Planning records

Showing 1-8 of 8 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    SD24B/0163WGranted

    3, Tower Road, Dublin 22

    The development will consist of 1) a side garage conversion and second storey side extension, 2) a single storey lean to extension to the rear, 3) the widening of the vehicular front entrance, 4) a front porch extension 5) a roof light on the south facing hipped roof and 6) all site ancillary works.Decision record indexed
    Decision11 June 2024View record
  2. © OpenStreetMap
    SD18A/0134/EP2Granted

    Grange Castle Business Park, Clondalkin, Dublin 22

    Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.Decision record indexed
    Decision08 November 2023View record
  3. © OpenStreetMap
    SD18A/0134/EPRefused

    Grange Castle Business Park, Clondalkin, Dublin 22

    Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.Grounds not yet categorised
    Decision07 September 2023View record
  4. © OpenStreetMap
    FW21A/0180Granted

    Lands at Horizon Logistics Park (known as Site P1), Off the R108, Town

    The proposed development consists of the following: The construction49 conditions indexed
    Decision22 February 2022View record
  5. © OpenStreetMap
    F20A/0529Granted

    Drumlattery, Skerries, Co. Dublin.

    Permission to construct a 27 meter multi-user lattice mobile and broad17 conditions indexed
    Decision21 May 2021View record
  6. © OpenStreetMap
    FW20A/0169Granted

    Northwest Logistics Park (formerly known as Northwest Business Park),

    The proposed development consists of the construction of 1 no warehous33 conditions indexed
    Decision07 December 2020View record
  7. © OpenStreetMap
    FW20A/0021Granted

    Dublin Inland Port, South of Dublin Airport Logistics Park, Off Maple

    The development will consist of storage and logistic facilities compri22 conditions indexed
    Decision07 April 2020View record
  8. © OpenStreetMap
    SD19A/0225Refused

    43 & 44, Tower Road, Clondalkin, Dublin 22

    Change of use of the first floor from offices in No. 43 and restaurant in No. 44 to 3 two bedroom apartments and 1 one bedroom apartment and an interconnecting doorway between the two existing ground floor shop at No. 43 and the takeaway food shop at No. 44 Tower Road; new stone-clad shopfront with an aluminium glazing system and signage in the fascia over each unit.Grounds not yet categorised
    Decision14 January 2020View record
Showing 1-8 of 8
PreviousPage 1 of 1Next