  1. © OpenStreetMap
    25/6073Granted

    Ardnageehy, Ballyhay, Charleville, Co. Cork, P56Y036

    Permission for front and rear extensions and alterations to an existing dwelling house and Permission for 2 no. dormer style windows on the front elevation at first floor level.Decision record indexed
    Decision24 November 2025View record
  2. © OpenStreetMap
    23/6099Granted

    Fiddane, Cooliney Coolcaum, Ballynoran, Ballynadrideen Ardnageehy, Charleville Co. Cork

    The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.Decision record indexed
    Decision01 July 2024View record
  3. © OpenStreetMap
    21/7246Refused

    Annagh North, Coolcaum, Fiddane Cooliney, Rathnacally, Farranshonikeen Ardnageehy and Clashganniv Co. Cork

    The development will consist of:. Construction of 6 no. wind turbines with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m;. Construction of turbine foundations and crane pad hardstanding areas;. Construction of new site tracks and associated drainage infrastructure;. Upgrading of existing tracks and associated drainage infrastructure where necessary;. Upgrade of entrance onto local road L1322;. All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or upgrading of existing internal watercourse and drain crossings;. Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: - Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - Rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works.. 1 no temporary construction site compound and associated ancillary infrastructure including parking;. Tree felling to facilitate construction and operation of the proposed development;. Installation of medium voltage (20/33kV) and communication underground cabling between the proposed turbines and the proposed on-site substation and associated ancillary works;. Erection of 1 no. permanent meteorological mast with a height of 100m above ground level and associated access track;. Installation of medium voltage (38kV) underground cabling and associated ancillary works between the proposed on-site substation and the existing Charleville Substation within the townland of Rathnacally. The proposed grid connection will be installed primarily within the public road and will include 2 no. watercourse crossings and the installation of 8 no. pre-cast joint bays;. All associated site development works;. A 10 planning permission and 35 year operational life from the date of commissioning of the entire wind farm. This application for planning permission is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement.Grounds not yet categorised
    Decision22 December 2022View record
  4. © OpenStreetMap
    22/5792Granted

    Ardnageehy Charleville Co Cork

    (a) single storey tray store and fresh product dispatch building (b) two storey packaging room and packaging store (c) to demolish and relocate the existing single storey pallet store (d) to relocate the truck washing and sanitary pre-treatment systems (e) to modify the internal road layout. The existing development relates to an activity which requires an Integrated Pollution Control Licence.Decision record indexed
    Decision22 September 2022View record
  5. © OpenStreetMap
    22/4962Granted

    Ardnageehy Ballyhea Charleville Co.Cork

    Permission for the retention of existing extension to side of dwelling, and for existing storage sheds. Permission for the construction of pitched roof in place of existing flat roof and for extension to side of existing dwelling. also, permission for new septic tank and percolation area and all associated site worksDecision record indexed
    Decision03 August 2022View record
  6. © OpenStreetMap
    21/5141Refused

    Ardnageehy Ballyhea Ballyhay Charleville Co. Cork

    Retention of existing extension to side of dwelling, and for existing storage sheds. Permission for the construction of pitched roof in place of existing flat roof and for extension to side of existing dwelling. Also, permission for new septic tank and percolation area and all associated site works.Grounds not yet categorised
    Decision21 June 2021View record
  7. © OpenStreetMap
    20/4041Granted

    Townlands of Ballyroe, Dromin, Ballynadrideen Ardnageehy, Rathnacally and Clashganniv in Ballyhea Charleville, Co. Cork

    A 10 year planning permission for the development of a 102.76 hectare solar PV farm and 3.425 kilometre underground electricity grid connection (0.34 hectares) giving a total combined area for both the solar farm and underground grid connection of 103.1 hectares. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, together with 1 single storey ESB control room, 12 electrical transformation enclosures, underground cabling, inverters, CCTV poles and cameras, deer type security fencing, existing site entrance from the L5529 road, access tracks, hardstanding area, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. The proposed solar farm is located in the townlands of Ballyroe and Dromin, Ballyhea, Charleville, County Cork. The proposed underground electricity grid connection is to be installed entirely under public roads from the proposed solar farm at Ballyroe to Charleville 110kV ESB substation, which passes through the townlands of Ballyroe, Ballynadrideen, Ardnageehy, Rathnacally and Clashganniv in Ballyhea, Charleville, County Cork. A Natura Impact Statement will be submitted to the planning authority with this application.Decision record indexed
    Decision16 February 2021View record
  8. © OpenStreetMap
    19/6817Granted

    Ardglass, Fiddane Cooliney, Rathnacally Farranshonikeen, Ardnageehy Clashganniv, Co. Cork

    Consisting of: Installation of 4,387 metres of underground electricity cable between a proposed solar farm at Fiddane, Ballyhea, Charleville, Co. Cork and Charleville 110kV ESB Substation at Clashganniv, Ballyhea, Co. Cork to be installed entirely under public roads. The underground electricity cable passes through the townlands of Ardglass, Fiddane, Cooliney, Rathnacally, farranshonikeen, Ardnageehy and Clashganniv, County Cork. A Natura Impact Statement will be submitted to the Planning Authority with this application.Decision record indexed
    Decision11 November 2020View record