Showing 1-22 of 22 public recordsConstruction of 280 no. dwellings, a creche, and open space as follows: A) 128 no. 2 storey houses (8 no. 2 bedroom houses, 94 no. 3 bedroom houses, 25 no. 4 bedroom houses and 1 no. 5 bedroom house; B) 116 no. apartments in 2 no. 5 storey buildings comprising (54 no. 1 bedroom apartments & 62 no. 2 bedroom apartments, all with terrace or balcony along with solar panels and green roofs at roof level as well as telecommunications infrastructure comprising 9 no. support poles on ballast mounts (to accommodate 1No. 2m 2G/3G/4G antenna & 1No. 5G antenna each) & 3 no. poles on lift overrun (to accommodate 2No. Ø0.3m Microwave links each at roof level of Apartment building B, together with associated equipment and cabinets/shrouds); C) 36 no. apartments/duplex apartments in 3 no. 3 storey buildings – (18 no. 2 bedroom apartments and 18 no. 3 bedroom duplex apartments) all with terrace; D) Amendment to permitted Creche (c. 518sqm) in ‘Graydon’ (ABP References: TA06S.305343 & ABP-305343-19) to now provide a Creche of c. 778 sq. m of 2 no. storeys; E) Open space, hard and soft landscaping (including public lighting & boundary treatment), communal open space for duplex apartments and apartments; along with single storey bicycle/bin stores and ESB substations; F) Vehicular access from the Athgoe Road from a new signalised junction along with upgrades to footpath and pedestrian crossing as well as provision of vehicular/pedestrian/cycle link to permitted ‘Graydon’ (TA06S.305343) ‘Newcastle Boulevard’ to the east, as well as 423 no. car parking spaces and 370 no. bicycle spaces and all internal roads, cycleways, green routes and paths; G) Provision of Surface water attenuation measures and underground attenuation systems, connection to water supply, and provision of foul drainage infrastructure as well as underground local pumping station to Irish Water specifications and all ancillary site development/construction/landscaping works. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Development Plan and Local Area Plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
The development will consist of: • Provision of a drive-thru lane for the Costa Coffee unit, including a canopy and service hatch on the northwestern side of the unit, a height restrictor / entrance barrier on the access lane, 3.5m wide drive-thru lane, and associated hard and soft landscaping, • Provision of associated signage consisting of 2 no. directional signage, 1 no. order station, and 3 no. menu boards / advertisement signs; • Alterations to all elevations of the Costa Coffee unit, including the provision of new signage on all elevations; • Associated alterations to the existing car parking layout including the removal of 4 no. associated parking spaces, realignment of the pedestrian walkway and provision of a pedestrian crossing; • Alterations to the existing external bin storage unit • An increase of unit floor area of 8 sq.m; and • Alterations to landscaping, outdoor seating area, and all associated development.
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Permission for a strategic housing development shall provide for the construction of (a) 118 no. residential apartment units in the form of 3 no. residential blocks of apartments ranging in height from 4 storey’s and transitioning to 6-7 storeys overall. The overall development proposal shall provide for the following: Block A (7 storeys) comprising 44 no. units (13 n0. 1 bed units, 28 no. 2 bed. units and 3 no. 3 bed units); Block B (6-7 storeys overall) comprising 38 no. units (11 no. 1 bed units, 26 no. 2 bed units and 1 no. 3 bed units); and Block C (6 storeys overall) comprising 36 units (10 no. 1 bed units; 22 no. 2 bed units and 4 no. 3 bed units); Each new residential unit has an associated area of private open space in the form of balcony / terrace area and set back upper floor levels; Open space (approx. 2,071 sqm) is provided by one major centrally located public open space (1158.4 sqm) between blocks A and B which include a play area of 63.2 sqm, two further communal open space areas are provided adjoining Blocks B (471.8 sqm) & Block C (440.8 sqm); Communal Area located at the ground floor of Block B (approx. 161.3 sqm) comprising of a shared working space (35.6 sqm), meeting rooms (42.2 sqm.), a gym (36.6 sqm) and changing/tea stations (46.7 sqm) is also proposed; 2 no. basement level areas (approx. 2,340.9 sqm) are also proposed at lower ground / ground floor level of Blocks A, B (1,470.0 sqm) and C (834.9 sqm) and include car parking, bicycle parking, refuse storage areas, plant areas and ESB Substation which is located between Block B and C; A total of 103 no. car parking spaces (67 no. at basement level and 36 no. at surface level to include 17 no. electric power points and 5 no. accessible parking spaces) are proposed. In addition, 5 no. motorcycle parking spaces (3 no. at basement level A and B, and 2 no. at basement level C). A total of 280 no. bicycle parking spaces (254 no. at basement level and 26 no. at surface level) are also proposed; Proposals for vehicular and pedestrian access comprise via Glenamuck Road North and all associated upgrade works; The access point to the south (via Carricáil) is for pedestrians and cyclists only; Associated site and infrastructural works including the provision for water services, foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works to include new tree and hedge planting; green roofs; boundary treatments; internal roads and footpaths; and electrical services. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development may materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.grnshd.ie
Permission for development at this site. The site comprises land adjacent the Carrickmmines Stream and Carrickmines Luas Park & Ride. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended). The development will comprise a mixed-use Village Centre and residential development as follows: 402 no. apartments (comprising 146 no. 1-beds; 218 no. 2-beds and 38 no.3-beds) within 6 no. blocks (Blocks A-F) ranging in height up to 5 storeys with basement/undercroft parking areas. 41 no. terraced/semi-detached/detached houses (comprising 19 no. 3-beds and 22 no. 4-beds). A supermarket (c.1,306 sq.m), 7 no. retail/retail services units (c.715 sq.m total gross floor area); 2 no. non retail/commercial units (c.213 sq.m total gross floor area); creche (c.513 sq.m), gym (c.155 sq.m), community space (c.252 sq.m) residential facilities (c551.8 sq.m total gross floor area), office/high intensity employment use (c.708 sq.m). Provision of car/bicycle/motorcycle parking at basement/undercroft/ground level. ESB sub-stations/switchrooms/kiosks, waste storage areas, plant areas. Provision of the first phase of Priorsland Public Park along the Carrickmines Stream and additional public and communal spaces. Provision of an acoustic barrier along the southern/ south-western edge of the site adjacent to the M50. Construction of Castle Street on the subject lands and two road bridges across the Carrickmines Stream, one to serve a future school site, the second to provide interim pedestrian and cyclist access to the Carrickmines Luas Station and future Transport Interchange. Provision of a pedestrian bridge from the Village Centre to Priorsland Park. The proposed development includes for all associated site development works landscaping, boundary treatments and service provision. The application contains a statement setting out how the proposal will be consistent with the Dun Laoghaire -Rathdown County Development Plan 2016-2022 (currently in force) and the Dun Laoghaire - Rathdown County Development Plan 2022-2028 (adopted, not yet in force), and the Cherrywood SDZ Planning Scheme, 2014 (as amended). An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development
Retention for ground floor rear Extension and permission for extension to first floor at rear and all ancillary site works
Zolbury Limited intend to apply to An Bord Pleanála for planning permission for a Strategic Housing Development on a site of c. 3.7 ha at Blackglen Road and Woodside Road, Sandyford, Dublin 18. The site is bounded by Blackglen Road to the north, Woodside Road to the South, and existing dwellings and associated lands to the east and west. The development shall consist of a new residential scheme comprising 360 no. residential units, associated resident amenity facilities and a childcare facility in the form of 9 no. new apartment buildings (A1 - C3) as follows: • Block A1 (4 storeys) comprising 18 no. apartments (3 no. 1 bed units and 15 no. 2 bed units); a crèche facility of approx. 401 sq. m with associated outdoor play space of approx. 20 sq. m; and resident amenity facilities of approx. 30 sq. m. • Block A2 (3-4 storeys) comprising 24 no. apartments (2 no. 1 bed units and 22 no. 2 bed units) and resident amenity facilities of approx. 390 sq.m. • Blocks B1 and B2 (2-6 storeys) comprising 69 no. apartments (30 no. 1 bed units, 34 no. 2 bed units, 5 no. 3 bed units). • Blocks B3 and B4 (2-6 storeys) comprising 62 no. apartments (30 no. 1 bed units, 27 no. 2 bed units and 5 no. 3 bed units). • Blocks C1, C2 and C3 (3-6 storeys) comprising 187 no. apartments (58 no. 1 bed units, 126 no. 2 bed units and 3 no. 3 bed units); and resident amenity facilities of approx. 187.5 sq. m. Each residential unit is afforded with associated private open space in the form of a terrace / balcony. Total open space (approx. 22,033 sq. m) is proposed in the form of public open space (approx. 17,025 sq. m), and residential communal open space (approx. 5,008 sq. m). Podium level / basement level areas are proposed adjacent to / below Blocks A2, B1, B2, B3, B4, C1, C2 and C3 (approx. 12,733 sq. m GFA). A total of 419 no. car parking spaces (319 no. at podium/basement level and 100 no. at surface level); to include 80 no. electric power points and 26 no. accessible parking spaces); and 970 no. bicycle spaces (740 no. long term and 230 no. short term), and 19 no. motorcycle spaces are proposed. 10 no. car spaces for crèche use are proposed at surface level. Vehicular/pedestrian and cyclist access to the development will be provided via Blackglen Road to tie in with the Blackglen Road Improvement Scheme. A second access is also proposed via Woodside Road but this access will be for emergency vehicles and pedestrian and cyclist access only. The proposal also provides for Bin Storage areas and 4 No. ESBN substations to supply the development. 3 no. sub-stations shall be integrated within the building structures of Blocks B and Blocks C. In addition, one Sub-station shall be classed as a unit sub-station mounted externally on a dedicated plinth. The associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; green roofs; boundary treatment; internal roads and footpaths; electrical services; and all associated site development works. Website: https://bgrshd.ie/
Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
To view details of this application please visit www.coolquayshd.ie. We, Breffni Asset Holdings Ltd., intend to apply to An Bord Pleanála for permission for a strategic housing development at this site at Coolquay Common, The Ward, Co. Dublin. ABP 314360 The total planning application site area extends to c. 153,710 m2 (15.37 Ha) with a residential site development area of 101,130 m2 (10.113 Ha). The development will consist of; 1. The construction of 173 no. residential units (125 no. 3-bed dwelling units of 13,320.8 m2, 17 no. 4-bed dwelling units of 2,178.6 m2, 17 no. senior living units of 1006.9 m2 and 14 no. duplex units of 1,244.6 m2). 2. Provision of 358 no. surface car parking spaces, including accessible spaces, electric vehicle charging points and 43 no. bicycle parking spaces (18 no. resident and visitor spaces for duplex units and 25 no. spaces associated with supporting commercial development). 3. Provision of a two storey mixed-use building of c. 656.96 m2 GFA providing for retail and commercial units, associated car and bicycle parking and a dedicated landscaped plaza. 4. The provision of a two storey childcare facility of c. 567.7 m2 GFA with capacity for in the order of 102 no. children with associated car and bicycle parking and dedicated secure open play area. 5. Provision of a two storey community centre of c. 353.12 m2 GFA with associated car and bicycle parking and dedicated hard and soft landscaping areas. 6. Provision of Class 2 public open space of c. 22,670 m2 (22.41 % of residentially zoned area), communal open space of 540 m2 and Class 1 public open space of c. 4.91 Ha on adjoining RU “Rural” zoned lands forming a multifunctional biodiversity park. 7. Vehicular access to the development site will be via a new vehicular entrance on the R130 to the north and via 2 no. new vehicular entrances on the L-7200- 0 to be upgraded as part of this strategic housing development application. 8. Road widening and improvement works are also proposed to the existing road network bounding the subject site including the provision of c. 602.5 meters of pedestrian and cycleways. 9. Provision of internal roads and pathways, hard and soft landscaping and boundary treatments, pumping station, plant, solar panels, attenuation tank and related SUDS measures, signage, public lighting and all associated site development and excavation works above and below ground necessary to facilitate the development. The total gross area of the proposed residential development is 17,750.9 m2 with a net residential density c.17.47 units per hectare. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal Development Plan 2017-2023. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. The application, together with the NIS, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application and the NIS may also be inspected online at the following website set up by the applicant: www.coolquayshd.ie
A new unmanned service station development consisting of construction of new petrol filling station forecourt with 4 dispensers, 2 underground fuel storage tanks with canopy structure (covering c. 235sq.m and 6.2m in height) with associated signage; Widen existing site entrance to the north-east of the site and creation of new egress location onto the Fonthill Road along the northern boundary to allow one-way internal road network incorporating new pedestrian crossing over existing footpath at site egress location; Automatic brush car wash and adjoining jet car wash with water recycling system; Single storey services building structure comprising of a car wash plant room and comms room area (gross floor area 16.3sq.m.); 4 electric charging bays, each comprising of a parking space and electric vehicle charging unit and associated signage; 3-room ESB substation to cater for EV charging infrastructure (gross floor area 38.3sq.m.); Air/Water services area with 2 car parking spaces; 2 internally illuminated double-sided totem signs, 1 at site entrance (4m high x 1.91m wide) with advertising area 15.3sq.m and 1 adjacent the new site egress location (5.8m high x 1.91m wide) with advertising area 22.16sq.m; All other associated underground and overground infrastructure, drainage, lighting, CCTV unmanned systems, landscaping and site development works.
PROTECTED STRUCTURE: The development will consist of a 74 unit Build to Rent scheme consisting of 11 no. 2-bedroom apartments, 18 no. 1-bedroom apartments and 45 no. studio-apartments and ancillary communal areas in an 8 storey over lower ground floor level building. The gross floor area of the building to be 6032sqm with 640sqm communal facilities to include a gym area, communal social area with kitchen facility, bike storage for 122 bicycles (22 at ground floor and 100 at lower ground floor), bike repair station, workspaces, meeting rooms, communal storage area and a parcel room. With ancillary plant / services and 390sqm of communal landscaped garden (210sqm at ground floor and 180sqm at lower ground floor). At ground floor level 4 no car parking spaces, 22 no bicycle parking spaces, external lift and enclosure to lower ground floor level, ESB sub station and 2 no external stairs to lower ground floor level. Ground floor accommodation within the building to include a 50sqm reception area, 2 no. communal lounge areas, with 2 no. lifts, 3 no. stairs and residential accommodation. There is a 56sqm communal roof terraces at sixth floor level along with 2 no. additional roof terraces at seventh floor (93sqm and 48sqm). There are proposed balconies to the South, West, and East. All with enabling and site development works, landscaping, boundary treatment, lighting, services and connections, waste management and all other ancillary works.
Construction of 2 two and a half storey, three-bedroom terrace houses and associated site works attached to the existing two and a half storey house at No. 6 Station Grove which was constructed in 2006; the 2 houses will complete this partially finished housing development which was originally granted permission under planning reference SD05A/0125.
Permission for development. The application relates to development within the Cherrywood Strategic Development Zone (SDZ) and is subject to the Cherrywood Planning Scheme, 2014 (as amended). The development will comprise a mixed-use Village Centre and residential development as follows: 404 no. apartments (Comprising 141 no. 1-beds (ranging in size from c.45 sq.m to 61.1 sq.m), 225 no. 2-beds (raging in size from c.63 sq.m to 89.5 sq.m), and 38 no. 3-beds (ranging in size from c.90 sq.m to c.122 sq.m)) within 7 blocks ranging in height from 4 to 5 storeys and with 4 no. basement/undercroft parking areas. 41 no. houses (comprising 19 no. 3-beds and 22 no. 4-beds) ranging in size from c.1115 sq.m to c.146 sq.m. A supermarket (c.1,315 sq.m), 7 no. retail/ retail services units (c.823 sq.m total gross floor area) ranging in size from c.55.8 sq.m to c.178 sq.m), 3 no. non-retail commercial units (c.347 sq.m total gross floor area) ranging on size from c.88 sq.m to c.138 sq.m), creche (c.486 sq.m), gym (c.155 sq.m), community space (c.253 sq.m), residential facilities (c.299 sq.m total gross floor area) within 2 no. units, office /High Intensity Employment use (c.998 sq.m). 627 car parking spaces. 605 no. bicycle parking spaces with 472 no. provided within 11 no. bike stores (totalling c.782 sq.m) located at basement/undercroft/surface level. 5 no. ESB sub-stations/switchrooms (totalling c.51 sq.m). Gas skid (c.4.8 sq.m). 11 no. waste storage areas (totalling c.401 sq.m). 7 no. plant areas (totalling c.516.70 sq.m). Provision of a new public park and a park/greenway along the Carrickmines Stream. Provision of an acoustic barrier along the southern/south-western edge of the site adjacent the M50. Construction of Castle Street on the subject lands and two bridges across the Carrickmines Stream, one to serve the future school site, the second to provide pedestrian and cyclist access to the Carrickmines Luas station and future Transport Interchange and adjoining 3rd party development lands to the north. In accordance with Section 7.2.2 of the Cherrywood Planning Scheme, 2014 (as amended) it is proposed to utilise an existing Right of Way to the west of the application site, to facilitate construction access to/from Glenamuck Road North Roundabout for an interim period until such time as the remainder of Castle Street (on third party lands to the east of the application site) is completed and becomes available for construction and operational traffic. The proposed development includes for all associated site development works, landscaping, boundary treatments and services provision. The total gross floor area of the proposed development is c.48,606 sq.m with c13.058 sq.m of basement/undercroft parking area. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development.
Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.
Two storey extension to the rear of existing dwelling, to include rooflights and all ancillary site works.
Alterations to previously approved, but not yet constructed development under planning Ref. Ref. (SD11A/0135 - Block A was approved as a primary health care building and will remain so; Block B was approved as a nursing home building and permission is now sought to use that building as a primary health care us; Permission is also sought for an external café and relocation of sub-station from entrance area to a position on Fonthill Road); alterations to Block A of 3,249sq.m consist of minor internal reconfiguration to stair No. 1 cores, position of lift shafts and circulation areas; alterations to Block B of 3,521sq.m (previously approved use as a nursing home) to facilitate the use as a primary healthcare centre include internal reconfiguration to provide 10 consultation rooms; 37 offices; 7 clinic rooms; 4 administration/reception; 4 large group rooms and associated ancillary uses including a new external lift and stair to car park; a total of 149 car parking spaces are to be provided for the proposed development; this includes 125 spaces at basement level including 6 accessible car parking spaces and 24 spaces at surface level including 3 accessible car parking spaces; alterations to the previously approved permission also include for 20 new bicycle parking spaces; new plant space and storage; the previously approved entrance from Boot Road/Convent Road providing pedestrian, cycle and vehicular access including previously approved landscaping, remain as approved.
Construction of Phase One of the Adamstown District Centre; proposed development is a mixed use commercial and residential development of c.36,621sq.m (gross floor area) in total (excluding the multi-storey car park) to be constructed in buildings ranging in height from 4-9 storeys. The non-residential element of the development consists of a total of c.9,653sq.m (net sales floor space), as follows: 16 retail units comprising c.8,693sq.m including 1 supermarket (c.6,880sq.m in total) and 2 retail service units (c.290sq.m); 5 retail/restaurant/café units comprising a total of c.959sq.m; projecting signage and awnings on retail and retail/café/restaurant units. The residential element consists of a total of 278 residential units comprising 16 studio units, 66 one bedroom units, 151 two bedroom units and 45 three bedroom units in a mix of apartments and duplexes; ancillary residents amenity rooms and facilities also provided and all residential units are provided with private open space in the form of balconies or gardens. The proposed block description as follows: Block B (c.14,506sq.m gross floor area) 4-7 storeys with setbacks at 4th and 5th floors arranged around an internal courtyard accommodating 6 retail units and 3 retail/restaurant/café units at ground floor level; residents amenity area at first floor and 135 residential units including 15 two bedroom own door duplexes and 120 apartments (1 studio, 46 one bedroom, 50 two bedroom and 23 three bedroom units); private front gardens are provided at ground floor level on the west and south elevations and balconies are provided on all outward facing elevations of the building and on courtyard elevations; car parking is provided at ground floor within the interior of the courtyard along with bicycle parking and ancillary management, waste, plant and service areas; a residents communal open space is provided at first floor level on a podium above the car parking area; Block E (c.15,235sq.m gross floor area) 4-9 storeys with setback at 5th floor arranged around an internal courtyard accommodating 9 retail units and 2 retail/restaurant/café units at ground floor level and 143 residential units including 10 two bedroom own door duplexes and 133 apartments (15 studios, 20 one bedroom, 76 two bedroom and 22 three bedroom units); private front gardens are provided at ground floor level on the west elevation and balconies are provided on all outward facing elevations of the building and on courtyard elevations; car parking is provided at ground floor level within the interior of the courtyard along with bicycle parking and ancillary management, waste, plant and services areas; a residents communal open space is provided at first floor level on a podium above the car parking area; Block F (c.30,647sq.m gross floor area including car parking levels) 4 storeys, a supermarket is provided at ground floor level including sales area, retail back of house and service areas as well as internal vehicular goods and delivery area accessed from Station Road and existing onto the proposed back street which runs perpendicular to Station Road and Adamstown Avenue; a multi-storey car park accessed from Station Road by ramp at ground floor level is at first, second and third floor levels; the multi-storey car park includes residential car parking spaces as well as spaces associated with the supermarket unit and other non-residential uses in the district centre; the third/top floor of the multi-storey car park will not be made available for car parking under this planning application as it is designed to cater for a subsequent phase of development, subject to a future planning application. The development provides a total of c.16,000sq.m of public realm including the creation of a new public square, internal streets and landscaping works; alterations to Station Road to include landscaping; reconfiguration of existing on street parking; insertion of raised table at station entrance; taxi set-down spaces and creation of 2 bus bays to the north and south of Station Road; creation of vehicular and pedestrian accesses to the site from Adamstown Avenue, Station Road and Adamstown Park; removal of 2 public/visitor car parking spaces along Adamstown Avenue proximate to Stratton Way to accommodate provision of a bus bay, together with provision of a bus bay on south side of Adamstown Avenue opposite; photovoltaic panels on the roofs of Block B and E; lift overruns and plant at roof levels; 534 car parking spaces to be provided through a mixture of on-street parking; podium parking under Blocks B ad E in the proposed multi-storey car park in the upper levels of Block F; the first and second floor levels of the multi-storey car park accommodate 448 car parking spaces in this phase; a total of 702 cycle parking spaces (271 stands/542 spaces within Blocks B and E and 80 stands/160 spaces in the public space) are provided throughout the development to cater for both residential and commercial uses; the 50 bike stands at Adamstown Station are to be maintained. The proposal also includes temporary landscaping and construction of temporary site hoarding and fencing in or around areas for future phases of development immediately adjacent to the development; all ancillary site development and landscape works on lands bounded generally by Adamstown Avenue, Adamstown Boulevard and the Stratton housing development to the north, by Station Road, Adamstown Train Station and the Dublin to Kildare railway line to the south, by Adamstown Park to the east and by currently undeveloped lands to be developed in a subsequent phase of development to the west; the application site incorporates elements of Adamstown Square and Adamstown Station Development areas with the Adamstown Strategic Development Zone and is being made in accordance with the Adamstown Planning Scheme 2014, as amended, and relates to a proposed development within the Adamstown Strategic Development Zone Planning Scheme Area, as defined by Statutory Instrument No. 272 of 2001.
Two storey extension to the rear of existing dwelling to include roof lights and all ancillary site works.
Demolition of the existing dwelling known as 'San Guida' (225sq.m), ancillary garage (25sq.m), outbuilding (31sq.m) and garden walls; construction of a part 3 to part 4 storey apartment development (1,837sq.m) comprising 21 units (6 one bedroom and 15 two bedroom apartments) all with associated balconies/terraces; widening of the existing vehicular entrance along 'New Road'; 21 car parking spaces; bicycle parking; bin store, boundary treatments; hard and soft landscaping; plant; green roof; sub-station; lighting; solar photovoltaic panels and all other associated site works above and below ground.
Amendments to parts of Blocks 4 & 7 of approved development PL06F.247787 / Reg. Ref. F15A/0565. This application is being lodged concurrently with a separate application which seeks to omit the remainder of the permitted mixed use block 4.The cumulative effect of both these applications will be to reduce the permitted 6644m² of commercial accommodation in Block 4 by 3029m² and to omit 2 no. 1 bed apartments and 9 no. 2 bed apartments in Block 4. The amendments sought in this application comprise the construction of a 3.5 storey mixed use block 4B to contain 4 no. commercial units totalling 618m² and 1 no. cafe of 109m² at ground floor with 11 no. 1 bed and 14 no. 2 bed apartments over with parking and amenity space to the rear accessed from Scholars Walk and facing onto Scholars Walk and the new pedestrian street, with revisions to the extent of permitted Scholars Square; the omission of the permitted public open space at Scholars Green and the circular road feature on Scholars Court; the construction of 22 no. 2 storey 3 bed houses and 1 no. 2 storey 4 bed house on lands fronting Norsemans Walk, Scholars Walk and Scholars Court; the omission of permitted three storey Block 7A containing 12 no. 2 bed apartments from its permitted location on Norsemans Walk and construction of a new three storey Block 7A containing 4 no. 2 bed apartments and 8 no. 3 bed 2 storey maisonettes along Loughcommon Lane, with revisions to the permitted parking layout, landscaping and amenity facilities in the courtyard serving Block 7A & 7B apartments, with courtyard access moving from Norsemans Walk to Loughcommon Lane; revisions to kerbside parking and landscaping along Norsemans Walk and Loughcommon Lane; ancillary minor amendments to associated landscaping, site works and infrastructure. This application abuts slightly the site area of application F19A/0454. Add Info received 27th January 2020. Add Info deemed Significant 29th January 2020. Revised Public Notices received 31st January 2020.
The demolition of an existing two-storey detached house and free-standing garage/outhouses, and construction of 22 residential units consisting of 18 two and three storey houses (1 detached, 14 semi-detached and 3 terraced) and 2 ground floor apartments, with 2 duplex apartments above, all on a 0.7 ha site at Garryowen, Carpenterstown Road, Carpenterstown, Dublin 15. The proposed units shall comprise: 3 x Type A & 6 x Type B, 4 - bedroom 3 storey houses, 4 x Type C & 5 x Type D, 3 Bedroom 2 storey houses and 2 x Type E, 3 storey Duplexes with one bedroom apartment at the ground floor level and 2 bedroom duplex type apartment above, together with foul pumping station, site development works, landscaping and connections to public services.