gate and all ancillary works
Widening of existing driveway entrance and dishing of footpath to allow for vehicular access to include removal of pier and wall to front of existing property and all ancillary site works required
Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.
Microsoft Ireland Operations Ltd. intend to apply for permission for development at the Microsoft Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22. The development will consist of the temporary provision of 9 No. generators (fuelled with Hydrotreated Vegetable Oil (HVO)) and associated site development works for a period to run concurrently with the lifespan of the permitted development under South Dublin County Council (SDCC) Reg. Ref. SD20A/0283 and SD21A/0203. The maximum height of the flue stacks associated with the generators is c. 30.95m. The temporary works will be removed when the permission expires. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.
Construction of link element to join the existing detached single storey house to the detached garage; conversion of same garage to residential use.
Amendments to a previously permitted development (Ref. SD21A/0203 which amended Ref. SD20A/0283); Amendments relate to the permitted Gas Skid Compound to provide layout details which will include the provision of a boiler house kiosk, Electrical & Instrumentation kiosk, regulators/meters kiosk, gas analyser kiosk and all associated infrastructure and site development works; The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence; The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.
Development comprising of new pitch roofed two storey extension to side incorporating new garage at ground floor level, and all associated site works.
The erection of 1 no. single storey detached ancillary accommodation garden room (approx. 30.5m2 gross internal area) including associated site works in rear garden on overall site comprising 0.0167 hectares (circa 167 m2) approx.
To construct a two storey rear extension, kitchen extension ground floor, bedroom extension first floor, to our property and associated site works
A single storey extension to the rear of existing house.
Retention and completion of amendments of previously granted planning permission (Reg. SD19B/0452) comprising of: revision to proposed drainage layout; new first floor extension of 10sq.m to south-east including new pitched roof with new 'Velux' rooflight to south-west plane and all site works associated with all of the foregoing.
Demolition of existing single storey extension to rear and construction of new part single and part two storey extension to front, rear and side; new roof light to south plane of roof; new pedestrian entrance in existing side boundary wall and all associated site works.
The development will consist of the construction of a single- storey extension to the front of the property and all associated site works.
The development will consist of the construction of 3 no. strategic public parks located inside the Clonburris SDZ as per the Clonburris SDZ Planning Scheme (2019) in the southern part of the overall SDZ comprising: Site A) Provision of 'Stage 3' Griffeen Valley Park Extension' public park of c. 15.94 hectares, on 2 no. parcels of land north and south of the Clonburris Southern Link Street in the western part of the SDZ lands comprising landscaped areas, 1 no. all-weather GAA pitch (with floodlighting - GAA pitch is also sized to cater for 2 no. soccer pitches), 2 no. natural soccer pitches, 3 no. tennis courts and 1 no. padel court (with floodlighting), play areas, 1 no. basketball court, 2 no. cricket practice creases, 1 no. cricket crease, rebound wall area as well as allotment areas and coach parking set down area including 27 no. car parking spaces & 78 bicycle spaces (as well as 2 no. pedestrian access points to Haydens Lane) - vehicular access from permitted access under Planning Reg. Ref. SDZ20A/0021 to the Clonburris Southern Link Street; Site B) Provision of 'Stage 4A' Grand Canal Park' public park of c. 7.32 hectares (to the south of the Grand Canal) comprising 2 no. natural soccer pitches, play areas, ESB substation, and allotment area as well as 30 no. car parking spaces [with access from Lockview Road] & 66 no. bicycle spaces; Site C) Provision of 'Stage 5' Na Cluainte Park South' of c. 4.04 hectares located centrally within the SDZ (on 2 no. sites either side of the Clonburris Southern Link Street) comprising landscaped areas, attenuation ponds, 1 x Soccer All Weather Pitch (floodlit), 1 no. natural soccer pitch, 2 no. basketball courts, play areas, 2 no. cricket practice creases, and 1 no. multi-sports pitch (weights table games etc.) and allotment areas as well as 30 no. car parking spaces & 96 no. bicycle spaces, with access provided from the permitted Clonburris Southern Link Street; Permission is also sought for all associated drainage infrastructure works to include surface water attenuation areas including attenuation ponds and revisions to the permitted 'Stage 1' infrastructure under Planning Reg. Ref. SDZ20A/0021 relating to the coach parking area and attenuation area to the north of the Clonburris Southern Link Street and associated ancillary amendments and integration of the 'Stage 1' infrastructure (under construction) with the proposed development (to include relocation of flood compensation area to the west of the Griffeen River, increased landform variation in attenuation area no. 1, revisions to internal paths, removal of retaining walls to attenuation area no. 2, additional planting). Permission is also sought for all ancillary site development (including site accommodation, site compounds, and temporary construction boundary fencing) and landscape works/planting associated with the development, including hard and soft landscaping, 3 no. temporary project signage (at 3 no. locations) and Irish water foul water diversions in Grand Canal Park.
Construction of a new two storey extension to the side of the existing dwelling which will incorporate a garage and office at ground floor level and two bedrooms at first floor level.
Attic conversion to storage space to include the following: main hipped roof design changed to a gable style roof with a small 'Dutch' hip design, 5 roof lights incorporated on the main roof structure of the rear elevation, new gable wall constructed with matching materials to that of the main house.
Demolition of existing single storey structure to the side; demolition of existing garden wall to the side; construction of 1 semi-detached, two storey house and 1 semi-detached, part single storey part two storey house to the side; new vehicular entrances to serve existing and new houses; all associated site, boundaries, landscaping, drainage and ancillary works.
Demolition of existing converted garage structure to the side; demolition of existing garden wall to the side; construction to the side of 1 semi-detached two storey two bedroom house with home office and 1 semi-detached two storey two bedroom house with home office with bay windows to front and side; new vehicular entrances to Woodview Heights to serve existing and proposed dwellings; all associated site, boundaries, landscaping, drainage and ancillary works.
Construction of a part one /part three storey extension on the western and (part) southern elevation of the existing QAQC Building to provide and expanding staff cafeteria at ground floor (including the remodelling of the canteen within the existing building)and office accommodation on the 1st and 2nd floors: construction of plant room and plant area enclosure on the roof of existing QAQC building and all associated site works required to facilitate the proposed development including hard and soft landscaping to the north, western and southern boundaries of the proposed extension, a subterranean surface water attenuation tank and foul eater grease trap to the north end of proposed extension, and 2 no, surface level external plant enclosures to the south of the proposed extension.
Single storey standalone extension to the rear and attic conversion with all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
The installation of double row V-shaped duo-pitch and single row mono-pitch solar carports on the existing surface car park to the north of the QAQC Building and over part of the surface car park to the west of the Development and Drug Substance buildings, 2 no. single storey substation buildings, EV charging equipment, and all other associated works required to facilitate the proposed development including surface water drainage and landscaping
Single storey side and rear extension; all associated site works.
Retention permission consists of the construction of a canopy structure to the west of the main school building.
Retention of construction of canopy structure to the west of the main school building.
Planning permission for 1.) the conversion of an existing side garage to a playroom space, 2.) a single storey rear extension incorporating internal modifications, 3.) the conversion of the existing attic space to a new study/storage room which incorporates the change of existing roof profile from hipped roof to a half hipped gable ended profile, with new access stairs and rear dormer roof extension, plus all associated site works.
Construction of a first-floor side extension over the existing ground floor side structure incorporating internal ground and first floor modifications; a single storey rear extension; conversion of existing attic space into a store room with access stairs and 3 rooflights to the rear elevation; all associated site works.
Mono-pitch, single-storey extension to the front and side, conversion of existing garage to habitable space and installation of a rooflight to the side roof slope of the existing side extension; and provision of a new side gate to the rear garden.
2.5 storey, 3 bedroom detached house with bedroom in attic space to side of garden with use of existing family entrance and driveway to access the house and all associated site development works.
Proposed build-up of existing hip roof to side of roof into dutch hip with window in proposed gable wall at attic level. Proposed attic conversion to habitable space with dormer roof window on rear slope of roof and roof light on front slope of roof all attic level.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Proposed Build-up of existing Hip in roof to side of Roof into Dutch hip at attic level. Extension of existing Attic Conversation & use as Habitable space
Two storey extension to rear of 35.6sq.m. and a front porch extension of 2sq.m. with minor interior alterations as well as associated site works and the demolition of an existing external shed of 4sq.m.
Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 apply, constituting a change of use; The new establishment will include all the existing and permitted buildings (SD13A/0143 as amended by SD13A/0265, SD14A/0194 as amended by SD15A/0343, SD16A/0088 as amended by AD17A/0318 & SD20A/0283, SD21A/0203 & SD21A/0288, all within an existing campus; The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across the existing and permitted buildings; For the avoidance of doubt no works or physical development is proposed and the application relates to an existing development which comprises or is for the purpose of an activity requiring an integrated pollution prevention and control (IE) licence.
Temporary single storey prefabricated building located on the existing school staff car park within the site, measuring a total of 855.3sq.m and will include 9 general classrooms, staff & pupil toilets, ancillary staff/multi-purpose room and circulation. It will also include minor temporary alterations to the existing hard and soft landscaping to accommodate the temporary accommodation. These prefabs will be used to facilitate the remediation works in the Phase 1 Griffeen Valley ETNS building and will be required for a period of 12 months from the date of commencement of the works on site.
A two storey side extension (74.83 sq.m) Associated site works
The development will consist of the following: The construction of a new dormer window in the roof and extension to the side of the existing dwelling to form a new en-suite bathroom at first floor level. The development is to include for the installation of rendered external wall insulation to the existing elevations, 1no. rooflight on new dormer, internal alterations, drainage and all associated site works.
Replacement of previously approved detached three storey 5-bedroom dwelling (295 sq.m) with 2 semi-detached three storey 4-bedroom dwellings (150 sq.m each); The house being replaced was previously granted planning permission by An Bord Pleanála under ABP-304659-19 (SDCC Ref. SD18A/0310); The application also seeks the modifications to the car parking and associated site works to facilitate the revised house types.
Ground and first floor flat-roof extension to the side and rear of the property to accommodate a large walk-in wardrobe at first-floor level and a new office and playroom at ground floor level. Two new rooflights to be installed above ground floor extension to enhance natural lighting.
1) The provision of a pedestrian/cyclist entrance on the northern boundary including turnstile and disabled access gates, and stepped and ramp accesses to the footpath; and 2) The provision of a stepped pedestrian access to the existing monitoring station building at the north west boundary including repositioning of boundary fence to incorporate the area into the overall campus.
Demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of the single storey stable building on the overall site; construction of a gas powered Power Plant with all its associated elements; the part single and part two storey property of Bulmer and an agricultural building to the east of the overall site will not be demolished; The Power Plant compound of 14,475sq.m will contain 2 Power Units each with 1 25m height stack (2 overall), transformers, air intakes and electrical modules; the Power Plant compound will also contain a two storey administration and workshop building (427sq.m) and LV switchgear building (140sq.m) (567sq.m in total) plus an AGI connection, gas compressor, water tank, water treatment, firewater tank and pumps, fuel skids, fuel tank and 1 emergency diesel generator; the proposal also includes a battery energy storage system compound of 3,300sq.m containing 15 battery containers and 15 inverters that will be linked to the Power Plant; the development will be accessed from a new vehicular entrance from Peamount Road that will provide access to the Power Plant at the rear of the site; all ancillary site development works, including attenuation pond and dry swales to connect to existing infrastructural services and network as well as fencing, signage, services road entrance gate and 8 car parking spaces; the development will be enclosed with landscaping to all frontages; an EPA-Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development for a period of 10 years on a site of 8.2 hectares on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer'.
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); 1 two storey ICT facility (building B) will be located to the north-west of Building A and centrally within the overall site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); each of the two ICT facilities will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas; 2 pump rooms of 25sq.m each (4 overall - 100sq.m) plus water storage tanks and plant as well as a separate house generator that will provide emergency power to the admin and ancillary spaces; each generator will also include a diesel belly tank with a single refuelling area to serve the proposed emergency generators; 1 temporary and single storey substation (26sq.m); ancillary site development works including attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables; other ancillary site development works will include hard and soft landscaping throughout the site, lighting, fencing, signage, central services road, security gate, sprinkler tank house and 80 car parking spaces and 17 sheltered bicycle parking spaces; the development will be enclosed with landscaping to all frontages including a wetland to the south-east and will be accessed from the Peamount Road (R120) located within the townland of Milltown on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer' as well as agricultural lands and buildings which are located to the north of the Peamount Road and the lands to the north and within the overall site are subject to a concurrent application for a Power Generation Facility under Reg. SD20A/0058; An Environmental Impact Assessment Report (EIAR) is included with the application.
Retention of a single storey extension to the rear of existing dwelling with a total floor area to be retained of 17.9sq.m.
Proposed demolition of existing bungalow dwelling and construction of new two-storey 4-bedroom dwelling with pitched roofs. Proposed new flat roof car port to side and second floor flat roof extension to rear providing access to rear garden on sloped site. Recessed sheltered balcony to front living space at first floor. New pillars and gates proposed to the existing vehicular driveway. All retaining walls, external steps and associated site works included
Single storey extension to the rear; single storey canopy to the rear and side of extension; minor alterations to the south facade and associated site works.
Retention permission of widened driveway, with width reduced to 3.8m
(i) Retention permission for 'Click and Collect' signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c50 sq.m) in the existing car park for the purpose of providing 2 dedicated ''Click and Collect' spaces for the existing Tesco store and all associated site development works.