Planning records
Showing 1-4 of 4 public recordsFor the construction of a one bedroom apartment including alteration and extension of existing building, alterations to elevational treatment of existing apartment No. 2 & reduction of rear yard of apartment No. 3. Also for construction of new gate to rear common area, & private yard for proposed apartment including connections to services & all ancillary site works
For development at Newmarket-on-Fergus Wastewater Treatment Plant in the townland of Boheraroan, Newmarket-on-Fergus, Co. Clare and an associated rising main traversing the townlands of Ballyconneely, Ballynacragga, Boheraroan, Dromoland, Latoon North, Latoon South, Manusmore, Newmarket and Rathfolan, County Clare. The development will compromise proposed works within the existing Newmarket-on-Fergus Wastewater Treatment Plant, including: a. 1 No. 7.8m high storm storage tank with minimum storage capacity of 516m3, measuring approximately 11m diameter. Between 3.6m - 5.0m will be above ground level, the remainder will be buried below ground level b. New below-ground discharge pumping station with associated below-ground valve chambers and wet well c. New 4.1m high tertiary treatment system (including 2 No. tertiary filter units and flocculation tank with a volume of 8m3) d. 2 No. 2.7m high chemical storage tanks (each with a volume of 7.5m3) e. Electrical control kiosk (6.4m L x 5.2m W x 2.5m H) f. Standby generator g. Diversion of the flows from the existing final effluent pump chamber via 110m of 300mm external diameter sewer to the new discharge pumping station. The proposed development will also include: h. Construction of approximately 4.4km of 400mm diameter outfall rising main from the proposed pumping station to the proposed outfall diffuser within the River Rine i. An outfall diffuser with three diffuser heads of 225mm diameter located within the River Rine foreshore j. All ancillary works site development works including site preparation works, hardstanding, site clearance, ground levelling and site drainage as required to facilitate the development. This application is accompanied by a Natura Impact Statement (NIS).
For development which will consist of (1) The demolition of existing on site storage buildings (2) The construction of a new single storey dwelling house, temporary septic tank, ancillary site works and connection to public services
Proposes to carry out the following development. The construction of a new housing estate development consisting of: a. 18 no. residential units comprising of: (1) 4 no. 1-bedroom apartments, i.e. Type A (2) 12 no. 2-bedroom apartments, i.e. Type B (3) 2 no. 3-bedroom apartments, i.e. Type C b. 27 ancillary car parking spaces within the development. c. The construction of pedestrian access point to the site. d. New Vehicular access point to the site. e. Connection to main sewer and watermain. f. Alterations to ground levels to accommodate the development. g. Surface water management will include attenuation and discharge to surface water network. h. All ancillary site works to include boundary and landscaping works. In accordance with the Habits Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.