To construct a private dwelling house, wastewater treatment system along with ancillary site works and to RETAIN an existing private bored well and pump house
The development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works
For the construction of single storey sunroom and boiler room extensions to existing dwelling house, a raised external deck, change of use of existing out buildings to residential use and all ancillary site services
To construct an Agricultural Shed and associated site works
The development will consist of one two-storey dwelling house, wastewater treatment system, percolation area, new site entrance, driveway and all associated site works
To construct an extension, comprising of a loading bay and dock leveller, to the side of the stand alone warehouse permitted under planning ref. no P22/1036.
To demolish part of an industrial unit comprising of a single storey office block and to construct a two storey office block extension, with external company signage, to construct a warehouse extension, provide a cladding finish to the north east elevation of the existing building, to replace the existing septic tank system with a new packaged wastewater treatment system and polishing filter, external hard and soft landscaping and all ancillary site works
For the construction of an extension to the side of the existing industrial building and also for a stand alone warehouse building and to extend the site boundaries and all ancillary site works
The proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be
Of the existing shed at the rear of existing dwelling house and all associated site works
For the development which will consist of the modification of the existing Planning Application 20/381 (grant date: 14.10.2020). Modification to consist of a change of design. This new design will include for the provision of a new single storey dwelling house, garage, vehicular entrance, waste water treatment system, and associated site works
For the construction of a dwelling house, garage, vehicular entrance, wastewater treatment plant and ancillary site works.
To RETAIN extension to existing dwelling; to RETAIN garage and shed to rear of property and associated site works
Of an existing 80m high lattice type meteorological mast and associated instruments, for a period of two years
To construct a two storey dwelling, site entrance, waste water treatment system and all associated site works
Of the elevations of existing dwelling house as constructed
To RETAIN change of use of dwelling house and site to full day care creche and associated site works as well as for portacabin utilised for storage at Happy Hippos Creche
To build a Dwelling House, install a wastewater treatment system & all other associated site and ancillary works
For the construction of an extension to existing dwelling house to comprise of kitchen, utility, cloaks, two bedrooms with en-suites and walk-in-wardrobes, for permission to refurbish existing dwelling and convert two existing bedrooms to study and laundry room including ancillary site works.
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
To construct a dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For development which will consist of the restoration of part of an extant sand and gravel quarry to agricultural grassland. The development is necessary to address condition no. 8 & 9 of ABP Ref. 03.QD.0011 and will include importation of inert material and all associated site development works. A Natura Impact Statement (NIS) has been submitted with the planning application
To build a dwelling house, install a waste water treatment system and all associated site and ancillary works
To alter and extend existing dwelling house along with ancillary site works
For the demolition of existing cottage ruins and for the construction of a storey and a half dwelling. the development will also consist of a new wastewater treatment system, site entrance and all associated site works
To construct a two bay double slatted shed with creep area
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
To construct dwelling house, domestic shed, entrance, waste water treatment system plus all ancillary site works
To construct domestic shed on site with permitted dwelling, planning ref P23-397, plus all ancillary site works
For the construction of 4 new dwellings, new vehicular entrance, pedestrian access, footpaths and individual wastewater treatment systems with percolation areas including ancillary site works.
For the following works: 1) construct a new dwelling house which will replace the existing cottage on the site 2) To change the use of the existing cottage from use of a cottage to a shed/store 3) install proprietary wastewater treatment system, percolation area and associated ancillary works
To construct a 3 column round roof shed and associated ancillary works
For the construction of a multi use games area (MUGA), associated side fencing and netting, artificial grass surface, floodlighting and all associated ancillary and incidental works
To construct a dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To construct a five bay linear roof shed, seepage tank and associated ancillary works
For the construction of 1.5 storey extension to the south western elevation of the existing single storey dwelling, detached domestic double garage, relocation of existing vehicular entrance together with all associated incidental and site works
Of a garage, (x2) sheds and changes to the dwelling house extension previously granted planning permission under (PL Ref. P07/739)
To Extend the Appropriate Period of Planning Permission for P18/178 for the construction of a 44 bedroom two storey over part basement nursing home ( floor area = 3161m2), a standalone single storey services building ( floor area = 40m2 ), a standalone single storey grounds keeping store ( floor area = 22m2), together with the provision a proprietary waste water treatment system and sand polishing filter, 35 no. car parking spaces and all associated site works. permission was previously granted on the site for a two storey nursing home and day care centre development under planning register reference no. P10-358 with permission extended for same under planning register reference P16-98. This application is accompanied by a Natura Impact Statement
To construct a new site entrance, dwelling house, private garage and wastewater treatment system, along with all associated site works
For (1) PERMISSION for development which will consist of (a) alterations, extension and conversion of existing garage to study room (b) construction of a new separate domestic garage (c) minor changes to existing dwelling elevations (d) all associated site works. (2) RETENTION PERMISSION for side bay window in existing dwelling
For the demolition of part of an existing dwelling house and construction of a new dwelling house, refurbishment of an existing dwelling along with all associated works
Of stonework finish to front elevation, rear ground floor extension area, first floor habitable area and raised roof ridge height including all ancillary works at existing site
For development which will consist of: conversion of the existing garage into a double-occupancy communal dwelling unit. Works include internal alterations to provide living, dining, and bathroom facilities for persons with intellectual or physical disabilities, along with modifications to external elevations and all associated site works. The proposed unit will have a gross floor area of 101 sqm and will be located on the north-east side of the existing main residential care unit
To demolish existing single storey rear extension and to construct a new single storey rear extension, waste water treatment system and all associated site works
For a single storey extension and alterations to an existing dwelling with associated site works
Of changes to dwelling layout and elevations from previously granted permission 08/1292 which includes addition of playroom, utility and WC at the ground floor & additional extra floor area and conservatory to the rear, relocated site entrance, changes to site layout. PERMISSION to construct a single storey extension to the side of the dwelling and all associated site works
For the construction of a single storey extension to the side and rear of the existing dwelling together with all associated ancillary and incidental site works
For the demolition of existing derelict dwelling, construction of new detached two storey dwelling, onsite wastewater treatment system and percolation area connection to necessary services, new entrance together with all associated ancillary and incidental site works
For construction of two storey extension to the rear of the existing semi detached dwelling together with all associated incidental and site works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and