Planning records
Showing 1-6 of 6 public recordsExtend the existing service workshop to provide additional service bays and covered secure parking.
The construction of a two storey stand-alone café/restaurant unit, with an overall height of c. 8m and a gross floor area of 441 sq.m, and associated ancillary drive thru lane, located to south of the permitted Apex Hub at Ballymount Industrial Estate (permitted under Reg. Ref.: SD22A/0099 as amended); The ancillary drive-thru lane, includes a canopy and service hatch on the northwestern elevation side of the unit, a height restrictor / entrance barrier on the access lane and a 3.5m wide drive-thru lane; The proposal includes associated drive-thru signage consisting of 1 no. directional sign, 1 no. order station, and 2 no. menu boards/advertisement signs and tenant signage on the southeastern, northeastern and northwestern elevations; The development includes associated soft and hard landscaping, associated outdoor seating area and external bin store for the proposed café/restaurant unit; The development includes a total of 19 no. car parking spaces including 4 no. EV spaces, 2 no. accessible spaces and 3 no. Staff parking spaces, waiting area, bin store and 10 no. cycle parking spaces; The development includes the repositioning of 2 no. permitted pedestrian crossing to the east of the site (permitted under Reg. Ref.: SD22A/0099); and All associated development. The proposed café/restaurant, with associated ancillary drive-thru lane, supersedes the permitted café unit on the subject site under Reg. Ref.: SD22A/0099.
Construction of 6 warehouse units with associated offices, associated signage for each unit, boundary treatment, associated drainage and ancillary siteworks.
Erection of 2 two storey industrial units adjacent to existing S1 unit comprising of warehouse, office and toilet at ground floor level and proposed storage to mezzanine floor level; alterations to external area/existing car park and all associated site works.
Extend the existing service workshop to provide additional service bays and covered secure parking.
Construction of a new industrial unit for storage and office purposes, the relocation of an existing fire escape door on existing Unit D1, and all associated site works.