Planning records
Showing 1-50 of 33,206 public recordsDemolition of the existing single-storey extension to the side. New two-storey extension to the side. With a side window on the first floor. Change and raise the roof profile of the existing porch to a parapet-new first-floor extension with change of main roof profile. Four Roof windows to the main roof area. Attic conversion for storage. New front window to the attic second floor. New shed to the front garden
Partial demolition of existing outhouse to side to accommodate construction of ground floor kitchen/living room extension to side of existing dwelling, and associated site works.
The construction of a concrete block boundary wall to north boundary of the front garden.
A new single storey front, side and rear extension with roof windows comprising of a den, utility room, living area, WC and kitchen. Convert attic to bedroom with new roof windows to front & rear of existing roof and all associated site works.
Erect an end of terrace two storey dwelling to the side of the existing dwelling and connect to existing services along with a new vehicular entrance to the front and new pedestrian access to the rear to serve the existing dwelling and widen the existing vehicular entrance to serve the new dwelling along with all associated site development works.
Conversion of the attic space to a storage space to include a dormer roof construction to the rear; Velux roof light to the front; Internal modifications and all associated site works.
One bedroom, two storey semi-detached house including associated hard and soft landscaping; off-street car parking; connection to existing public main sewers and boundary walls.
The development will consist of a) Demolition of side boundary wall, b) Construction of new two storey dwelling to the side of existing adjoining dwelling, c) Associated site works including construction of new boundary wall and new pedestrian access to rear, d) Widened dished pavement for vehicular access.
The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.
Demolition of existing 3.3sq.m rear kitchen lean-too and construction of new 12sq.m ground floor extension with flat roof; construction of new 4.1sq.m first floor rear extension with pitched roof; internal alterations.
The provision of alternate entrance and access arrangements from Crag Avenue to serve the permitted data storage centre, energy centre and substation development permitted under Reg. Ref. SD18A/0068, as amended by Reg. Ref. SD19A/0185 including the provision of ducted services connections between the permitted substation on site (permitted under Reg. Ref. SD18A/0068 as amended by Reg. Ref. SD19A/0185) and existing services to the south of the Grand Canal. The proposed ducted services connections will exit the permitted substation compound and run southward, crossing beneath the Grand Canal by way of a horizontal directional drill, before proceeding east and west to connect to existing services located to the south of the Grand Canal. This proposed development is also located on lands within the Grand Canal Corridor to the north of the R134 Regional Road, Clondalkin, Dublin 22.
Increased width drop kerb at the edge of the public road, in front of the house, for additional vehicular access to the off-road parking area in the front garden of the house.
Construction of new single storey extension to the rear of existing dwelling and all assocciated works.
(i) A Single-storey extension to the existing kitchen annex and (ii) A flat roof attic dormer extension. All works are to the rear of the house.
Planning permission sough for 8 square meter single story extension to front with pitched roof for new entrance and extended living room.
Retention for the construction of a garden structure circa 26sqm for home office and gym use.
New first floor rear extension over existing extension with modification of remaining roof covering ground floor element to include 3 roof lights; alterations to three first floor rear windows; inclusion of two new roof lights on rear roof of existing first floor side extension; partial attached garage converted to new utility, cloaks and toilet room, some general internal alterations on first floor level.
The development proposed will supersede the permitted ICT Facility 4 under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158. A five-year planning permission is sought in respect of this proposed development. The proposed development comprises the following: • Construction of an ICT Facility Building (ICT Facility 4), with a Gross Floor Area (GFA) of 15,744 sq.m and a parapet height of c. 21.80m (with flues located at roof level, c. 4.5m over parapet height), over 3 no. levels, located in the southern portion of the wider landholding. This ICT Facility includes an associated external plant area of c. 1,796 sq.m over two levels, accommodating 22 no. emergency generators and associated flues. • The ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas and screened plant. • Construction of ancillary structures including a guard hut, fire hydrant water storage tanks, fire hydrant pump plantroom, water mist fire protection pump plantroom and water tanks, and cold water plantroom to the west of the proposed ICT Facility 4. • Construction of a revised internal road network and circulation areas to serve ICT Facility 4, footpaths, provision of 25 no. car parking spaces (including 2 no. disabled parking bays) and 18 no. cycle parking spaces within a bike shelter. • Lighting, boundary treatments and all ancillary and associated development (including the construction of an underground foul and storm water drainage network, and utility cables). • Hard and soft landscaping and planting, lighting, screening, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables. An EPA-Industrial Emissions Directive (IE) licence will be required to facilitate the operation of the proposed development.
The development seeking permission will consist of widening the existing vehicular entrance to 3.5m wide.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, flat roof dormer to the rear and 2no. roof windows to the front.
Amendments to the development permitted under Reg. Ref. SD20A/0309 comprising: alterations to permitted ICT Facility buildings 2 and 3, to include internal reconfiguration of the ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and reconfiguration of screened plant; alterations to the external facades of permitted ICT Facility buildings 2 and 3 to include modification and reconfiguration of fenestration, louvers, loading bays, and access doors, along with an increase in height of 1.2 metres to main parapet level and reduction in the height of rooftop plant to not exceed the parapet height of the buildings, along with the omission of previously permitted flues and exhaust ducts at roof level; omission of emergency generators and associated flues from permitted ICT Facility buildings 2 and 3; The proposed amendments to ICT Facility buildings 2 and 3 result in an increase in their gross floor area (GFA) of 2,511sq.m for each building, resulting in an overall increase in the GFA of the two buildings of 5,022sq.m; Alterations to the water storage tanks serving the permitted ICT Facility buildings, including total increase of 268 sq.m GFA to the permitted pumprooms and a reduction in the scale of the associated water storage tanks. All associated and ancillary works; The application site is subject to an EPA Industrial Emissions Licence relating to the Energy Centre permitted on site (under Reg. Ref.: SD18A/0068 as amended by Reg. Ref.: SD19A/0185).
Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.
Alterations to the development permitted under Reg. Ref.: SD18A/0068, as previously amended under Reg. Ref.: SD19A/0185 and Reg. Ref.: SD20A/0242, and to the development permitted under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093. The proposed alterations in summary comprise the provision of an altered energy centre design and all associated development, along with minor alterations to the permitted site layout, provision of a gas AGI, and all ancillary works. The development, for which a 5-year planning permission is sought, will comprise the following: Construction of a revised energy centre in the western part of the subject site, to accommodate alternate generation technology, including 10 no. gas generation turbines (all with associated flues, 8 no. c. 33 metres (m) in height and 2 no. c. 15 m in height), 2 no. steam turbines including 2 no. steam turbine generator enclosure buildings with a gross floor area (GFA) of 219 sq.m each and a height of c. 6.2 m, associated steam turbine generator distribution and control structure with a GFA of 84 sq.m and an overall height of c. 4.2 m, and 2 no. steam turbine / air cooled condenser structures with a height of c. 25.4 m. Construction of 8 no. 33/20kV transformer bays to the southeast of the energy centre, with a further 12 no. gas / steam transformers to serve the proposed turbines to the west of the energy centre. Provision of 3 no. 13.6 m high fuel storage tanks, a fuel oil enclosure building (with a GFA of 50 sq.m and an overall height of c. 3.8m), a fire pump enclosure building (with a GFA of 65 sq.m and an overall height of c. 3.2 m) along with 3 no. c. 14.1 m high sprinkler tanks, a c. 14.5 m high water tank, and a water treatment plant building (with a GFA of 218 sq.m and a maximum height of c. 17 m including rooftop plant). Provision of 6 no. black-start / emergency generators to the south of the energy centre with an overall height of c. 5 m; Provision of a single storey over basement level powertrunk building (with a GFA of 932 sq.m and an overall height of c. 4.1 m) to the southeast of the proposed energy centre. Provision of a 3-storey over basement medium voltage / low voltage building (with a GFA of 3,161 sq.m and an overall height of c. 16.3 m) to the southwest of the proposed energy centre. Provision of 2 no. transformers adjacent to the substation constructed under Reg. Ref.: SD18A/0068, as amended by Reg. Ref.: SD19A/0185 (located to the southwest of the proposed energy centre). Provision of a guard hut with a GFA of 21 sq.m and with a height of c. 3.2m, to the west of the medium voltage / low voltage building. Provision of a Gas AGI (above-ground installation) to the southwest of the subject site within a fenced compound, accommodating a single storey control room building with a GFA of 10 sq.m and overall height of c. 3 m, a plant kiosk with a GFA of 17 sq.m and an overall height of c. 3 m, and a boiler house with a GFA of 13 sq.m and an overall height of c. 3m. Reorientation of permitted ICT Facility Building No. 4 to accommodate the revised energy centre layout (with no other change to this permitted building). Associated and ancillary alterations to the site layout relating to landscaping, parking (including 18 no. car parking spaces, and bicycle parking within a covered bicycle shelter to serve the energy centre) and roads layouts, lighting and services, boundary treatments, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development.
Permission is sought for construction of a bedroom extension at first floor level to the side of existing house. Alterations to elevations and internal layout. 6 No. of roof lights. Relocation of existing front door, garage conversation and all associated site development works at no. 11 Monastery Crescent, Clondalkin, Dublin 22, D22 K199.
Alteration to the front domestic south facing elevation consisting of 17sq.m of PV solar panels located on the existing house front roof pitch; alterations to first floor front bedroom windows ope to contain a central self-coloured acrylic render external insulated system on masonry wall to create new window elevational layout; alterations extending beyond the front building line of the domestic south facing elevation consisting of new self-coloured acrylic render external insulated system to ground and first floor level and grey brick slip finish to external insulated system to ground floor bay window walls.
Retention sought for the removal of the ground floor internal courtyard with canopy over as per Planning Ref SD013A/0047; Works to include, external canopy above roof level removed, new storage room created at first floor level; ground floor area incorporated into lounge area; permission for reduction in size of lounge floor area; works to include new entrance doors to Lounge area within building elevation facing car park; new external fire exit door from Lounge area to open space to rear of the building; internal walls forming snug demolished complete;Floor area included within lounge area; kitchen extension within part of previous Lounge area; relocation of Off Licence into previous Lounge area; entrance doors to Off Licence are previous entrance doors to lounge area; works to include new window to Off Licence within building elevation facing car park; change of use of previous Off Licence to takeaway; internal layout changes to lounge area public toilets; remove internal doors between Lounge area and entrance.
Planning Permission sought for: Change of use of part first floor from function room to aparthotel and construction of 2 new floors over first floor complete (at second and third floor levels) to provide aparthotel and ancillary accommodation. The total no of aparthotel rooms provided is 22. Existing roof over first floor to be removed complete to facilitate this development. Other works include: (1) Reduction in size of Ground Floor Lounge floor area to provide new separate stairs and lift to serve the aparthotel rooms on the first, new second and new third floors. External entrance doors to the stairs / lift area are the previous entrance doors to the Lounge area. (2) Internal alterations at ground and first floor levels to facilitate this development. (3) Roof garden accessed via the new stairs and lift. (4) Alterations to the existing building elevations finishes and (5) Connection to all services and all ancillary site development works to facilitate this development.
Permission is sought for construction of a single storey Extension to the rear and a bedroom extension at first floor level to the side of existing house; alterations to elevations and internal layout: 2 no. roof lights and all associated site development works at 22 Monastery Crescent Clondalkin Dublin 22
1) demolition of detached domestic garage to rear, 2) construction of a 2-storey detached dwelling to rear with new vehicular access and new pedestrian access, 3) modification to existing house rear garden perimeter including relocation of garden wall, 4) all related works.
Remove existing roof on single storey extension to rear of existing dwelling; demolish garage in rear garden; erect single storey granny flat in rear garden and re-roof existing single storey extension to rear; all ancillary site works.
1) External insulation to front and gable with smooth render finish. 2) Porch overhang to front. 3) Removal of window to front to incorporate increased entrance size and reduced window size to front. 4) Increased dormer size and modified design with parapet to gable end to rear. 5) All associated site works and drainage connections.
Ground floor rear extension with pitched roof over & 2 No roof lights over & ground floor extension with pitched roof over
1. Conversion of garage to side, 2. New ground floor extension to front, 3. Re-Configuration of entrance door 4. new 1st floor extension to side 5. revised rood profile 6. Internal modifications to dwelling layout, 7. Associated site works
The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:•Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. •E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m •Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. •Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m • All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.
The demolition of existing single storey side shed and the construction of detached two storey (two bed) dwelling to the side of existing house with amended landscaping, additional vehicular access to serve the new house onto Monastery Walk & new boundaries and site works.
Retention permission for new sectional door; 5m high by 3.9m wide; to the south-east elevation of an existing building.
Demolition of existing ground floor side porch & wc; construction of ground floor side extension with pitched roof over with 3 'Velux' roof lights over.
Two new dormer windows and a porch to the front. First-floor extension to the side. New dormer window to the rear. Single-storey extension to the rear
Erection of a first floor bedroom extension above the existing garage; raise section of the tiled roof to match the existing roof; front of the extension will have a dormer type roof with two windows to the front; convert the existing garage to a study and relocate the front door.
The development will consist of the change of use of the ground, first and second floors from class 3 office use to class 8 for use as a health centre / clinic along with all associated works.
Single storey porch extension to the front and a part two storey side/part single storey side extension. The ground floor extension is to be used as a self-contained family flat and the first floor to be an additional bedroom to the main house and all associated site works.
Replace single storey front rooms & entrance porch with new face brick single storey rooms with rooflights; new position for main entrance; new opens to front ground and first floor; replacement of all other windows and solar panels to front roof.
Retention of existing single storey rear dining room extension; construction of single storey front bay window & porch extension with 2 storey side extension for new bedrooms and bathroom.
The development will consist of ground and first floor rear extensions with flat roofs and roof lights including windows to the side and rear at first floor, new roof to the existing single storey side extension, alterations to the front, side and rear elevations, internal alterations, demolition of existing chimney stack and all associated site works.
370sqm side and rear extension, new entrance, and new facade to front elevation.
Retention of as-built extensions to the fore, side and rear at ground floor existing two storey house with amendments to all elevations & ancillary site works.
Permission and retention permission is sought for the following development: Permission for an ancillary generator structure with a total height of c. 22m located between ICT Facility 2 and ICT Facility 3 including 13 no. double-stacked back-up generators with flues of c. 25m, fuel storage, transformers, and associated electrical equipment and plant. Permission for 13 no. ancillary generators within a fenced compound, with a total height of c. 8.1m located to the north of ICT Facility 3, including 13 no. back-up generators with flues of c. 25m, fuel storage tanks and fuel pump room building, transformers, and associated electrical equipment and plant. The primary fuel for the proposed back-up generators will be Hydrogenated Vegetable Oil (HVO). Permission for associated works including services connections, boundary treatments, lighting, and all ancillary works. Permission for reconfiguration of car parking spaces and the retention of 10 no. car parking spaces to the west of ICT Facility 3, resulting in an overall reduction of 8 no. car parking spaces. Retention permission for 4 no. existing water tanks with a total height of c.9.2m and an existing water processing building with a total height of c. 5.1m, located between ICT Facility 2 and ICT Facility 3. Retention permission for 1 no. sprinkler tank with an overall height of c. 8.1m and a single storey pump room with a total height of c. 3.2m to the north of ICT Facility 3. An EPA-Industrial Emissions Directive (IE) license is required to facilitate the operation of the proposed development.
1) Demolition of existing single story lean-to-roof extension to rear. 2) New single storey flat roof extension to the rear. 3) New dormers to the front and rear of attic. 4) All associated site and auxiliary works.
Conversion of the attic to storage including a new dormer structure with 2 windows to the rear elevation and a new velux rooflight to the front elevation, all at roof level.
Proposed roof light on front slope of roof at first floor level.