Planning permission for the revision of previously approved Planning Application FW20A/0011. The revisions include; 1 - To increase capacity from 38 to 44 children, 2 - Change operating hours from previously approved 8.30am - 5.30pm to 7.30am - 6.30pm Monday to Friday, 3 - Retention permissio for a single storey roof structure covering the rear outdoor play area (built Autumn 2020), 4 - All associated site works.
PLanning permission for retention of development.
The development consists of the installation of a photovoltaic solar array to be mounted on the rooftop of 3 no. existing buildings. The proposed development includes the provision of approximately 8,500m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure.
We, Grid Beyond Limited, intend to apply for Permission for development at this site address: Keppel Data Centre, 4 Ballycoolin Rd, Ballycoolin, Dublin 15, D15AKK1. The development will consist of the installation of energy storage units at an existing datacentre facility. The energy storage will consist of 4 no. new battery storage units, 2 no. new HV power skids (PCS transformer and HV RMU), 2 no. MV transformer, new security fence of 2.4 meters height including 2 no. new internal gate entrances.
Phase I of a two-phase masterplan for a residential, commercial and community services development. The proposed Phase I will consist of 99 houses (2 x 2-bed dormer bungalows, 74 x 3-bed two-storey dwellings and 23 x 4-bed two-storey dwellings) with associated car parking, public open space and children's play area; a two-storey building containing a creche (321.9 sq.m) over two floors and a local shop (192.9 sq.m), with office/commercial use above (209.5 sq.m); a new 3.56 ha public park (including replacement sports pitch) to the north, a new access road from Rivermeade Drive to the development including a bridge over the Ward River, a new sewerage pumping station and drainage system connecting to the public sewer, together with one electricity sub-station and all associated site works, landscaping and boundary treatments. Emergency access is provided to Toberburr Road. A Natura Impact Statement for the proposed development has been prepared and is available to view with the planning documentation. Add Info received 24th April 2020. Add Info deemed Significant 29th April 2020. Revised Public Notices received 21st May 2020.
Permission for the proposed green energy initiative development consisting of the installation of Photovoltaic Panels on the existing roof structures together with all associated site works
The development proposed consists of two apartment buildings with balconies and shared podium communal open space and undercroft car parking. Block A is four storey (three storey over podium) and contains 18 no. apartments. Block B is five storey (four storey over podium) with the fifth floor set back and contains 28 no. apartments. The total number of apartments proposed is 46 no. apartments (19 no. 1-bed, 24 no. 2-bed and 3 no. 3-bed). Both apartment buildings will feature green roofs and have provision for PV/Solar Panels. Cycle parking and bulky storage to serve the apartments will be located within the undercroft car park at ground floor level which contains 44 no. car parking spaces and 5 no. motorcycle spaces. Vehicular access to the proposed apartment buildings will be via the permitted access onto Hollywood Road permitted under P.A. Ref. FW22A/0169 (as amended under P.A.Ref. FW24A/0305E). AI Rcvd 17/01/2025
Keelings UC intend to apply for planning permission for the retention of a number of amendments to the completed Keelings Flowers unit (Warehouse facility including ancillary office space, staff facilities and site works) at c. 3.38 Ha site at Food Central, St Margaret's, Co. Dublin, as permitted under Fingal County Council Planning Reg. Ref. FW21A/0187. Retention is sought for the following amendments: 1) reduction in number of vehicular access points off new access road into site from two to one, 2) re-configuration of car parking arrangements whilst maintaining the approved number of 69 spaces, 3) relocation of bicycle parking area with an increase from 40 to 46 spaces, 4) addition of pedestrian and vehicular access gates, 5) additional area (46.8 m2) to rear (north) of ground floor office block 6) additional area (46.8 m2) to rear (north) of First Floor office block, 7), additional gantry area (56 m2) for external plant equipment at roof level, 8) amendments to the site boundary (fence) line, increasing the site area by 0.097 Ha 9) external elevation modifications, 10) Paladin fencing to site finished green in colour instead of black.
Retention Permission for self-contained log cabin in rear garden.
Keelings UC intend to apply for planning permission at a c. 3.284 Ha site at Food Central, St Margaret's, Co.Dublin. The lands are principally bounded by undeveloped lands to the south and east of the site with industrial units to the north and west. The development will comprise the construction of a warehouse unit (c. 8,617 sq m) including ancillary office space (457 sq m), staff facilities and associated development. The warehouse will have a maximum roof level height of 11.8 metres and a maximum plant height of 13.1 metres. The development will also include the provision of a new vehicular, pedestrian and cyclist entrance off the Food Central Access Road; internal roadways; 69 No. ancillary car parking spaces; bicycle parking; HGV parking spaces; trailer parking spaces; van parking spaces; dock levellers; hard and soft landscaping; boundary treatments; external canopy; smoking shelter; external stairs; pump house; water tank; compost storage area; waste storage area; lighting; signage; and associated site development works above and below ground.
Permission for the proposed green energy initiative
Retention of an internal two-tier mezzanine floor (installed 2004) for storage of materials ancillary to the existing warehouse operations. The space is used exclusively for storage.
Retention of a single storey garage and playroom (c. 50.7m.sq.) along with covered seating area and all other ancillary site development works to the rear of the existing dwelling.
Killick Aerospace Limited is applying for planning permission at Unit N3 Horizon Logistics Park, Swords, Co. Dublin. The works will consist of internal modifications to existing Unit N3 (reg ref. FW20A/0187) to include alterations to existing office space at ground floor plus new mezzanine to warehouse.
Phase II of a two-phase masterplan for a residential, commercial and community services development. The proposed Phase II will consist of 99 houses (6 x 2-bed dormer bungalows, 82 x 3-bed two-storey dwellings and 11 x 4-bed two-storey dwellings) with associated car parking, public open space and all associated site works, a new access road from Rivermeade Drive to the development including a bridge over the Ward River, a new sewerage pumping station and drainage system connecting to the public sewer, together with one electricity sub-station, landscaping and boundary treatments. A Natura Impact Statement for the proposed development has been prepared and is available to view with the planning documentation. Add Info received 24th April 2020. Clarification of Add Info received 23/7/20. Add Info deemed Significant 29th April 2020. Revised Public Notices received 21st May 2020.
Planning Permission for a) single storey extension to front porch b) single storey extension to the side and rear c) modifications to fenestration d) external wall insulation to all external walls with external render finish e) 2no. rooflights to flat roof of new extension f) and all associated site works
Three illuminated 'Bunzl' identity signs and various other non-illuminated locational and directional signs.
Planning permission to erect an ESB Sub-Station, and switch room with associated site works. Access to the proposed ESB Sub-Station, and switch room will be from the public road in Stadium Business Park, and the decommissioning and demolition of the existing ESB Sub-Station and switch room on site.
Construction of a new 9.5 m high warehouse extension to the existing facility for the storage production processing packaging and distribution of agricultural produce complete with minor inter modifications with a ground floor extended area of 710 sq.m and associated site development and ancillary works.
Construction of a new 9.5M high Warehouse extension to the existing facility for the storage production processing packaging and distribution of agricultural produce complete with minor internal modifications with a ground floor extended area of 982 sq.m, and associated site works. AI Rcvd 3/5/24
Rear single story extension and side single story extension with 2 new roof windows for extended living.
The development will consist of amendments and alterations to previously permitted 2-storey Biopharmaceutical Development and Manufacturing Building and ancillary development under Planning Reg. Reference Number FW23A/0342. The proposed development will comprise; (i) Alterations and amendments to the permitted Biopharmaceutical Development and Manufacturing Building facades, including re-arrangement of glazing, louvers and panels, and provision of new doors on all elevations; (ii) Modifications and alterations to stairs including re-arrangement of Stair 1 with reduction in building height from 18.3m to 15.5m; relocation of lift core of Stair 2 including reduction in building height from 18.3m to 15.5m; enclosure of external Stair 4 including modification in height to 18.5m and increase of floor area of approximately 101sq.m. (iii) New mezzanine floor to provide additional floor area of approximately 517sq.m and provision of new stair (stair 5) with increase of floor area by approximately 72sq.m; and provision of additional floor area of approximately 45sq.m at first floor. (iv) Alterations to roof plan with re-positioning of roof solar panels and vents, and the provision for additional roof vents and lighting rods. (v) Associated external works including alterations for re-alignment of high level pipe racks and adjustment to pedestrian canopies links between permitted buildings to provide for uncovered paved pedestrian access. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
Permission at this (c. 1.45 ha) site
Permission for the proposed green energy initiative development consisting of the installation of Photovoltaic Panels on the existing roof structures together with all associated site works
Planning Permission, for a temporary period of 3 years, for a change of use for part of existing vehicle storage compound to open air retail car sales to include car sales office of 54m sq in a single story temporary cabin structure, also new signage above the portacabin and at front entrance to the site, all at Roundabout beside Joe Duffy Motors, Exit 5 M50 North Road, Finglas, Dublin 11.
A storey and a half dwelling, shared entrance with existing entrance to family home, waste water treatment system and all associated site works.
The proposed development will comprise of: (i) Construction of a liquid waste lift station building, for process wastewater, comprising of a floor area of approximately 63 sq.m, with a maximum height of approximately 6.2m, to include underground tank approximately 5,000 litre capacity, roof extract vents with a maximum height of approximately 7.6m, and associated high level pipe racks to a maximum of height of approximately 6.8m. (ii) Construction of a tanker loading area comprising of an overground tank approximately 50,000 litres capacity and bunded concrete apron comprising of an area of approximately 106 sq.m. The tank height will be approximately 5 m above established ground level and will have a diameter of approximately 4.5m. (iii) Installation of a modular electrical building comprising of approximately 40 sq.m, with a maximum height of 3.9m to provide for battery storage and associated equipment. (iv) Provision of solar photovoltaic panel canopy structure over existing car parking, comprising of a solar panel area of approximately 340 sq.m and maximum canopy height of approximately 3.9m. (v) All associated infrastructure including alterations to existing internal access routes to allow access to truck loading yard, provision of drainage infrastructure and all ancillary site and development works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
Planning permission for a. Change of roof profile
Permission for the installation of roof mounted solar photovoltaic panels to include all ancillary works and services. AI received 10/05/21
A single storey pitched roof extension to the side of the existing house measuring 16 sq.m. consisting of a new bedroom and bathroom and the relocation of the existing side gate with associated site works associated with the development.
The construction of 1 no. new Storage Building (c. 1,643 m2 GFA) and 1 no. Store (357 m2 GFA) to facilitate the storage of plant machinery and maintenance equipment together with associated hard standing areas, hard and soft landscaping works and all associated site and engineering works necessary to facilitate the development. AI received 30/9/22 Revised Public notices received 17/10/2022
The development consists / will consist of Retention Permission for single storey domestic shed (16.1 sqm) to rear of existing dwelling & Planning Permission for part single, part two storey extension (28.7 sqm in total) to rear of existing two storey semi-detached dwelling house and all associated site works.
FINGAL COUNTY COUNCIL
Universal Developers LLC, intend to apply for a
Retention of an internal two-tier mezzanine floor (installed 2017) for storage of materials ancillary to the existing warehouse operations. The space is used exclusively for storage.
The proposed development consists of the following: • The change of use of the existing vacant two-storey office building (GFA 1,652 sq.m) to a recreational/sports facility, including gym use (Class 11); • Allocating 99 no. car parking spaces within the existing car park, including 3 no. accessible spaces, to serve the sports facility; • Provision of secure bicycle stores providing a total of 66 no. cycle parking spaces; • Minor alterations to the building elevations, including the installation of 2 no. tenant signs; and • All associated and ancillary site development works.
Planning Permission for changes to the internal layout. Modifications will include layout changes, minor changes to the elevational and fenestration. Complete with associated site ancillary works at their existing facility located at Food Central, St. Margaret`s, Co. Dublin. For Keelings Retail UC.
The development will consist /consists of change of use of existing 3,658 m2 two storey (including first floor mezzanine) building from a car salesroom to storage warehouse. Add Info received 5th November 2020. Add Info deemed Significant 6th November 2020. Revised Public Notices received 12th November 2020.
The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: - Installation of 12 no. electric vehicle charging bays (11 no. Standard and 1 no. Accessible) replacing 14 no. existing car parking spaces, each comprising a parking space and electric vehicle charging unit on the western side of access road. - Associated revisions to existing car parking area on eastern side of access road consisting of a reduction of the 14 no. existing spaces to 13 no. existing spaces to 13 no. through the removal of 4 no existing car parking spaces and reconfiguration of the adjacent existing landscaped islands. - Installation of electric power units and wire mesh fencing. - Construction of a new modular substation building. - Relocation of existing parking payment terminal. - Installation of new zebra crossing road markings at existing crossing location at northern site application boundary. - All associated lighting, infrastructure and site development works. AI Rcvd 16/11/23 SAI received 28/11/23
Permission for single storey extension to rear and associated site works. AI received 25/05/21
Provision of extension (148.9msq) to existing warehouse.
For planning permission to erect a 12.0 Ø x (not exceeding 11.5m high water storage tank and associated site ancillary works at Food Central, St. Margarets, Co. Dublin.
Permission for the proposed green energy initiative development consisting of the installation of Photovoltaic Panels on the existing roof structures together with all associated site works.
The development will consist of the use of existing hard landscaped areas (c.0.02ha) for display of motor vehicles (cars) for sale with associated boundary treatment and signage. AI Rcvd 06/06/2025
Permission for extension to an existing sprinkler pump house and all ancillary works.
Temporary retention permission and temporary permission for development on this c. 1.29 ha site. This site is referred to as 'Site 1' for the purposes of the planning application. The development for which temporary retention permission is sought comprises the use of the site as a storage facility, including: unstacked storage containers used for self-storage purposes (max. height c. 2.9m); stacked storage containers used for rent/sale off-site (max. height c. 11.6m); a depot storage shed (c. 202 sq m); an office (c. 56 sq m); vehicular access entrance to the site and associated security gates; internal access gates; 2.4m high fencing located within the site and along site boundaries; and 2.5m high block wall located along western site boundary. The development for which temporary permission is sought comprises: a 2.4m high fence, located adjacent to the existing vehicular entrance; and landscape planting. Temporary retention permission and temporary permission is sought for a duration of three years. AI Received 23/09/2025
1 Rentention of stacked containers on part of the premises which were temporarily approved under reg ref FW17A/0198. 2.Rentention of depot storage shed of 157.85 sqm2 used in container storage operations. 3. Retention of new extended storage area of 0.297 ha for storage of single non stacked containers. 4. New 10 year temporary permission for entire premises of 1.09 ha at site D&E Gateway, Rosemount Business Park, Blanchardstown Dublin 11. Add Info received 26th February 2021.
The proposed development comprises; Erection of a 2.4m high welded mesh fence to enclose and secure existing Ambulance Parking spaces at the National Ambulance Service Finglas Station, including a personnel gate, swing gates and rapid opening sliding gate; relocation of exiting cycle parking shelter, 4 No Electric Vehicle charging points adjacent to existing Ambulance parking spaces and ancillary site development works to facilitate the proposed development. Additional Information Received 12/08/2025
Planning Permission: New front and side ornamental boundary walls. New ground floor link building to connect 14A to 14B. New ground floor building entrance, reception, corridor, and external canopy 92sqm to 14A. New toilets at ground floor of 14A 20sqm. New mezzanine at first floor of 14B 188sqm, new external Fire Escape at 14B, 9 new windows at 14B and 2 new windows at 14A. Retention Permission: Front entrance doors to 14A, Fire Escape to 14A, 4 No. mezzanines at first and second floor to 14A total area 463sqm. Offices and display area at ground floor to 14B 266.6sqm. Office/meeting area at first floor to14B 108.6sqm. Offices at second floor to 14A 43.4sqm and 2 windows to 14A And All Associated Site Works
Planning permission is sought for: - Removal of 22 parking spaces to accommodate the proposed development. - Provision of a Battery Energy Storage System (BESS) compound with a total area of c. 553.8 sq.m. comprising four containerised battery units and one electrical transformer. The self-contained battery units will have a maximum height of c. 3 m and will be c. 8.8 m in length and c. 1.65 m in width. The transformer will have a maximum height of c. 3.25 m and will be c. 4.75 m in length and c. 4 m in width. - The proposed battery compound will be enclosed with security fencing to a maximum height of 2.7m with entrance gates along the southern boundary and western boundary. - All associated development including electrical connections, landscaping and planting, boundary treatments, CCTV, lighting, and all associated ancillary works.