  1. © OpenStreetMap
    SD24A/0183WGranted

    Cheeverstown townland, Fortunestown, Tallaght, Dublin 24

    The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.Decision record indexed
    Decision12 September 2024View record
  2. © OpenStreetMap
    SD23A/0343Granted

    Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24

    New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.Decision record indexed
    Decision03 May 2024View record
  3. © OpenStreetMap
    SD15A/0127/FEP2Refused

    Citywest, Tallaght, Dublin 24

    A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.Grounds not yet categorised
    Decision12 March 2024View record
  4. © OpenStreetMap
    SD23A/0265Granted

    Cheeverstown & Whitehall Townlands, Fortunestown, Tallaght, Dublin 24

    The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement truck wash out facility (1,237 sq. metres); and related ancillary works within a 4.2 hectare application area at the existing quarry. The new concrete plant will replace the three existing concrete plants on site, all of which will be decommissioned upon commencement of operation of the new plant.Decision record indexed
    Decision11 December 2023View record
  5. © OpenStreetMap
    SD15A/0127/FEPGranted

    Citywest, Tallaght, Dublin 24

    A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.Decision record indexed
    Decision28 November 2023View record
  6. © OpenStreetMap
    SD21A/0343Granted

    Belgard Townland, Fortunestown, Tallaght, Dublin 24

    2 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry.Decision record indexed
    Decision17 February 2022View record
  7. © OpenStreetMap
    SD21A/0012Granted

    Buckandhounds, Bedlesshill, Kingswood, Brownsbarn, Cheeverstown & Belgard, Fortunestown, Tallaght, Dublin 24

    Deepening of part (c. 43ha.) of the existing and permitted quarry (An Bord Pleanala refs. 301177 & QD0026) to a quarry floor level of -10mOD using conventional blasting techniques; use of mobile processing plant; product stockpiles; final restoration scheme and all ancillary works within a planning application area of 49.4ha and within the overall landholding of 241.6ha and will be accompanied by an Environmental Impact Assessment Report (EIAR).Decision record indexed
    Decision23 March 2021View record
  8. © OpenStreetMap
    SD15A/0127/EPGranted

    Citywest, Tallaght, Dublin 24

    A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.Decision record indexed
    Decision01 July 2020View record
  9. © OpenStreetMap
    SD20A/0040Granted

    Unit 11, Fortunestown Shopping Centre, Maplewood Road, Springfield, Tallaght, Dublin 24

    Retemtiomn of change of use from retail to food takeaway.Decision record indexed
    Decision29 April 2020View record