Planning records
Showing 1-3 of 3 public recordsPermission is sought for the temporary use of lands as a temporary ice rink utilising vehicular and pedestrian access at the south east corner of the site, provision of drop off facility and 98 no. car parking spaces, temporary provision of septic tank, on site generator and temporary connection to local water mains and ancillary works within a fenced area of approx. 0.85ha. The proposed development will consist of one stand-alone marquee structure of 45.00m by 60.00m. The temporary use will be operational from 28th October 2022 to 31st January 2023 and equivalent periods over the following two years within the temporary three year period sought. Site works including the erection and deconstruction of the proposed structure will occur in the two weeks before and after the period specified above. The hours of use of the proposed temporary facility will 10.00 to 22.00.
Permission is sought for lateral extensions of existing, single story, porch roof to front elevation, first floor side extension, and rear dormer window to loft conversion
Permission for development. The development will principally consist of the: demolition of the existing non-habitable outbuilding (44 sq m) and construction of a part four to five storey apartment block (4,022 sq m) over basement (2,072 sq m) comprising 37 No. apartments (4 No. 1 bed units, 31 No. 2 bed units and 2 No. 3 bed units) with balconies/terraces facing north, south, east and west and 21 No. two storey dwelling houses (17 No. 3 bed and 4 No. 4 bed units) ranging in size from 117.5 sq m to 142.7 sq m. The development will also comprise of: repositioning and upgrade of the existing entrance laneway between Fairholme and Craughwell to form access and egress to the development with an internal spur providing new access and egress to Craughwell; extinguishment of 1 No. existing access from Craughwell to Brighton Road; 100 No. car parking spaces (58 No. at basement level and 42 No. at grade level); bicycle parking, bin storage, plant and generator room all at basement level; substation; sedum roofs; solar photovoltaic panels; boundary treatments; lighting; hard and soft landscaping; changes in levels; and all other associated site works above and below ground.