Planning records
Showing 1-50 of 29,885 public recordsConversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Attic conversion to bedroom with dormer window to rear roof plane and 2 rooflights to front roof plane.
Retention to change from part use of the house to the entire use of the house for a child care centre.
Retention planning permission for single storey extension to side if existing house, detached single storey garden room/shed to rear garden all with associated ancillary works.
Retention of single storey extension to front, side and rear of existing house, extension with new utility, bedroom and games/storage room; all associated site works.
Remove section of existing grass margin and extend existing concrete apron, install accessible kerb, relocate existing litter bin and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre.
2 storey modular classroom building and a single storey toilet building, steel framed covered walkway structure linking to the existing school, relocation of existing bicycle shelters and all associated site development works.
Remove section of existing grass margin and extend existing concrete apron, extend existing accessible kerb to end of concrete apron and erect a proposed new stainless steel and glass bus shelter, 2.5m x 1.85 x 2.8m high on the public footpath with 2 No. LED illuminated advertising panels each of 2.0 square metre area
The construction of a new single storey extension to the side of the existing house to facilitate family flat
The development will consist of works located outside the Clonburris SDZ relating to the "Stage 2" roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) in respect of the northern part of the overall Clonburris SDZ lands comprising: A) The construction/upgrade of an underground surface water pipe from Griffeen Avenue along Griffeen Road to connect to the existing surface water pipe along with the upgrade of existing surface water pipe along Griffeen Glen Drive and adjoining open space area (for c. 450m), which will connect ultimately to the Griffeen River. B) Junction upgrade and junction tie in works to existing road layout at Balgaddy Road and Grange Castle Road, C) Junction upgrade and junction tie in works to existing road layout at Thomas Omer Way/Ninth Lock Road, Fonthill Road (R113), including slip road to the north; D) Junction upgrade and junction tie in works to existing road layout at Ninth Lock Road/Neilstown Road. E) The proposals will also entail the restoration of the open space areas and road surfaces and all associated site development and associated landscape works.
Install a new LPG Safety Installation in a caged enclosure 1.8m x 1.2m x 1.2m (LxWxH) servicing the existing LPG storage installation with all ancillary services and associated site works.
Construction of a fully serviced single storey, dormer-style detached house in the existing front garden; new boundary walls and separate vehicle entrance.; connection to County Council foul and surface water and all ancillary site works.
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
The development will consist of conversion of existing attic with dormer extension to the rear, also one new Velux roof window to the rear.
Construction of single storey extensions to rear and side of existing dwelling; new detached domestic shed to side of dwelling; all associated site works.
The development which is in a strategic development zone will consist of removing section of grass margin extend existing concrete apron, install accessible kerb, relocate existing litter bin, and erect a proposed new stainless steel and glass bus shelter, 5.2 m x 1.85 m x 2.8 m high on public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
Temporary staff car parking of c.0.13ha. to accommodate 35 staff car parking spaces and associated site works while the Phase 1 Griffeen Valley ETNS building is being remediated. This temporary staff car parking will be located on a site measuring 2.32 ha. overall.
A 3 storey, 1,000 pupil post primary school (Roll no. 76454S) including a 4 classroom Special Educational Needs Unit with a gross floor area of 11,443sq.m including sports hall and all ancillary teacher & pupil facilities; bicycle parking; staff parking; vehicle drop off/set down areas; internal access roads; hard and soft play areas; piped infrastructure and ducting; plant; landscaping and boundary treatments; PV panels; external courtyards; disabled car parking spaces; ESB substation, ramps & stairs; signage; changes in level and all associated site development and excavation works above and below ground all on a site bounded to the east by the R136 Outer Ring, to the north by the existing site adjacent to south of Griffeen Avenue, to the west to existing site adjacent to Lucan East Educate Together National School and to the south to existing site adjacent to Adamstown Link Road. The proposed development is located within the Clonburris Strategic Development Zone Planning Scheme 2019 area.
First Floor Internal Alterations. Hip build up into dutch hip with window in gable wall at attic level, Attic conversion &1 no rooflight on rear slope of roof at attic level
Conversion of existing attic space comprising modification of existing roof structure; raising existing gable c/w window and 'Dutch' hip; new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure; raise gable c/w window and 'Dutch' hip; new access stairs and flat roof dormer to the rear.
Proposed 38m2 flat roof ancillary garden studio located to infill irregular space at rear (western side) of existing garden along with associated siteworks
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Conversion of existing attic space comprising of modification of existing roof structure, raising existing gable, c/w window and Dutch hip, new access stairs and flat dormer to the rear.
Construction of semidetached 2 storey 3 bedroom dwelling with habitable attic room, with dormer roof window on rear slope of roof,with new driveway and partial dishing of kerb & all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access Stairs, and flat roof dormer to the rear
Sub-division of existing site to allow for the construction of a new 2 storey, 3 bedroom detached dwelling with a pedestrian access gate in the side boundary wall, all to the side of the existing dwelling and all associated site works.
Conversion of attic space comprising of modification of roof structure; raise gable c/w window and 'Dutch' hip; access stairs and flat roof dormer to the rear.
Conversion of an existing attic to non-habitable storage use; removal of existing hip roof to half 'Dutch' hip to side; provision of dormer to rear.
Retention permission consists of the construction of a canopy structure to the west of the main school building.
Retention of construction of canopy structure to the west of the main school building.
Conversion of existing attic with dormer extension to rear, also two new velux roof windows, one on hipped side roof and one to rear roof. New garden walls to front and side of front garden.
Conversion of existing attic to non-habitable storage use; remodel of existing hip roof to half 'Dutch' hip to the side; provision for dormer to the rear.
The development will consist of the construction of a dormer window in the main roof to the rear of the property all associated site works.
Construction of a single storey porch to the front of the existing dwelling and all associated site works.
Demolition of the existing rear extension and canopy and the construction of a single storey extension to the rear and a two storey extension to the front and side of the existing house; one rooflight to the proposed single storey extension; the construction of one dormer window to the rear of the main roof slope of the existing house; 2 rooflights to the front main roof slope; construction of single storey porch to the front; all associated elevational changes including alterations to existing window opes; and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip, new access stairs and flat roof dormer to the rear.
A) The construction of a single storey detached ancillary garden building to rear garden together with associated landscaping and site works B) Retention of a timber boundary fence.
Remove section of existing grass margin and replace with a concrete apron, install accessible kerb and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath 21.0 metres east of existing bus stop pole with 2 no. LED illuminated advertising panels each of 2.0 square metre area.
Addition of two windows in the south facing gable elevation (one at ground floor and one at first floor level).
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
The proposed development will consist of the subdivision of existing retail unit, Unit 1 (101.9 sqm), into two separate retail units, unit 1A (29.6sqm), and Unit 1B (72.3 sqm), and all associated site services and development works.
Attic conversion to storage space to include the following: main hipped roof design changed to a gable style roof with a small 'Dutch' hip design, 5 roof lights incorporated on the main roof structure of the rear elevation, new gable wall constructed with matching materials to that of the main house.
Change of roof profile from hip end profile to Dutch Hip profile attic conversion incorporating dormer extension to rear 1 No 'Velux' roof light to the front All associated site works.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs and flat roof dormer to the rear.
Cairn Homes Properties Limited, intend to apply for permission for development at this site of c.5 ha at Development Area 6 Kishoge Urban Centre, sub sector KUC-S4 (including an area of Development Area 9 Kishoge South East, sub sector KSE-S1), Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. the development will consist of the removal of existing hardstanding and the construction of a mixed-use development arranged in 11 no. blocks, ranging between 3 & 7 storeys, comprising: 495 no. residential units, including 449 no. apartments (216 no. 1 bed units, 46 no. 2 bed 3 person units, 187 no. 2 bed 4 person units and 46 no. duplex units (22 no. 2 bed 4 person units and 24 no. 3 bedroom units), arranged across Blocks A-F; 2,502 sq.m of retail floorspace, including 1 no. large 2 storey retail unit (over an undercroft car park) and 2no. independent retail units at ground floor of Block B; 4,607 sq.m of employment floorspace within a 6 storey building and 2 no. independent employment units at ground floor of Block B and a bike hub, located at ground floor of the employment building; 483 sq.m creche, located at ground floor level of Block E; and 87 sq.m cafe, located within the employment building. Vehicular access to the site will be from the Clonburris Southern Link Street(as permitted by Reg. Ref. SDZ20A/0021). The development will also consist of the provision of public open space, including an urban plaza; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, wetland feature, play areas; signage; basement car park (Blocks B-C); undercroft parking (Blocks A, D and retail box) and surface car parking (403 no. spaces in total, including car sharing and accessible spaces; motorcycle parking; electric vehicle charging points); bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including green roofs); open attenuation pons; sustainability measures; signage; public lighting; and all site development and excavation works above and below ground.
Building 4 larger houses (than the previous application), 4 houses - 2x2 storey and 2x2 storey dormer houses, with associated parking and private open space etc.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip new access stairs and flat roof dormer to the rear.
The development will consist of amendments to a permitted development (Reg. Ref. SDZ23A/0043), comprising: • Alterations to the apartment unit typologies in Blocks B, C, E and F, includin g associated internal layout adjustments and external modifications across all floor levels of each apartment building; • Provision of a shared basement beneath Blocks E and F, including a ramped access, comprising additional car parking spaces, bicycle parking, storage, and circulation areas; • A single-storey extension at roof level on the southern part of Block E, resulting in a 6 storey building; • A single storey extension at roof level on the northern part of Block F, resulting in a part 6, part 7 storey building, with a pitched roof element to the south; • Alterations to the basement level of Blocks B and C, including reconfiguration of car parking spaces, bicycle parking storage, plant areas and ESB substation; • A single storey extension at roof level on the southern part of Block B, resulting in a 6 storey building, with pitched roof element to the south-west; • The provision of an additional pitched roof element to the south-east of Block C; • Alterations to the crèche at ground floor level within Block E, including modifications to the associated outdoor amenity area; and • Extension of the central urban plaza northward, resulting in the removal of private vehicular access to the south of Blocks B and C. The development will also consist of: alterations to the landscaping strategy, including modifications to the urban plaza and communal open space areas associated with Blocks B, C, E and F; minor alterations to the surface car parking areas; relocation and configuration of surface level bicycle parking and waste storage areas; and all associated site development and excavation works above and below ground. The proposed amendments will result in a reduction in the total number of units from 495 no. to 494 no. units, with a revised residential mix comprising 142 no. 1-bed units, 2 no. 2-bed (3 person) units, 326 no. 2-bed (4 person) units and 24 no. 3-bed units. Additionally, there will be an increase in overall car parking provision from 398 no. to 514 no. spaces (basement and surface parking) and a minor increase in the total gross floor area from c. 48,771 sq. m to c. 52,523 sq. m.