1) to extend existing watermain network 2) Permission for Retention of a borehole/well, ancillary infrastructure and all associated site worksGrounds not yet categorised
A two storey extension to existing farmhouse dwelling including new wastewater treatment system and demolition of existing extension and associated development worksDecision record indexed
To retain permission for (1) existing garage as well as planning permission for a proposed extension to an existing house and all associated site development worksDecision record indexed
An All-Weather Horse Race Track integrated around the existing turf track to include: new 2.2km long sand based track ranging in width from 14-18m including 3 furlong sprint chute extension, 3.2m wide Gallop inc. all assoc. site infrastructure such as railings, start locations and other ancillary infrastructure, new Underpass to All Weather and Turf Track, surface water drainage system to new track inc. storm water attenuation pond and storm water retention pond located inside the existing turf track, attenuation pond to the NW of the new all-weather track, modifications to existing turf track to facilitate new track, dedicated 3.0 to 3.5m wide circulation track to perimeter of new track for movement of emergency and service vehicles, new underpass for movement of vehicles from outer to inner track areas, treatment and upgrade to existing site boundaries, demolition of existing stable block (60 stables) and erection of new stable blocks comprising of 82 stables and assoc. works, demolition of Ancillary Building of 18m2, removal of existing parade ring (1,265m2) and construction of new parade ring (1,565m2) and assoc. works, demolition of maintenance shed of 180m2 and construction of new maintenance shed of 360m2, provision of 1No. permanent fixed steel tower of 10m in height together with 7 no. of vehicle hardstands to facilitate televisions and communications requirements, new LED floodlighting ranging in height from 12 to 34m to full perimeter of new track and assoc. cabling/ducting, new LED lighting to proposed stable block and adjacent areas, new ESB infrastructure inc. MV / LV Substation, MV Switch Room, Transformer Room and LV Switch room, consolidation of existing 4No. vehicular access points from the N24 into 3No. access points and internal modifications to carpark and internal circulation routes, proposed surface water drainage to new All Weather Track including culverting and/or diverting of existing watercourses, water ring main and assoc. hydrants to facilitate watering of the existing turf track served by proposed new well inc. submersible pump chamber and above ground control kiosk, landscaping including hedgerow and tree removal, decommissioning existing foul treatment system and new connection to IW infrastructure, new signage at site boundary along the N24 and all assoc. site works including security offices, fencing, embankments, ducting and site services. The planning application is accompanied by a Natura lmpact StatementDecision record indexed
A single storey sun-room extension at rear of previously permitted two storey extension which is at the rear of the original house; one velux style roof window in south-west facing roof slope; one additional velux style roof window in south-east facing roof slope; and all associated site and ancillary worksDecision record indexed
(i) Milking parlour incorporating dairy, plant, storage, meal bin, rain water storage tank, milk silo, holding yard with crush / drafting yard, underground effluent tank with flow channel (ii) Cubicle shed with underground effluent tanks (iii) roof over existing roof less cubicles (iv) Walled silage pits and all associated site works. Permission for Retention of roofless cubicles with underground effluent tank is also requiredDecision record indexed
The extension and renovation of an existing dwelling, permission to demolish back porch and to demolish stone wall linking dwelling to domestic garage and RETENTION PERMISSION to retain extension to rear of dwelling and to retain domestic garage and storage shed and associated site worksDecision record indexed
Monard National Shool, Solohead, Monard Co. Tipperary
A) proposed new single storey extension to existing school building, b) associated alterations to existing school building external elevations to accommodate proposed new extension and internal layout, c) all associated site works (the development is located within the curtilage of a recorded protected structure S1110 Monard NS (boundary walls))Decision record indexed
The extension and renovation of an existing dwelling and permission to demolish existing sun room and shed and for all associated site worksDecision record indexed
(i) single storey building for use as car valet (50 sq.m), (ii) single storey storage building (118 sq.m), (iii) relocation of totem sign, (iv) alterations to forecourt layout and associated site works and Permission for (i) change of use of existing convenience shop to include part off-licence use (area of off-licence use 22 sq.m), (ii) single storey retail building (247 sq.m) and all associated site worksDecision record indexed
1) Demolish existing walls and outhouses on site; 2) Demolish extension to the rear of existing dwelling house; 3) Construct a single storey extension to the rear of existing dwelling house; 4) Renovation works to existing dwelling house; 5) Construct new domestic garage; 6) All associated site worksDecision record indexed
The removal of the existing metal storage containers, construction of a permanent single storey detached flat roofed modular building comprising of open plan and cellular offices with ancillary welfare facilities and connection to the existing surface water and foul waste underground drainage system on the site of a Protected Structure (NIAH Reg No22205813 and Tipperary County Council Record of protected Structures No TRPS1899)Decision record indexed
The upgrade of the Limerick Junction Wastewater Treatment Plant and will generally comprise the following: construction of a storm water holding tank complete with cleaning system and access stairs and return pumping station; construction of a new sludge drying reed beds; sludge pump station; final effluent wash water pump station; control kiosk; and all ancillary site developments worksDecision record indexed
(a) the construction of an all weather playing pitch (b) associated fencing and lighting (c) and including all associated site development worksDecision record indexed
1. a hurling wall with astroturf area and perimeter fencing 2. an exercise footpath around the perimeter of the pitch with light standards 3. all associated site worksDecision record indexed
(a) Decommission 2 no. existing slurry lagoons and a dungstead, (b) Construct an extension to the side of existing cubicle shed with new underground slatted slurry storage tanks, (c) Demolish existing straw bedded shed and construct a new calving shed in place of it, (d) Construct a new roofed; drafting & handling area adjacent to existing milking parlour, extended collecting yard and an underground slatted soiled water tank and all associated siteworksDecision record indexed
Solohead Farm, Knockaneduff, Donohill County Tipperary
The demolition of a straw bedded shed, construction of single storey calving shed with underground slurry storage tank, the construction of single storey milking parlour shed with underground slurry storage tank, yard area including base and above ground effluent storage tank, 2 no. silage pits, proposed dungstead and bale storage area and associated site works including proposed effluent drainage network, surface water management drainage network and all ancillary site worksDecision record indexed
A vehicular entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site worksDecision record indexed
The demolition of some remaining old house walls and the construction of a dwelling house, wastewater treatment system, amendments to existing field entrance with all ancillary site worksDecision record indexed
Demolition of existing kitchen and Permission to extend and renovate our dwelling and also for Permission to replace existing septic tank with waste water treatment system and soil polishing filter and associated site worksDecision record indexed
The demolition of the existing dwelling house and domestic garage, construction of a replacement bungalow dwlling and domestic garage, replacement of existing septic tank with new waste water treatment system and soil polishing filter together with all associated site worksDecision record indexed
The proposed decommissioning of an existing septic tank and the proposed installation of a new wastewater treatment system and sand polishing filter percolation area and all associated site worksDecision record indexed
The construction of a 24 metre high free standing communication structure with associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband networkDecision record indexed
Extension to the side of existing cottage and to replace the existing septic tank with a new wastewater treatment tank and percolation system and to include all ancillary worksDecision record indexed
(1) domestic extension to the rear of my dwelling (2) windows to the original dwelling structure (3) and including all associated site worksDecision record indexed
(a) Retention of existing milking parlour, dairy and calving shed (b) Retention of extended cubicle shed (c) Permission to construct a calf rearing shed (d) Permission to construct 2 no. silage pits and a dungstead (e) Permission to construct underground slatted slurry storage tanks with a roofed feeding passage overhead (f) Permission for a new drafting and handling area adjacent to existing milking parlour, extended collecting yard and an underground slatted soiled water tank and all associated siteworksDecision record indexed
Demolished cottage and permission to erect in its place a dormer type bungalow with effluent treatment tank and percolation system and all associated ancillary worksDecision record indexed
Demolition of existing single-storey dwelling and outbuilding and construction of a new one and a half storey, part single-storey dwelling, with separate garage, photovoltaic solar panels, septic tank and raised percolation area, new vehicular entrance and associated site boundary and site development worksDecision record indexed
Extra floor area to family room, elevational changes to dwelling house and timber post and rail fence to existing site entrance with all ancillary site worksDecision record indexed
The demolition of existing out buildings and the construction of a new outbuilding attached to rear of existing garage with all ancillary site worksDecision record indexed
(1) amendments to existing agricultural/residential entrance and roadside boundaries which shall result in the formation of a combined residential and agriculture entrance. (2) the construction of an agricultural driveway which will link to an existing agricultural driveway and all associated site worksDecision record indexed
Construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m high poles, electrical and communications cabling, palisade security fencing and all ancillary works, this proposed extension development will be connected to an existing permitted solar development under planning application ref: PL 22/165 by underground cables - A Natura Impact Statement will accompany the planning applicationDecision record indexed
Change to fenestration on all elevations of the house; alteration of roof over former workshop at north end of the house; change of external wall finish at former workshop at north end of the house; erection of domestic storage shed; increase in size of commercial workshop, adjustment of fenestration on all elevations & concrete hardstanding to side; replacement of septic tank system and all associated site and ancillary worksDecision record indexed
A single storey dwelling, site entrance, wastewater system and raised polishing filter, rainwater harvesting system, separate garage and all associated site worksDecision record indexed
Kyleagarry Kyle Ballyryan East and Gortdrum, Donohill, Co. Tipperary
The construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 haGrounds not yet categorised
Extension and renovate existing dwelling and Permission to install waste water treatment system and soil polishing filter and associated site worksDecision record indexed