Conversion of attic space to non-habitable space with dormer to side of existing dwelling and all associated site works.
The provision of an amended junction and new link road from the existing Clonlara Road to the currently undeveloped lands with Enterprise and Employment zoning objective South of the Camac River and Nort of the N7 National Route. Interim measures are included within the application to block access to the new road until such time as the undeveloped lands are developed. All associated landscaping, infrastructure and site development works to facilitate the development.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
The development for which retention permission is sought consists of the reconfiguration and internal alteration of the permitted ground floor layout of Block F (including plant room layout) whereby the permitted Retail Unit (42 sq.m) and Café / Restaurant Unit (176.5 sq.m) (as permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref's SD22A/0299 and LRD24A/0009W) have been augmented into a single amalgamated unit of approximately 220 sq.m in floor area, together with external alterations to the northern and western elevations of Block F at ground floor level to include the omission of a plant room door from the northern elevation and provision of same to the western elevation together with a reduction in the glazed area to the western elevation. The proposed development for which permission is sought will consist of a proposed change of use of the retained amalgamated unit at ground floor level within Block F from its permitted Retail and Café / Restaurant uses (as permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref's SD22A/0299 and LRD24A/0009W) to a Medical Clinic / Group Practice (220 sq.m) use.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
Retention of single storey extension with all associated site works.
A new vehicular entrance and boundary fence to new display surface car parking, on 0.15ha of vacant land, located west of the existing car parking including a 6m high internally illuminated signage totem and tensile fabric canopy structures. Extension of existing workshop by 208sq.m located to the north of Block B and extension of 106sq.m for new vehicle preparation to the north of Block B and internal alterations including a trade parts counter and a new double door on the west elevation of the showroom building, known as Block B, a two storey extension matching the existing height of Block C of 692sq.m to the north of the servicing area of the building known as Block C for vehicle servicing and waiting facilities and an external canopy structure of 200sq.m to the east elevation of the existing parts building known as Block A on an overall site of 2.257ha.
Retention of change of use from use as a warehouse/light industrial unit to use for the sale and storage of vehicles and service workshop (170.5 sqm)
Electric Vehicle Charging Station consisting of 5 EV charging stations, each serving 2 vehicle charging bays, a total of 10 charging points, 2 x 4 bay canopy structures incorporate circa. 84sq.m of roof mounted solar panels; The proposed development also incorporates 1 ESB substation, the use of an existing point of access / egress and all associated above and below ground ancillary works.
Partial change of use from warehouse/storage to office use on ground and first floor level consisting of offices, canteen and toilet facilities, internal staircases, and associated facilities; 1 dock leveller located on the south west elevation to existing loading bay; new external windows & doors for office spaces to the existing south east south west and north west elevations with formation of entrance to office space to existing south east elevation; new carparking/hardstanding to provide 27 car parking spaces inclusive of 2 disabled spaces; external ramped/stepped to approach to office entrance to south west elevation; alterations to existing perimeters gabion walls to the south west of existing site and realignment of kerbing and shrub line to south west elevation; car parking external LED lighting provided by way of lamp standards to car park; alterations to existing surface water drainage and associated site works.
Planning Permission for omission from a warehouse development site under construction of the superstructure associated with an ancillary sprinkler tank and pumphouse with substructure remaining as per granted planning application Reg. Ref. SD22A/0065 at Magna Avenue and Magna Drive, Citywest Business Campus, Co. Dublin.
A new two storey end of terrace dwelling house with concrete tiled roof and external finishes to match existing: new driveway and vehicular access: new dished section footpath for vehicular access and associated site works.
Proposed 250sqm (16445mm high above yard level) ancillary fridge extension to the existing Northern (Front) Elevation of the existing warehouse building. All finishes to match the existing building.
The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.
Construction of a detached single storey ESB substation with switch room & associated site landscaping & drainage works.
Minor modifications to previously approved plans (Reg Ref SD21A/0238 + SD23A/0206) of existing (2390m²) light industrial facility at Unit 25 Magna Drive, Magna Business Park, Citywest, Co Dublin D24 PVY8. Modifications include- 1)Provision of additional Warehouse/Assembly and Office staff facilities totalling 523m² additional floor area based on- a)The provision of an additional warehouse/assembly floor area at 1st floor mezzanine level (441m²). b)In addition to the ground and 1st floor mezzanine office/staff facilities granted permission (Reg ref SD21A/0238) provision of) provision of office/staff facilities at ground and 1st floor mezzanine levels which will result in 82m² additional floor area. 2)Minor alterations to Elevations to include: a)New 1st floor mezzanine escape doorway and external stairs to side (East) elevation. b)New staff entrance side (East) elevation. c)New windows to front (North), East and West Elevations. d)New Ventilation louvred panels to front (North) and East Elevations. 3)In addition to the 38 no. car parking already granted (Reg ref SD21A/0238), 7 no. additional car parking spaces (45 no. spaces in total). 4)Relocation of previously approved Electricity substation and switch room (Reg Ref SD23A/0206) to the North of the site adjacent to the vehicular access. 5)Relocation of previously approved waste management and Plant enclosures. 6)New pedestrian gates and vehicular barriers. 7)Signage totem adjacent to the vehicular access. 8)all associated site landscaping and drainage works.
Change of use of the existing warehouse/distribution facility (2,390sq.m) to a light industrial use facility for the production, assembly and distribution of plastic assemblies for healthcare and biopharmaceutical industries; provision of additional floor area at first floor mezzanine level (290sq.m) resulting in a total floor area of 2,680sq.m comprising 910sq.m of ancillary floorspace, including ancillary office areas (263sq.m), staff changing facilities, staff canteen, toilets and plant rooms; external works to the existing building including the installation of a secure gated enclosure to the rear of the building containing air handling equipment, a new escape doorway in the side (east) elevation of the building, a new access footpath; 10 new car parking spaces (including 2 disabled spaces and 4 EV spaces with charging points) (resulting in a total of 38 spaces); new bin store; new bicycle parking provision; removal of existing sign; erection of new illuminated sign (3.6sq.m); all associated soft and hard landscaping works; solar panels; all piped infrastructure; plant and any other works above and below ground associated with the proposed development.
The development will consist of the construction of a part one-storey and part two-storey, four-bedroom dwelling house (254m2); construction of a car garage (32m2); and all associated landscaping and site works
Retention consists of the construction of a rooflight in the main roof to the front of the property.
Retain existing mezzanine storage floor as installed at first floor level; Permission to convert part of the first floor mezzanine storage floor to office space and install new windows to both the east (side) and the south (rear) elevations at first floor level.
The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.
The development will consist of the construction of a part one-storey and part two-storey, four-bedroom dwelling house (235m2); construction of a car garage (32m2); and all associated landscaping and site works.
Top floor roof window to front of 3 storey dwelling.
Residential development of 112 dwellings comprised of: 90 two storey houses consisting of 10 four bed detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 42 three bed semi-detached houses and 28 three bed mid-terrace houses along with 22 one and two bed apartments in a four storey apartment building. The proposed development includes all associated site development and infrastructural works, car parking, bin storage, open spaces and landscaping. Access to the development will be via two vehicular entrances from Garter Avenue. All on a site of 3.74ha bounded to the east by the N82 Citywest Road, to the north-west by Garter Avenue and to the south by lands that will be developed as a Neighbourhood Park (permitted under Reg.Ref. SD15A/0127) in accordance with the Fortunestown Local Area Plan 2012.
To construct a single storey modular structure approx. 115m2 to existing warehouse dispatch area.
Single storey warehouse extension of 150sq.m to the south of the existing warehouse together with ancillary works including site landscaping and drainage.
Up to 268kWp (c. 1227m2) of Roof Mounted Solar PV Panels and all associated works on our premises.
A single storey garden room; area 65sqm; to the rear (north)of an existing detached dwelling. The structure is to be used as a home office and fitness rooms only in conjunction with the principal dwelling
1,444 sq m of factory warehouse space including a link building to an existing adjacent warehouse, 486 sq m of ancillary office space, 21 new car parking spaces, and associated site works.
11 residential units consisting of (i) 4 three bed duplex apartments above 4 two bed duplex apartments in a three storey building; (ii) 3 two storey terrace houses (1 three bedroom and 2 four bedroom); communal open space; surface parking; bin and bicycle storage and all ancillary site development works at a site bordered by the R120 to the north, Newcastle Boulevard to the west, Ballynakelly Green to the south and Ballynakelly View to the east.
Extend office use into warehouse area at ground and first floor to provide for office at first floor and canteen and toilets at ground floor.
Demolition of 2 sheds and 2 compounds and works to the existing building comprising of the construction/installation of 5 external dock levellers with roller shutter doors with associated revisions to the existing western elevation to accommodate same; associated site levels and drainage layout adjustments to accommodate the development; expansion of existing concrete yard and all associated engineering and site works necessary to facilitate the development.
Charles River Microbial Solutions International Limited intend to apply to South Dublin County Council for retention permission at unit no. 648, Jordanstown Drive, Greenogue Business Park, Rathcoole, Co Dublin. The retention permission consists of: Retention of minor alterations to elevations associated with changes to the window on the First Floor Level. Retention of an increase in Floor Area of the External Cold Store/freezer compound with an associated increase of size to the Cold Store and the Freezer Units, and all associated works.
Retention permission consists of 1. Retention of existing mezzanine floor at first floor level within unit 648 totalling 453 sqm. 2. Retention of additional car parking spaces within the site, some of which are utilised to serve the adjacent unit 649. 3. Retention of existing pedestrian access point between units 648 and 649. Permission is sought for 1. Change of use of unit 648 from waste metal transfer facility to provide for use of the building as a pharmaceutical warehousing building with provisions for storage, offices, laboratories and staff facilities. 2. Reconfiguration of existing offices and all associated elevational changes proposed. 3. Provision of a bicycle shelter along with an external freezer building, external cold store building, bin compound building, air handling unit and heat rejection plant. 4. Provision of an additional 18 no. car spaces for unit 648. 5. Provisions of all associated and ancillary site works. 6. Provision of new pedestrian entrance. 7. Connection to existing services. 8. Provision of associated signage.
Installation of 410 Solar PV Panels mounted on the roof of 1 existing industrial building and associated site works and services.
Construction of a double height (8.5m high) industrial warehouse building for plant machinery maintenance and storage purposes; associated ancillary two storey office and staff welfare accommodation (c.501sqm Total GFA); 9 car parking spaces, 3 bicycle parking spaces and all associated site ancillary development works and drainage connections.
Change of use of 3,397sqm of the existing interlinked complex of buildings of 18,984sqm from a mix of ancillary warehouse, packaging, logistics and research and development uses within part of the ground floor of Block E (2,952sqm) and part of the ground floor of Block G (445sqm) to office based industry that incorporates research and development, ancillary office, gym and other facilities related to the operation of the overall development. The development will include internal works only to facilitate the change of use.
Retention of the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimeter of the site with Orchard Avenue; The development also consists of the retention of 3 signs (10.94sq.m) as follows: retention of 1 sign (0.57sq.m) on plinth at the corner of Bianconi Avenue and the N82/Citywest Road; retention of 1 sign (4.58sq.m) on the eastern elevation of Block D facing the N82/Citywest Road and retention of 1 sign (5.79sq.m) on the northern elevation of Block M facing Bianconi Avenue. The development will include retention of all revisions to the permitted landscaping and site development works required.
Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works.
Retention of development comprising 638sqm extension to existing warehouse with canopy to front and 68sqm of portable ancillary office Space
Construction of an outdoor all-weather horse arena and a building to contain stables to house horses and to contain farm machinery implements and fodder, also ancillary works (i.e concrete yards, gates and boundaries), also all for agricultural purposes only in new farmyard using existing farm & road entrances.
Change of use of 148sq.m of warehouse floor area to ancillary use as research & development room and warehouse & logistics station, including internal fire escape stairs; provision of 137sq.m of additional ancillary conference/presentation room at the first floor directly over the area defined in item above. The above alterations result in 137sq.m of new floor area thus increasing the building area from 2683sq.m to 2820sq.m. The works are fully internal therefore no elevation changes or other external alterations are required. All other details remain as per granted planning applications Reg. ref SD07A/0171, SD07A/0993 and SD17A/0358.
612sq.m of warehouse space and 46sq.m of ancillary office.
Change of use of part ground floor of existing office / warehouse premises to a Deli-Cafe (Delicatessen - Cafe) to include a new recessed shopfront, signage and associated alterations and modifications.
Change of use of approved ground floor warehouse/factory area (455sq.m) to a disaster recovery/business continuity centre and change of use of approved ancillary offices at ground and first floor (459sq.m) to office use; extension at first floor area (81sq.m) to provide staff toilets and server room; external generator plant enclosure and all associated ancillary works necessary to facilitate the development.
The development will consist of the installation of approximately 658.63 sq.m of Photo-Voltaic Solar Panels onto the existing roof. The solar panels will be used to create green electricity, all of which will be used by building.
Extension of an existing warehouse by approximately 1,685sg.m and the addition of 1 loading dock, extension of existing loading yard and upgrade of 11 parking spaces for E.V charging, 2 spaces to accessible parking spaces, and the addition of 35 covered bicycle parking spaces all on a site of approximately 1.6 hectares in the townland of Fortunestown.
Modifications to existing domestic shed; raising roof to provide additional first floor head height; revised internal layout to provide for home office, gym, tool store and wc; new window and door arrangement to front and side elevations; connection to existing on site services and all associated development works.