Showing 1-6 of 6 public recordsConstruction and operation of an aggregate processing plant to produce construction-grade sand and gravel from quarry fines / screenings generated by extraction activities at the surrounding quarry complex (previously approved under Planning Ref. FW12A/0022). AI Rcvd 20/1/2025
We Rathdrinagh Land Unlimited Company (Trading as Irish Recycling LTD) intend to apply to the aforementioned Planning Authority for permission for development on lands at Huntstown Townland and Coldwinters Townland, Co Dublin. The development will consist of the construction of a Materials Recovery Facility along with a Food Container Cleaning Plant. The development is phase one of the Huntstown Circular Economy Hub and will include for the following works: 1. The development will consist of the erection 2no. separate buildings and associated site area for use as a Circular Economy Hub. 2. The processes to be carried out within the Materials Recovery Facility building include for the sorting of range of wastes into recoverable and recyclable streams. Recoverable wastes to processed will include for potential recyclables. This building will include for an external odour control plant with associated flue. 3. The processes to be carried out in the Food Container Cleaning Plant building will provide a centralised washing/sterilisation facility for large food retailers in the area to facilitate re-use of containers. 4. The 2no. buildings to be constructed wil incorporate ancillary office and staff facilities along with solar PV panels and signage. 5. The development of associated access roads, turning/loading areas, footways, parking areas, electric vehicle charge points, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 6. The provision of an ESB substation. 7. The provision of ancillary external storage areas. 8. The reprofiling of existing ground levels within the site and associated works to include for infilling and reprofiling of lands within the overall site area. 9. The provision of a new site entrance with associated works to facilitate vehicular and pedestrian access along with associated upgrade works to the adjacent public road to include for provision of footpaths and cycle paths. 10. The provision of a weighbridge and associated staff building at the entrance. 11 The provision of perimeter fencing and security gates. 12. The provision of all associated hard and soft landscaping works. 13. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass petrol interceptor. 14. All ancillary site development, landscaping and construction works to facilitate foul; water and service networks. The Materials Recovery Facility will require an EPA Industrial Emissions Licence. An Environmental Impact Assessment Report (EIAR) has been prepared and accompanies this application. AI Rcvd 18/12/23
The development comprises the construction and operation of 3 no weighbridges (each with a dedicated weighbridge office), a new 2,160m2 soil waste inspection and quarantine shed, new site offices and associated parking facilities. The development will facilitate internal re-routing of soil intake for future backfilling and restoration of Huntstown South Quarry (previously approved under planning permission Ref. FW12A/0022). AI received 20/02/23.
The proposed development will consist of an extension to the existing access road as previously permitted under Reg. Ref. FW19A/0226. Provision is also made for a roundabout junction at the eastern end of the new road. The planning application area is c. 1.8 hectares. The development includes for pedestrian footpath and cycle-path links from the existing road; provision of all associated trunk utility services shall be provided to serve the adjacent development lands to include surface water drainage infrastructure, foul water drainage infrastructure, watermains, public lighting and associated ancillary works. The proposed development also includes for a single storey security booth (c.22.9m² and a max height of 3.6m); associated security barriers; and 4 no. parking spaces (1 no. being a disabled parking bay). This infrastructure may be removed prior to or upon the road being taking in charge by Fingal County Council. The new section of the road will provide access to existing lands zoned as Heavy Industry (HI) in the current Fingal County Development Plan 2017-2023. The H1 zoned lands which the new access road will service, will be the subject of separate planning applications for development(s) at future dates.
The proposed development, within the previously permitted application areas of planning ref's FW17A/0152 and FW19A/0226, will consist of temporary security controls adjacent to the Kilshane Road (L3120) and Cappagh Road (L3080) roundabout junction at the entrance to Huntstown Estate. The development within an application area of c.0.08 hectares includes for 6 no. retractable electric security bollards within the road carriageway; 8 no. demountable bollards between the footpaths/cycle-paths/grass verges; and 1 no. set of temporary automatic security gates (height c. 2.4m) located within the road carriageway.
Proposed development will consist of an extension to the site access road off the existing roundabout aqt the jct of the Kilshane Rd (L3120) & Cappagh Rd (L3080) as previously permitted under P. Ref. FW17A/0152. The new section of road will provide access to service the existing lands zoned as Heavy Industry. Provision of piers, access gates and signage.