  1. © OpenStreetMap
    23/5875Granted

    Ballintaggart & Ballybricken Ringaskiddy Co.Cork

    Permission for the construction of a guardhouse building and associated works, including; canopy, ramp, concrete plaza, local internal access road widening, fencing, external lighting, drainage and footpaths. An existing permitted storage shed will also be kept on site indefinitely (currently subject to permission to demolish as part of planning reference 20/5533). The proposed development is covered by an Industrial Emissions Directive Licence no. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accidents Regulations will be submitted with the applicationDecision record indexed
    Decision09 November 2023View record
  2. © OpenStreetMap
    20/5533Granted

    Ballintaggart Ringaskiddy Co. Cork

    A 10 year planning permission for the construction of a contractor’s compound, welfare facilities, an internal access road and associated works. The proposed compound will be built in the area previously occupied by the ADM waste water treatment plant, which is currently being demolished, Planning Ref. 18/6631 relates to this demolition. Part of the aeration basin tank walls which were to be demolished under Planning Ref. 18/6631 will now be retained as part of this proposed development. Enabling works will include the demolition of the former ADM workshop and stores (total floor area = 820m2 with an overall height of 8.12m): Demolition of this building was previously permitted as part of the expired planning application 12/5768, the relocation and grading of site – won material, the removal of 91 trees, protective fencing around trees that are to remain, and some other minor demolitions and alterations. The proposed development will include: A two-storey canteen and meeting rooms building (total floor area = 337m2 with an overall height of 6.45m); a toilet and shower building (total floor area = 202m2 with an overall height of 3.15m); an electrical sub-station ( total floor area = 56m2 with an overall height of 3.15m); a pickling shed (total floor area = 92m2 with an overall height of 4.74m); double-stacked temporary portable contractor cabin (total floor area = 808m2 with an overall height of 4.95m); steel gantry walkways and stairs: a workshop and storage containers area (total floor area = 1290m2 with an overall height of 2.45m); a waste and recycling area for accommodating skips; a laydown area; a new security building (total floor area = 66m2 with an overall height of 3.15m); new internal roads, footpaths and set-down area, relocation of existing car parking spaces and provision of an additional 20 parking spaces, new car park information sign board at the site entrance. The development will include all associated on-site infrastructure. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision04 December 2020View record
  3. © OpenStreetMap
    23/6129Granted

    Ballintaggart Ringaskiddy Co Cork

    Construction of 2 no. one storey modular buildings for office use and 2 no. storage containers to the north of the existing Operation Support Group Building including all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision11 December 2023View record
  4. © OpenStreetMap
    21/5402Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    1) The construction of an electrical building, 2) i) amendments to the footprint and elevations of the recently permitted water treatment and electrical building which was granted planning under Planning Ref. 20/05207, ii) the construction of a first floor electrical room extension to this permitted water treatment and electrical building. The proposed development is covered by an existing Industrial Pollution Control License No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision12 July 2021View record
  5. © OpenStreetMap
    23/5834Granted

    Ballintaggart & Ballybricken Ringaskiddy Co Cork

    Permission for construction of Bld. 124 - Site Lab Building. This will comprise a new five-storey building (circa 10,881 square metres with a maximum height of circa 30.2m above ground) which will include laboratories, a canteen, ancillary office space and plant and utility space, and associated site development works, including; roads, paths, yards, underground services and landscaping. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision02 November 2023View record
  6. © OpenStreetMap
    21/5132Granted

    The existing Pfizer site in Ballintaggart and Ballybricken Ringaskiddy Co. Cork

    A 10 year permission for the construction of a new Clinical Manufacturing Facility (referred to as RCMF) at the existing Pfizer site. The proposed RCMF facility will include (i) a new five storey clinical manufacturing building (c.11,468sqm and maximum height 29.425m) which will include production areas, laboratories, ancillary office space, warehouse, and plant and utility space. The building will be constructed in two sequential phases, Phase 1 comprising c.9,465 sqm and Phase 2 comprising c.2,003sqm; (ii) a single storey warehouse drum store building (c.420sqm and maximum height 13.00m); (iii) an external utility yard comprising; a two storey electrical building (c.94sqm and maximum height 11.70m), an emergency generator with flue stack, 1No. liquid nitrogen tank, 2No. evaporators, 3No. bunded chillers, 2No. bunded receiver tanks, 2No. bunded glycol tanks, a three storey steel frame structure (to a maximum height of 12.91m) to accommodate; dry coolers, heat exchangers and other miscellaneous utility plant and machinery above the utility yard; (iv) an elevated structural steel piperack (c.210m in length and maximum height 9.19m) to provide piped utility services to the new facility, and; (v) all associated site development works, including roads, paths, yards, underground services and landscaping. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (P0013-04). As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accident Regulations will be submitted with the application. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.Decision record indexed
    Decision22 June 2021View record
  7. © OpenStreetMap
    23/5195Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co Cork

    Installation of a Solar Photovoltaic (PV) Array (Proposed Area = 2403m2) on the upper level of an existing ground and first floor carpark building, construction of an extension to an existing electrical switch room located under the access ramp to the upper level of the carpark and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision04 August 2023View record
  8. © OpenStreetMap
    22/6672Granted

    Ballintaggart Shanbally Ringaskiddy Co.Cork

    The works will include the construction of a new electrical building, emergency back-up electrical power generation, an associated containment bund, screening and associated site development works including minor modifications to internal roads and drainage. The proposed development is covered by an external industrial emissions license no. P0864-01Decision record indexed
    Decision14 March 2023View record
  9. © OpenStreetMap
    20/4230Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    The erection of 1 no. one storey modular building for office use and 1 no. one storey modular building for welfare use in the existing recycle centre compound, 2 no. one storey modular buildings both for office use to the north and 1 no. one storey modular building for office use to the north west of the existing laboratory building and all associated site works at their production facility. The site currently operates under an Industrial Emissions (IE) licence (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
    Decision01 April 2020View record
  10. © OpenStreetMap
    24/5367Granted

    Ballintaggart Shanbally Ringaskiddy Co.Cork

    Permission for 1) The demolition of part section of the existing laboratory and existing carpark spaces, 2) The construction of a new four storey laboratory expansion to the south of the existing site buildings, new entrance canopy and associated site works. Permission for retention is sought to retain an existing single storey modular building to the east of the site for use as a wellness centre. The proposed development is covered by an existing Industrial Emissions Licence no. P0864-01.Decision record indexed
    Decision12 September 2024View record
  11. © OpenStreetMap
    20/6995Granted

    Pfizer AGI (Above Ground Installation) Pfizer Ballintaggart Ringaskiddy, Co. Cork

    Works involving the replacement of approximately 80m of existing 2.4m high chainlink fence and associated gates with new 2.4m high green palisade security fencing/gates and all associated works at an existing Above Ground Natural Gas Installation.Decision record indexed
    Decision17 February 2021View record
  12. © OpenStreetMap
    21/4631Granted

    Ballintaggart and Ballybricken townlands Ringaskiddy Co. Cork

    A 10 year planning permission to amend the recently permitted development for the construction of a contractor’s compound, welfare facilities, an internal access road and associated works, Ref: 20/5533. The amendments include adjusting internal access roads and associated works. The proposed amendments include relocating a section of road accessing the permitted contractors compound, construction of associated earth reinforced retaining walls, the working and grading of site-won material, the removal of 88 trees, replacement planting of 90 trees, the erection of protective fencing around trees that are to remain, and some other minor demolitions and alterations. The proposal includes the removal of 3 No. double-stacked temporary portable contractor cabins (total floor area removed = 192m2, overall height of 4.95m) and removal of a section of steel gantry walkways from the previously permitted contractors compound. The development will include all adjustments required to associated on-site infrastructure. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision31 May 2021View record
  13. © OpenStreetMap
    20/5207Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    The construction of a 1 storey water treatment & electrical building and a 2 storey electrical room extension to the existing finished goods building at the production facility. The site currently operates under an Industrial Emissions (IE) license (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
    Decision31 July 2020View record
  14. © OpenStreetMap
    23/5839Granted

    Ballintaggart Ringaskiddy Co Cork

    Permission for the construction of an extension to the existing roof level platform for 1 no. air handling unit and associated ductwork over the existing organic synthesis plant 1. The construction of a roof level platform for 5 no. air handling units and associated plant and ductwork over the existing organic synthesis plant 3 including 2 no. cladded screens at penthouse level, 2 no. cladded screens with louvres at roof level and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision06 November 2023View record
  15. © OpenStreetMap
    22/5541Granted

    Ballintaggart Townland Ringaskiddy Co.Cork

    (1) permission for retention of the following, (a) modifications to the elevations, (b) the extension of the goods lift to roof level including an external canopy at roof level, (c) the relocation of the firefighting stairs to the west of the existing building including signage on the western elevation, (d) an external access stairs from low level roof to high level roof, (e) additional production floor area of 139.5sq.m at ground floor mezzanine level, (f) additional production floor area of 621sq.m and 2 no. access platforms at second floor mezzanine level, (g) additional production floor area of 46.8 square metres at third floor level and (h) modifications to the location and size of the production stairs on the west & east side of the south side extension. This retention permission relates to the previously permitted New Product Technology Laboratory extension, planning ref. 18/7382. (2) Permission for the following, (a) the construction of a 4-storey production extension at ground floor level to the north & west with a ground floor and second floor mezzanine including a fire escape stairwell at the north west corner of this proposed extension. The proposed extension has a total floor area of 1,736 square metres. (b) additional plant room floor area of 166 square metres at third floor level and (c) the provision of roof mounted plant on the low-level roof area of the New Product Technology Laboratory building. The proposed development is covered by an existing Industrial Emissions Directive Licence no. P0013. As the development refers to a modification to an establishment to which the Major Accident Directives applies, information as specified in the third schedule of the major accident regulations will be submitted with the application.Decision record indexed
    Decision24 August 2022View record
  16. © OpenStreetMap
    24/4786Granted

    Ballintaggart Ringaskiddy Co.Cork

    Permission for the construction of a single storey electrical building and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-06. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision19 June 2024View record
  17. © OpenStreetMap
    24/5339Granted

    Barnahely Ringaskiddy Co.Cork

    Permission for retention of an ESB substation and generator in revised position to that permitted as per reg. ref 22/4629Decision record indexed
    Decision06 September 2024View record
  18. © OpenStreetMap
    22/4629Granted

    Barnahely Ringaskiddy Co. Cork

    The construction of a two storey value added seafood factory building with R&D and ancillary office accommodation to the first floor, complete with the following (i) signage (ii) car, cycle and motorcycle parking; (iii) internal access roadways, yard area with dock levellers, w.c. and shower facilities, back-up generators, and bunded fuel tanks (iv) fire water storage tank and associated pumps; (v) substation; (vi) security gates and fencing (vii) 1 no. access to the estate road; (viii) underground storm water attenuation, and all associated site development and landscaping works.Decision record indexed
    Decision05 August 2022View record
  19. © OpenStreetMap
    19/6818Granted

    Ballintaggart Ballybricken Ringaskiddy Co. Cork

    The construction of a one storey extension to the north east corner of the existing Drum Pad warehouse, minor elevation changes and all associated site works at the production facility. The site currently operates under an Industrial Emissions (IE) license (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (control of major accident hazards involving dangerous substances) regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
    Decision29 January 2020View record
  20. © OpenStreetMap
    21/5379Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    To construct a replacement end-of-line abatement unit, associated vent stack and ancillary works. The replacement end-of-line abatement unit will have a footprint of approximately 650m2 and a maximum height of 12.5m, whilst the associated vent stack will be approximately 32m in height above ground. Ancillary works include interconnecting pipework and the installation of three storage tanks. The proposed development is covered by an existing Industrial Emissions Directive License No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision13 July 2021View record
  21. © OpenStreetMap
    22/4295Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    Permission for (i) The retention of 2 no. one storey modular buildings for office use adjacent to the existing finished goods building, (ii) the construction of a two storey modular building for welfare use at ground floor level and office use at first floor level, to the north west of the existing warehouse building with enclosed stairway access to the first floor level, and (iii) all ancillary site development works at their production facility.The proposed development is covered by an existing Industrial Emissions Directive License No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.Decision record indexed
    Decision08 April 2022View record
  22. © OpenStreetMap
    23/5685Refused

    Ballintaggart Shanbally Ringaskiddy Co.Cork

    Permission for construction of a dwelling house and associated site worksGrounds not yet categorised
    Decision12 October 2023View record
  23. © OpenStreetMap
    25/6891Refused

    Ballintaggart, Shanbally, Ringaskiddy, Co. Cork.

    Permission for the construction of a dwellinghouse and associated site works.Grounds not yet categorised
    Decision23 February 2026View record
  24. © OpenStreetMap
    23/5371Granted

    Raffeen Sports and Social Club Ballintaggart & Shanbally Townlands Ringaskiddy Co.Cork

    Permission to remove an existing biocycle wastewater treatment unit and replace with a new waste water treatment unit and associated site works on their land at Raffeen Sports and Social Club, Ballintaggart & Shanbally Townlands, RingaskiddyDecision record indexed
    Decision24 August 2023View record
  25. © OpenStreetMap
    22/4747Granted

    Cúlán, Buncoille Monkstown (Castle Farm) Monkstown Co. Cork

    Retention of (a) sun room and entrance porch extension to front of dwellinghouse (b) utility room extension to rear of dwellinghouse (c) detached garden shed structure adjacent to south-western gable wall of dwellinghouse and (d) detached ancillary single-storey granny flat structure to rear of dwellinghouse together with all associated alterations and site works.Decision record indexed
    Decision19 July 2022View record
  26. © OpenStreetMap
    25/5876Refused

    The Former ADM Site, Ballybricken, Ringaskiddy, Co.Cork

    Permission for 1) change of use of 5 no. existing permitted storage tanks on site from the storage of molasses to the storage and distribution of HVO (Hydrogenated Vegetable Oil) fuel, 2) raising of bund wall by 250mm, 3) a new foul treatment system and 4) all other associated site development and drainage works. The development to be retained consists of 1) alterations to tank farm bund structures, 2) 2 no. bottom loading skid areas and gantry structures for the off-loading of fuel, 3) group of generators, battery storage and other plant structures, 4) construction of 2-storey facility building (GFA 53.4sqm) 5) and all assocaited site development and drainage works.Grounds not yet categorised
    Decision05 November 2025View record
  27. © OpenStreetMap
    24/4822Granted

    Barnahely Ringaskiddy Co Cork

    Permission for construction of a new bulk caustic tank and tanker loading area at existing bio-pharmaceutical manufacturing facility. The development will comprise: 1) construction of bulk caustic tank to a height of approximately 6.4m above the established ground level, a diameter of approximately 3m and capacity of approximately 30,000 litres to be positioned within a concrete bund providing 110% capacity of the tank and to include steel maintenance gentry stairs, control unit and associated equipment concrete plinths, 2) construction of a tanker loading area of approximately 180 sqm, 3) extension by approximately 12m of the adjacent existing high level pipe rack (approximate height of 7.4m) and 4) associated drainage works, pipe connections and internal road reinstatement. This application relates to development which comprises an activity which holds an Industrial Emissions Directive licence (Reg. No. P0778-02).Decision record indexed
    Decision01 July 2024View record
  28. © OpenStreetMap
    20/6419Granted

    Sicura Buncoille Monkstown Co. Cork

    (i) Retention of the existing boundary wall measuring between 1.20 metres to 1.30 metres in height adjacent to the southern site boundary of the residence, running parallel to the existing access lane to the south; (ii) retention of the existing retaining wall measuring approximately 2.50 metres in height, located within the south-western portion of the subject land-holding which encloses the existing storage area; and (iii) all associated site works.Decision record indexed
    Decision12 January 2021View record
  29. © OpenStreetMap
    24/5200Granted

    Buncoille Monkstown Co. Cork

    Permission to (a) Construct a new extension onto front, rear and side of existing dwelling house. (b) Construct a new porch and modify the existing windows. (c) Demolish the existing roof, modify, alter and extend the existing roof to incorporating same to existing dwelling house and to provide living accommodation at first floor level with all associated site services.Decision record indexed
    Decision10 March 2025View record
  30. © OpenStreetMap
    23/4278Granted

    Buncoille Monkstown Co.Cork

    Extensions and alterations to dwellinghouse to include, demolition of extension to front, construction of new first floor dormer roof extension for habitable purposes, extension to rear, subdivision of dwelling house into 2 no semi- detached dwellinghouses, placing of temporary mobile home on site and all associate site works.Decision record indexed
    Decision13 April 2023View record
  31. © OpenStreetMap
    21/6026Granted

    Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork

    I) Modifications to the north, south and east elevations of the existing Organic Synthesis Production Building No. 4 (referred to as OSP4), ii) the demolition of the cantilevered window on the eastern elevation at second floor level of the existing OSP4 Production Building, iii) the construction of a single storey electrical room and control room extension at second floor level to the east of the existing OSP4 Production Building and iv) all ancillary site development works, at their production facility. The proposed development is covered by an existing Integrated Pollution Control Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident Regulations applies.Decision record indexed
    Decision14 September 2021View record
  32. © OpenStreetMap
    21/5786Granted

    Barnahely Ringaskiddy Co. Cork

    The erection of 2No. temporary single storey modular buildings with a total gross floor area of c.504m2. The temporary buildings will be required for a maximum period of three years. The temporary buildings will comprise; (i) a gowning and locker building of c.276m2 and maximum height of c.4.15m connected to the northern end of the existing production building P02, and (ii) an office and break room building of c.228m2 and maximum height of c.4.15m connected by covered walkway to the southern end of the existing production building P02. The development will include local site works, footpaths and underground service connections. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg No.P0778-02)Decision record indexed
    Decision13 August 2021View record
  33. © OpenStreetMap
    22/6239Granted

    Ballintaggart & Ballybricken Townlands Ringaskiddy Co.Cork

    Permission for the construction of an electrical building and all ancillary site development works at their production facility at Ballintaggart and Ballybricken townlands, Ringaskiddy, Co.Cork. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accidents Regulations will be submitted along side the applicationDecision record indexed
    Decision28 November 2022View record
  34. © OpenStreetMap
    21/6432Granted

    Barnahely Ringaskiddy Co. Cork

    The construction of building extensions with a total gross floor area of c.2,734m2 at the existing facility. The building extensions will comprise; (i) a 2-storey extension to the west elevation of existing production building P02 of c.1,003m2 and maximum height of 22.2m; (ii) demolition of an existing single-storey entrance lobby and construction of a 2-storey extension to the east elevation of existing production building P02 of c.480m2 and maximum height of 12.2m; (iii) a single-storey in-fill extension to the north elevation of existing production building P02 of c.50m2 and maximum height of 8m; (iv) a single-storey break-room extension to the south elevation of existing Production Building P02 of c.316m2 and maximum height of 8.2m; (v) a single-storey extension to the north elevation of existing CUP Building of c.500m2 and maximum height of 14.2m; and (vi) a single-storey extension to the east elevation of the existing warehouse building of c.385m2 and maximum height of 18.2m. The development will include local site road, footpaths and underground service connections. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg No.P0778-02)Decision record indexed
    Decision28 October 2021View record
  35. © OpenStreetMap
    24/4187Granted

    Buncoille Monkstown Co. Cork

    1)Full planning permission for the construction of new dwellinghouse, new domestic garage, new double entrance off public laneway. 2) Permission for the retention of existing mobile home on a temporary basis, together with all other ancillary site works.Decision record indexed
    Decision27 May 2024View record
  36. © OpenStreetMap
    21/6106Granted

    Shanbally Ringaskiddy Co. Cork

    Decommission existing septic tank system and install a new treatment plant and soil polishing filter in its place to serve existing dwellinghouse (as currently being extended under Planning Ref. 20/4005).Decision record indexed
    Decision20 September 2021View record
  37. © OpenStreetMap
    20/4005Granted

    Shanbally Ringaskiddy Co. Cork

    Alterations and extensions to an existing dwelling, decommissioning of an existing septic tank, a new connection to the mains foul sewer on the public road and all other associated site works. Permission is further sought for retention of an existing temporary habitable structure (mobile home) on the site which is to be used by the applicant during the course of the proposed works and is to be removed on completion of same.Decision record indexed
    Decision11 February 2020View record
  38. © OpenStreetMap
    24/6460Granted

    Barnahely Ringaskiddy Co.Cork

    Permission for (i) Construction of a 2 no. storey extension to the west elevation of production building P01 comprising gross floor area of approximately 294sq.m with maximum height of 19.2m (to parapet) to facilitate installation of new equipment (parts washers and autoclaves) to replace end-of-life equipment. (ii) All associated site development works including adjustment to adjacent hard-standing and kerbing, repositioning of the existing Liquid Nitrogen Enclosure, provision of drainage and site service connections and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02)Decision record indexed
    Decision21 February 2025View record
  39. © OpenStreetMap
    24/5501Granted

    Barnahely Ringaskiddy Co Cork

    Modular buildings and structures comprising as follows: 1) Permanent retention of an existing 884sq.m temporary equipment store building and extension of the building by a further c.414 sqm, 2) Construction of a new single storey c.110 sq.m amenity building and a new single storey c.60 sq.m workshop building, both located at the site waste water treatment plant area, 3) Temporary continuation for a further 5 years of use of the existing 4 no. single storey, 360 sq.m pre-fabricated temporary modular office units permitted under planning references 16/07150 and 22/4608, 4) Temporary continuation for a further 5 years of use of existing 276 sq.m modular gowning and locker building permitted under planning reference 21/5786. This application relates to development which comprises activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02).Decision record indexed
    Decision01 October 2024View record
  40. © OpenStreetMap
    22/6653Granted

    Barnahely Ringaskiddy Co. Cork

    Permission for development at Barnahely, Ringaskiddy, Co. Cork. The development will consist of; 1 no. 2-storey extension, with a floor area of approximately 48.0 square meters and height to parapet of 8.2 meters, to the existing warehouse locker room previously permitted under Cork Council Reg. Ref. 06/7499. The development will include associated ancillary site works, connection to existing underground services and landscaping. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0778-02).Decision record indexed
    Decision31 January 2023View record
  41. © OpenStreetMap
    22/4608Granted

    Barnahely Ringaskiddy Co.Cork

    (i) 1 no. 3-storey office extension to the existing administration building with a floor area of approximately 2,721 square meters, an overall parapet height of 16.3 meters and connected by overhead passageway to the southern elevation of the administration building; (ii) temporary continuation for a further 2 years of use of the existing 4 no. single-storey, 360 square meter pre-fabricated temporary modular office units permitted under planning reference 16/07150; (iii) permanent continuation of use for the existing 95 no. car spaces temporarily permitted under reference 16/07150. The development will include associated works for local site roads, footpaths, connection to underground services, landscaping and site works. The proposed development is located on lands approximately 1.32 hectares within the existing permitted manufacturing campus. This application relates to development which comprises an activity which holds an industrial emissions directive licence (Reg. No. P0778-02)Decision record indexed
    Decision10 May 2022View record
  42. © OpenStreetMap
    24/4445Granted

    Ballybricken Ringaskiddy Co.Cork

    Permission is sought for the installation of three liquid storage tanks within an existing bunded area and all associated pipe works and site works at an existing tank farmDecision record indexed
    Decision08 May 2024View record
  43. © OpenStreetMap
    19/6995Granted

    The Lodge Ashleam Monkstown Co. Cork

    1. To demolish part of existing single storey extension at the rear of existing dwelling, 2. Replace existing lean to roof with a proposed flat roof at the rear of existing dwelling, 3. Construct a single storey extension at the side and rear of existing dwelling, 4. Alterations to existing elevations and all associated site works.Decision record indexed
    Decision06 August 2020View record
  44. © OpenStreetMap
    24/4910Granted

    Barnahely Ringaskiddy Co.Cork

    Permission for the construction of extensions to the canteen facilities at our existing bio-pharmaceuticals manufacturing facility. The proposed development will comprise: i) a c.93sqm single storey extension to the northern side of the existing canteen to facilitate additional seating, and ii) a c.90 sqm extension to the southern side of the canteen to facilitate additional kitchen space. This application relates to development which comprises an activity which holds an industrial emissions directive licence (reg. no. P0779-02)Decision record indexed
    Decision13 July 2024View record
  45. © OpenStreetMap
    22/4577Granted

    Ringaskiddy Deepwater Berth Ballybricken Ringaskiddy Co.Cork

    Removal of external inclined conveyer system to warehouse as permitted under Cork County planning Ref. 06/13900 and replacement with vertical elevator and associated pit and a horizontal enclosed conveyor with supporting bridge structure and all associated site worksDecision record indexed
    Decision11 July 2022View record
  46. © OpenStreetMap
    22/5854Granted

    Opposite Marian Terrace and to the rear and side of Merlyn House Shanbally Ringaskiddy Co Cork

    The demolition of existing derelict cottage and the construction of a residential development of 23 no. units comprising 1 no. 4-bed detached unit, 1 no. 5-bed detached unit, 4 no. 3-bed semi-detached units, 16 no. 4-bed semi-detached units, 1 no. 4-bed storey and a half detached unit, 46 no. car parking spaces, 1 no. new dedicated vehicular entrance, 1 no. new dedicated pedestrian entrance, and all other road, drainage and associated site development works.Decision record indexed
    Decision08 August 2023View record
  47. © OpenStreetMap
    25/4465Granted

    Shanbally Ringaskiddy Co Cork

    Permission for the construction of an all weather playing pitch (size 60 x 30m) (total site area 8,650m2) which will include:-1,035m2 stone carpark, access road and drop off area, perimeter fence of 2.4m metal mesh fence topped by 3.6m of ballstop netting, footpath surrounding the pitch, a 20m long x 5m high concrete hurling wall, 4 number 12m high LED double floodlighting columns for astro pitch, 10 no. 6m high street lighting, advertising banners, all associated site works including civil, electrical, drainage works.Decision record indexed
    Decision01 September 2025View record
  48. © OpenStreetMap
    25/4704Granted

    Barnahely Ringaskiddy Co.Cork

    Permission for an upgrade and extension to the existing biomedicines manufacturing facility, including: 1) construction of a part single-storey and part two-storey extension to the northern elevation of the existing production building P01 with total floorspace of c. 1,718 sqm and a maximum height of c23.01m, 2) construction of a new medium voltage and low voltage (MV &LV) electrical sub-station with 2 no. single storey over service void building units with total floorspace of c.346sqm and maximum height c.6.33m, and to include a back-up generator, 3) construction of an extension to the existing central utility plant (CUP) to accommodate new boiler, heat pumps and plant rooms with total floorspace of c.482sqm and maximum height to parapet, c.14.2m and to include demolition of an existing boiler house of 68.6sqm, 4) works to upgrade and expand the existing on-site Waste Water Treatment plant (WWTP) incorporating new plant and equipment for increased hydraulic and biological treatment capacity; including a new single storey electrical substation with total floorspace of c.233sqm and maximum height c.5.29m, back-up generator, cooling towers, and odour control unit, 5) all associated site development, landscaping and ancillary works including re-profiling of the earthen berms in the vicinity of the WWTP and associated demolition works, boundary fencing, underground services, high-level pipe and cable racks, internal site roads, yards and temporary construction compounds. This application relates to development, which comprises an activity, which holds an Industrial Emissions Directive Licence (reg. no. P0778-02). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the development.Decision record indexed
    Decision10 June 2025View record
  49. © OpenStreetMap
    21/6687Granted

    Shanbally Ringaskiddy Co. Cork

    Permission for 1 no. Dormer Bungalow.Decision record indexed
    Decision19 January 2022View record
  50. © OpenStreetMap
    25/4623Granted

    Bayview Lodge Strand Road Monkstown Co.Cork

    Permission for alterations & extension to dwelling house consisting of; a front porch extension, elevational changes & any associated site worksDecision record indexed
    Decision30 May 2025View record