Construction of new single storey extensions to front and rear of existing single storey dwelling, inclusion of new rooflights, alteration of fenestration, new landscaping and all ancillary works. This site is within the Monard Strategic Development Zone.Decision record indexed
A ground floor extension to the side (north-west) elevation of existing dwellinghouse together with alterations to include a new ground floor window to the front elevation, the demolition of the existing ground floor utility room structure to the rear, the blocking-up up of an existing external door and window and the provision of new patio doors to the rear kitchen together with all associated alterations and site works.Decision record indexed
A 10 year permission for a solar farm consisting of approximately 71,742 photovoltaic panels on ground mounted frames within a site area of 64.55ha, 9 no. single storey inverter/transformer stations, 1 no. single storey spare parts storage container, 1 no. 38kV substation compound with single storey substation building, 1 no. clear span bridge, upgrading of existing agricultural entrances, internal access tracks, security fencing, CCTV, landscaping and all associated development site worksDecision record indexed
Permission to construct an agricultural shed to include 2 no. stables and associated dry feed and machinery storage, upgrade existing agricultural entrance and associated site works.Decision record indexed
To erect a single storey extension and to make alterations including the demolition of the existing front porch and store/utility to the rear of their dwelling house. This is within the Monard Strategic Development Zone.Decision record indexed
The development will consist of the permission for alterations and construction of two storey extension to rear of existing dwelling and first floor extension over existing ground floor extension and associated site worksDecision record indexed
Demolition of a detached habitable house and the construction of a new dwelling house, waste water treatment plant and all associated site works.Decision record indexed
Permission for decommissioning of an existing septic tank serving a dwelling and putting in place a new waste water treatment system and soil polishing filter.Decision record indexed
A proposed saltbarn. The application will involve the construction of a 3-bay 1,223sqm salt barn and machinery store and all associated works. A Natura Impact statement has been submitted with the planning application.Decision record indexed
A) Demolition of 5 no. agricultural buildings. b) Construction of agricultural building to include cubicle & straw bedded livestock housing along with slatted slurry storage tanks. c) Construction of agricultural building to include milking parlour & associated facilities along with straw bedded livestock housing. d) Construction of silage pit, dungstead & apron. e) Construction of soiled water/parlour washings tank. f) Erection of 1 no. meal bin and 2 no. water storage tanks along with associated site works.Decision record indexed
Permission for Retention of two storey (dormer bungalow) rear extension, external store and all associated site works at an existing single storey dwelling.Decision record indexed
Retention of rear single storey extension as constructed, permission to construct a first floor extension to front, side and rear of existing dwelling and permission to alter existing site entrance all to an existing dwellinghouse.Decision record indexed
Permission to erect a 30 metre high lattice tower with antennas, dishes and associated telecommunications equipment, including equipment cabinets at ground level all enclosed by security fencing.Decision record indexed
North Esk Business Park Dunkettle Glanmire Co. Cork
To construct a new two storey building for office accommodation, staff facilities, parking, entrance off existing estate road and all ancillary site works.Decision record indexed
Proposed change of use/alterations of an existing pharmaceutical facility building to a data centre including ground and first floor extension to the existing building. The proposed development will include demolition of an existing storage shed, connection to existing mains services and provision of ancillary plant/services including 3 no. chillers, 1 no. fuel storage tank, 3 no. generators, 1 no. medium voltage electrical substation, and 3 no. switch rooms, together with all associated site works.Decision record indexed
The retention of the existing childcare facility which consists of 2 no. childcare buildings, a covered playroom, 2 no. external eco toilets, an outdoor classroom, an astro-turf play area and all ancillary siteworks. Futhermore planning permission is also sought to construct the following; 1) proposed covered play area, 2)Proposed sensory room, 3) widening of existing site entrance, 4) all ancillary site works.Decision record indexed
A 10-year permission and 40-year operation period for a Solar Farm and underground grid connection within an overall site area of 61.08 hectares. The solar farm consists of 330,200 square meters of solar photovoltaic panels on ground mounted steel frames; on-site electrical substation; electrical skids (containing inverters, transformers and switchgear); underground power and communication cables and ducts; boundary security fencing; new internal access tracks and associated drainage infrastructure; new site entrance to the L6965 local road; 10 no. CCTV/lighting posts and all associated site services and works. The development also includes underground grid connection, which is to be installed primarily within the L6965, L2951 and L2963 public roads, this includes the installation of 3 no. underground medium voltage electrical cables, 1 no. fibre communications cable, 2 no. joint bays and associated infrastructure to allow communications and connection between the proposed 38kV on-site substation and the Kilbarry 110kV Substation, Blackpool, Cork City. The total length of the cable is c.4,449m of which c.2,021m will be within the jurisdiction of Cork County Council and c.2,428m within the jurisdiction of Cork City Council. A concurrent planning application will be lodged with Cork City Council for the remainder of the underground cable along the public roads to allow connection to the Kilbarry 110kV Substation in Blackpool, Cork City under Section 34 of the Planning and Development Act 2000 (PDA)(as amended).Decision record indexed
Inchera AGI Wallingston Industrial Estate Little Island Co. Cork
The replacement of the current 2.4m high chainlink perimeter fence with a 2.4m high palisade fence. This includes the replacement of a 4m wide access gate located at entrance of the site as well as emergency exits located on the perimeter. Additionally, new single leaf access is to be installed adjacent to the main access gate.Decision record indexed
"Roseville" The Hermitage Sallybrook Glanmire, Co. Cork
Construction of single storey extension to south side of existing dwelling, alterations to existing elevations and associated site works. Extension of Duration of Permission granted under planning reference: 15/04740Decision record indexed
The removal of an existing steel frame and the construction of an unmanned fuel service station solely for the use of trucks consisting of 1) 1 no. diesel island dispensing diesel on each side; 2) the re-use of 2 no. existing above ground tanks for diesel storage; and 3) all associated ancillary development works including vehicular access, landscaping, drainage, plant and services area. Extension of Duration to Permission granted under Planning Ref. No. 18/6138Decision record indexed
Retention of the following items 1) a single storey extension & elevational alterations to an existing dwelling, 2) a detached granny flat & shed constructed on the site & 3) a revised location of the vehicular access to the site, all differing from that granted under S/348/89.Decision record indexed
1. Demolish single storey extension to rear. 2. Construct a two storey extension to side and rear of dwellinghouse. 3. Carry out alterations to front elevation of dwellinghouse together with all associated site works development works.Decision record indexed
Permission for alterations to the rear of the existing dwelling house. The proposed alterations comprise the replacement of 2 no. existing velux windows with 2 no. dormer type windows and all ancillary site works.Decision record indexed
The development will consist of permission to amend Condition No. 23 of Cork County Council Planning Register No. 25/05034 to allow construction to extend by one additional hour in the evenings, Monday to Friday, and by one additional hour in both the morning and afternoon on Saturdays. Site development and building works shall only be carried out between the hours of 08:00 to 19:00 Mondays to Fridays inclusive, between 08:00 to 14:00 on Saturdays and not at all on Sundays and Public Holidays. Deviation from these times shall only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. Reason: In order to safeguard the amenities of adjoining landuses. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, Reg. No. P1018-01.Decision record indexed
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as permitted by extant planning permission ref. 15/4926, extended by ref 20/5549 and amended by ref 23/5586. All demolition, site clearance, earthworks and formation for foundations will be complete under the current permission. The proposed plant will generate renewable biogas from 90,000 tonnes of non-hazardous biodegradable waste (‘Brown bin’ domestic and commercial waste) per annum utilising anaerobic digestion (AD) technology. It is proposed to upgrade the biogas to biomethane and inject it into the adjacent gas grid to replace fossil fuel derived natural gas. Other products from the process include digestate (a nutrient rich biofertilizer) as well as biogenic (natural) carbon dioxide. The proposed development will consist of the construction of: 1) main process building (c.3,762m2 gross floor area (GFA), max 14.5m high) incorporating feedstock reception and processing area, digestate treatment areas, dewatering and storage areas, quarantine areas, an odour control system and associated 25m high stack with signage on the south elevation. 2)Tank farm (c. 3,183m3 footprint, 4m high bund wall) encompassing a total of 6 tanks including four digestor tanks (20.15m max. height, c.3,400m3 capacity) a digestate storage tank (20.15m max. height, c.3,400m3 capacity), a suspension buffer tank ( 10.5m max.height, c.700m3 capacity (, an containerised desulphurisation plant and associated 2 tanks (14m max height, c120m3 capacity), 2 no. enclosed pump rooms (room no.1 -53.58m2 GFA and room no.2 – 23.69m2 GFA), and enclosed feedstock pump room (53.58m2 GFA and 3.6m high), 3 sediment settlement tanks (c.5.84(L), c.2.23m (W) & c.3.78(H) on a raised platform at 6m above ground level, stairwells, pumps, gantry walkways, 2 bund access stairs and tank emergency access ladders; 3) A biogas upgrade plant and gas entry unit; 1 no. containerised Combined Heat and Power (CHP) 1.5MW unit with an associated 28m high stack, a carbon dioxide liquefaction plant, a biogas holder (10.56 max. height, c.2,000m3) with 4 no. c.13.12m high lightning rods, a 9.26m gas flare, a containerised boiler with 10m stack, a transformer station, a propane storage tank, an emergency generator, 2 no. weighbridges, weighbridge office (c.17.2m2 GFA and 4.55m high), a fire water tank (c.1,000m3 and 14.12m high), a bunded vehicle refuelling area with a fuel storage tank (2.5m3) and a wheel wash, 4) Administration building (c.393.25m2 GFA) and a workshop (c.70m2 GFA), 5) 31 car parking spaces (including 2 electric vehicle charging points and a universal parking space), 2 motorcycle parking spaces and a covered bicycle rack; 6) Boundary treatment including 2.4m high perimeter fencing (mix of mesh wire fencing and acoustic fencing), access gates on the south western and north eastern boundaries; and 7) all ancillary site development works and services including landscaping, lighting, 2 no. directional signs, service yard area and internal circulation routes, pipe bridge, footpath and all site drainage works. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, reg. no. P1018-01. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application.Decision record indexed
Construction of a renewable bioenergy plant to generate up to 4MW of electricity from 90,000 tonnes of non-hazardous biodegradable waste per annum utilising anaerobic digestion (AD) technology on a 2.01 hectares site. The proposed plant will comprise the following elements: (1) Demolition of the existing decommissioned waste water treatment plant and associated ancillary buildings and the existing utility building located on the east side of the site (c.1425sqm footprint); (2) Main processing building (c.4500sqm floor area up to 14.5m high) incorporating feedstock reception and processing areas, digestate treatment areas, dewatering and storage areas, quarantine areas and the odour control system (c. 12m high, 773sqm floor area) and 25m high stack; (3) Service yard area including 2no. weighbridges, weighbridge office (c.435m high and 17sqm floor area), 2no. car parking spaces, bunded vehicle refuelling area (c.56sqm floor area) with diesel storage tank (2500 litres), workshop (c. 7m high and c. 70sqm floor area), and 1no. wheel wash; (4) Tank farm (c.2900sqm footprint) encompassing 4no. digester tanks (up to 25.5m max. height, c. 5000 metres cubed), 4no. grit removal buffer tanks (up to 24m max. height, c. 630 metres cubed), 2no. post-digestion buffer tanks (up to 24m max. height, c. 630 metres cubed) and 2no. pasteurisation tanks (up to 19m max. height, c. 217metres cubed), 2no. post pasteurisation and sludge storage tanks (up to 24m max. height, c. 630 metres cubed), 1no. process water tank (up to 25.5m max. height, c. 1280 metres cubed), 1no. concentrate tank (up to 10m max. height, c. 240 metres cubed), 4no. chemical storage tanks (up to 5m max. height, c. 48.1 metres cubed), total 20no. tanks in the tank farm, to include a stairwell tower (up to 25m max. height), gantry walkways, 3m high bund wall, 2no. bund access stairs, and 6no. tank emergency access ladders; (5) 2no. enclosed Combined Heat and Power (CHP) 2MW engines (c. 3.6m high and c.66sqm floor area each), 28m high CHP stack, c.14m high gas storage dome (1800 metres cubed) with 4no. lightning rod electrodes (c.18m high), 8.2m high biogas flare stack, gas treatment equipment enclosed in a c.1.8m high container (c.31sqm floor area) containing a gas booster and dryer and a c.2.5m high container (c.79sqm floor area) containing a boiler, 10m high boiler stack, 3no. bunded electrical transformers (c.5m high with 1m high bund wall and c.117sqm floor area), c.3.0m high substation (c.70sqm floDecision record indexed
Inchera Industrial Estate Inchera Little Island Co. Cork
Replacement of existing 60m3 external dry goods storage silo, with 120m3 external dry goods storage silo, with external maintenance access stairway. This development is within a site to which the Major Accident Directive applies. No alteration to the existing Integrated Pollution Prevention and Control (IPPC) license is required.Decision record indexed
Permission for an amendment to the permission granted under ref.15/4926 as extended by ref 20/5549 for renewable bioenergy plant. The amendment consists of: 1) omission of one permitted combined heat and power (CHP) enclosure to reduce the CHP capacity from 4MW to 1MW, 2) replacement of the CHP capacity by installation of a biogas upgrade unit to generate renewable gas from biogas, 3) installation of a gas grid entry unit to facilitate the export of renewable gas to the national gas grid, 4) installation of a carbon capture and storage unit to take the carbon dioxide stream from the biogas with associated tank and filling area to facilitate off-site export for use in industry, 5) amendments to the permitted tank farm to; a) reduce the number of tanks from the permitted 16 process tanks to 9 process tanks. All tanks will remain within the max permitted capacity and height. b) reduce the footprint of the tank farm and increase the bund wall height by 1.3m, 6)ancillary development works include installation of pipe runs, reorganisation of permitted car parking layout, relocation of a weighbridge, relocation of permitted boiler and stack and biogas holder, all to facilitate the proposed amendments. The proposed development is wholly within the permitted site boundary and relates to changes confined to the east of the site covering an area of approximately 0.7ha. The application relates to development which comprises or is for the purpose of an activity requiring an industrial emissions directive licence issued by the environmental protection agency reg no. P1018-01.Decision record indexed
Permission to construct a dwelling house, proprietary treatment plant and associated site works. This application is in conjunction with a simultaneous application to cork city council for the change of use of existing agricultural entrance permitted by Cork county Council (ref no. 19/5427) to agricultural and domestic use and associated site worksGrounds not yet categorised
Little Island Industrial Estate Wallingstown Little Island Co.Cork
Permission for the construction of an extension to the existing fire water retention pond and all associated site works. A Natura Impact Statement has been prepared and is included in the application. The Establishment holds an industrial emissions licence and is regulated by the environmental protection agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.Decision record indexed
Father Matthew Tower Kilcoolishal Glanmire Co. Cork
Alteration works to existing dwelling at Father Matthew Tower, a Protected Structure (RPS 00492), comprising of substantial demolition of existing dormer 1.5 storey over basement building adjoined to existing tower and construction of slated roofed building with 2-storey and single storey elements, with all associated ancillary and site works.Decision record indexed
Father Matthew Tower Kilcoolishal Glanmire Co. Cork, T45V663
Permission for: 1) Partial demolition of the existing roof and stone wall to the rear of the existing dwelling attached to Father Matthew Tower, a Protected Structure, No. 00492, and demolition of the existing entrances to the dwelling and balcony. 2) Construction of single storey extensions to the rear and basement, new entrances, new balcony, a new extended raised ridge pitch roof with 3 No. dormers and flat roof, and an outdoor terrace on existing flat roof. 3) Change of use of the existing garage to habitable rooms, namely to bedroom and gym. 4) Alterations to the existing elevations, and all associated site works.Decision record indexed
Permission to demolish existing single storey dwelling, construct new two storey dwelling in its place, new sewerage system to replace existing septic tank, new site entrance to provide improved sightlines, and all associated works.Decision record indexed
A)The demolition of a 6.3 sq.m modular type environmental monitoring building, b) the construction of a 47.8 sq.m single storey cylinder charging building, c) the construction of a 9 sq.m single storey environmental monitoring building and d) all associated site works. The site currently operates under an Industrial Emissions (IE) licence (PO 136-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
Little Island AGI (Above Ground Installation) Wallingstown (Townland) Little Island Co. Cork
The replacement of approximately 197m of existing 2.4m high chainlink fencing and associated gates with 197m of new 2.4m high green palisade security fencing/gates and all associated works.Decision record indexed
The construction of additional carpark spaces adjacent to existing car park including lighting and all associated works. The proposed development is for modifications to an establishment to which Major Accident Directive applies.Decision record indexed
An increase in operation hours of playschool from 9:00am to 12:00pm (permitted under planning grant 07/13385) to 9.00am to 12.30pm.Decision record indexed
Permission for the construction of a dwelling house with an attached carport, a waste water treatment system & all other associated site works. Access to the proposed site is via existing vehicular entrance from the public road & a right-of-way along an existing private access laneway as previously granted under planning reference 18/5554.Decision record indexed