To retain boundary wall to side and rear and associated site clearance works and for permission for alterations to previously granted planning permission ref:20209. Alterations include revised site boundary's, revised site layout, increase in shed size and all associated site worksDecision record indexed
Construct a steel shed for the purpose of fabricating steel buildings with external portable toilet facility, use of existing entrance and all associated site works.Decision record indexed
1. retain existing steel shed for commercial user and for storage of agricultural machinery and 2. retain existing concrete front boundary wallDecision record indexed
Retain extension to original dwelling house and retain changes to window and door fenestration from that granted under the original planning permissionDecision record indexed
Ballaghmore, Borris in Ossary, Portlaoise Co. Laois
Make alterations to the front of our existing dwelling to include changes to existing windows and the removal of an existing porch canopy and the permission to construct a new porch to the front of the dwelling. To demolish the existing utility room at the rear of the dwelling and to include new windows and doors to the side and rear of the existing dwelling and all associated siteworksDecision record indexed
Construct new dwelling house, septic tank and percolation area, new site entrance, ancillary site services and all associated site worksDecision record indexed
BALLAGHMORE OLD NATIONAL SCHOOL, BALLAGHMORE, BORRIS-IN-OSSORY CO. LAOIS
1. Change use of the Old Ballaghmore National School to a Childcare Service 2. Install a modular childcare building on the site 3. Construct a single storey extension to connect the modular building to the existing building 4. Erect child safe fencing on the site and all associated ancillary site worksDecision record indexed
Board of Management of Gaelscoil Shlí Dála, Ballaghmore, Co. Laois
To 1/ Revision of site boundaries. 2/ Remove 3.No. existing pre-fabricated classrooms and outbuildings from site. 3/ Refurbish & relocate 2No. existing prefabricated classrooms. 4/ Construct 4No. additional prefabricated classrooms, 1No. activities hall, 2No. staff offices, 1No.staff canteen, toilets, circulation corridors, outdoor play areas, sensory playground and all ancillary facilities. 5/ Upgrade existing sewage treatment system and provision of underground fire water storage tank. 6/ Provision of additional car parking facilities and pedestrian access footpaths and all associated site worksDecision record indexed
Construct new single storey 4 bedroomed dwelling with new septic tank and percolation area system, new entrance, garage, and all associated site worksDecision record indexed
To extend and renovate existing cottage with new septic tank and percolation area system, upgraded entrance, and all associated site worksDecision record indexed
THE CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, INSTALLATION OF WASTE WATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
Retain the following: 1/ Material widening of an agricultural entrance and intensification of the use of the entrance for an agricultural business. 2/ 1No. Container for use as agricultural office and toilet and 2No. containers ancillary to the use of the previously approved Section 5 Mushroom Tunnel. 3/ Mobile septic tank and pump house and all ancillary worksDecision record indexed
Construct a new dwelling house, new domestic garage, new septic tank and percolation area, new site entrance and all associated site worksGrounds not yet categorised
Construct a new dwelling house, new domestic garage, new septic tank and percolation area, new site entrance and all associated site worksDecision record indexed
Retain an existing telecommunications support structure (previously granted under Plan. Ref. No. 09/641) together with associated ground equipment within a fenced compound and access track locatedDecision record indexed
Retain change of house design and position on site from previously approved Planning Ref. 21/58 and all associated and ancillary site worksDecision record indexed
Construct a proposed dormer dwelling house, garage, site entrance, wastewater treatment system & percolation area and to include all associated site worksDecision record indexed
Renovate an existing cottage dwelling. The proposal also involves the deconstruction of some existing outbuildings and the construction of a single storey proposed extension to the cottage within the same footprint of the deconstructed outbuildings. Along with all associated ancillary worksDecision record indexed
Construct a dormer bungalow dwelling, new site entrance, domestic garage, wastewater treatment system and all associated ancillary worksDecision record indexed
Cattle handling yard and cattle crush and all necessary site work which is adjoining the boundary wall which is within the curtilage of a protected structure Derryvale House RPS REF S152Decision record indexed
Construct a dry store, cattle handling facilities and effluent tank, improvements to existing entrance and new access lane, along with concrete yards and all ancillary worksDecision record indexed
A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommission of, a development consisting of a 142.7 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures, 34 no. electrical transformation enclosures, a temporary construction compound, underground cabling, inverters, CCTV poles and cameras, deer type security fencing around the site boundary, landscaping and biodiversity measures and all asscociated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will also be submitted to the Planning Authority in connection with this applicationDecision record indexed
Alterations/extensions to the existing Direct Provision Accommodation Centre to consist of a) a single-storey kitchen extension to the side of the existing building and b) a three-storey bedroom wing extension to the side of the existing building, comprising of 60 no. bedrooms, all with associated and ancillary site worksGrounds not yet categorised
CONSTRUCTION OF MILKING PARLOUR INCORPORATING DAIRY, PLANT, STORAGE, MEAL BIN, RAIN WATER STORAGE TANK, HOLDING YARD WITH CRUSH/ DRAFTING YARD, UNDERGROUND EFFLUENT TANK WITH FLOW CHANNEL AND ALL ASSOCIATED SITE WORKSDecision record indexed
Amendment to the design of the previously approved development (Planning Reference: Tipperary County Council 21261), which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development to include (1) slight increase in the height of the Solar PV panels, (2) slight increase in the bottom height of the Solar PV panels off the ground, (3) slight reduction in the spacing of Solar PV rows (strings), (4) slight decrease in size of solar panels, (5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and (6) an increase in the number of solar panels (A Natura Impact Statement will also be submitted)Decision record indexed
(1) construction of new extension to existing farm building for agricultural use, complete with associated site works and (2) construction of new slatted underground effluent storage tank within existing farm building for agricultural use, complete with associated site worksDecision record indexed
Development in peatland consisting of an access track measuring approximately 4.00m wide and 1.20km in overall length and concrete hardstanding measuring approx 97.00m in length and 26.00m in width (approximately 2,500sqm in overall area)Decision record indexed
The installation of a 34.11hectare/84.28 acre solar farm at lands known as Brehony's Bog, within the townland of Monaincha, Roscrea, Co. Tipperary (E: 616980, N: 687790 (ITM)). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures and will measure 2.00m in overall height. Ancillary development to the installation of solar PV panels includes 12no. transformers; 106no. pole-mounted CCTV cameras measuring 2.75m high; underground cabling; 3.80km (approx.) of fenceline measuring 2.00m at highest point; creation of new graded internal access tracks approximately 4.00m wide from two existing gated entrances on northern site boundary, each measuring 6.50m wide. A temporary compound measuring 5,000sqm will be established during the construction phase of the solar farm, whereupon the area will then be used for the siting of solar PV panels following the construction phase. The proposed solar farm will operate over a 40-year period, after which it will be decommissioned, with all associated lands returned to their original use. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning applicationDecision record indexed
Roscrea Business & Innovation Park, Benamore, Roscrea Co. Tipperary
Portal frame building for the storage, cleaning, reconditioning and recycling of IBC's and drums, storage yards, water collection and recycling tanks, site fencing, landscaping, solar panels, office and welfare facilities, parking and all associated site works - this application consists of a development for an activity for which a Waste Licence is required from the Environmental Protection AgencyDecision record indexed
Alterations to previously granted permission reference 2560129 including conversion of existing shed which was to be demolished into part of the proposed extension and all associated site worksDecision record indexed
Construct a two-storey dwelling, associated detached double garage, the opening of a new shared vehicular entrance to the site and right of way, new private water well and septic tank and percolation area together with all associated site development worksDecision record indexed
A change of use from current office use to light industrial use with associated offices to the existing detached outbuilding (Annex 2) and provision of an electric compressor to the front left of the property, which will be housed within a sound proofed enclosure. This (Annex 2) building is to the rear of Birchgrove House (recorded protected structure REF S94). No material changes to the existing building are proposed either internally or externallyDecision record indexed
The Sheehy and Monaincha Townlands, Roscrea, Co. Tipperary
The construction of a 4.00m wide access track, including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located (Grid Easting: 618575; Northing 686630 centre of application site. A Natura Impact Statement is submitted as part of the planning applicationDecision record indexed
Upgrading of septic tank, facilitating the removal of the existing Septic Tank, replaced with 3.3 Cubic meter capacity Waste Water Treatment Unit with Pump to 45 SQM area. Soil Polishing Filter, as a replacement to the existing Septic Tank and to include all associated site worksDecision record indexed
Construct a two-storey dwelling, the opening of a new shared vehicular entrance to the site and right of way, new private water well and septic tank and percolation area together with all associated site development worksDecision record indexed
A 36m high multi-user lattice tower telecommunications structure with headframe raised on a 1.2 m concrete plinth, carrying antenna and dishes enclosed with a 2.4 metre palisade fence compound with associated ground equipment and associated site works including new entrance and access trackDecision record indexed
A) Construct an agricultural straw bedded shed to house calves B) Construct roofless cubicles and slats over existing underground slurry tank C) Demolition of 2 bays of existing milking parlour D) Construction of new milking parlour and all associated site worksDecision record indexed
A) Retain dungstead B) Retain cow cubicle accommodation C) Retain of straw bedded calving shed D) Retain concrete slurry lagoon and all associated site worksDecision record indexed
A) construction of an agricultural straw bedded shed b) demolition of 2 bays of existing milking parlour c) construction of new milking parlour and all associated site worksDecision record indexed
(A) front porch as constructed, and (B) rear dormer conversion including an increased roof space as constructed, with all associated site worksDecision record indexed