Dormer window to the front and rear elevations to accomodate an attic conversion to existing dwelling, retain and complete garage / shed to the rear of existing dwelling and associated ancillary worksDecision record indexed
Side and rear extension, new septic tank and treatment plant and alterations to elevations of existing dwelling and all ancillary worksDecision record indexed
Of ground floor kitchen extension along with first floor ensuite bedroom and full planning permission to construct dormer to the rear to service aforementioned bedroomDecision record indexed
Alterations to dwelling to include replacement front porch and conversion of attic space, construction of a dormer roof window including associated site worksDecision record indexed
Height, door and window alterations to part of existing shed. Retention permission sought for portacabin. Planning permission sought to renovate and extend existing house to west and east, along with all associated site works. Permission sought for proposed new waste water treatment system with percolation area, along with all associated site worksDecision record indexed
The extensions to the side and rear of the existing dwelling and PERMISSION for a new extension to the side and rear of the existing dwelling and all associated site worksDecision record indexed
NENAGH ORMOND RUGBY FOOTBALL CLUB, TYONE THURLES ROAD NENAGH, COUNTY TIPPERARY
(i)Construction of All-weather playing pitch 120mx75m to replace existing grass training area (ii)Construction of All-weather surface 50mx40m to replace existing grass junior members training area. (iii)Alteration of Site boundaries to the North -East and South East (iv)Construction of Foot paths and Fencing around All weather Playing surfaces. (v)Fencing and planting or amended site boundaryDecision record indexed
1. Change of use of portion of existing storage shed to club gym; 2. External signage to side of gym & storage shed; 3. 2 no additional floodlights servicing 4G pitch to rear and Planning Permission to extend above mentioned storage shed and club gym to include additional dressing rooms, referee room and treatment room with showers and toilet facilities along with external signage to side of proposed extensionDecision record indexed
Cunnahurt East & Cunnahurt West, Nenagh, Co. Tipperary
Unauthorised development comprising a) extension to existing building, b) additional cement silo and c) concrete base to water re-cycling tank and Permission to complete a) water re-cycling tank and b) extension of concrete yard surface incorporating extended site boundariesDecision record indexed
Cunnahurt East and Cunnahurt West, Nenagh, Co. Tipperary
(a) de-commissioning and removal of existing concrete batching plant, (b) erection of new concrete batching plant, (c) extension of existing manufacturing plant including alterations to front elevation and partial increase in roof height, (d) demolition of existing office building, (e) change of use of existing private dwelling house to use as offices and (f) all associated siteworksDecision record indexed
(a)Refurbishment/Alterations to Existing Two storey detached dwelling, (b)New single storey extensions to Side South-West/ Rear North-East Elevations of existing dwelling, (c)Replacement of existing septic tank and percolation area with new Treatment system & percolation Area, (d)All associated site works/servicesDecision record indexed
1. Domestic garage on site, 2. extension to side of existing dwelling and 3. minor modifications to rear elevation from that granted under PL ref 08520009Decision record indexed
The renovation and extension of existing house, demolition of the shed to rear and construction of a garage, and RETENTION Permission for relocation of entranceDecision record indexed
The addition of a 51m2 single storey summer house structure with ancillary patio space to the rear of the existing dwelling and adjoining an existing outbuildingDecision record indexed
Alterations to existing dwelling to include 1. Changes to elevations 2. Extension to the rear 3. New entrance and closing of existing entrance 4. Provision of new treatment plant and percolation area 5. and all ancillary worksDecision record indexed
The construction of (1) a porch at the front entrance, (2) a canopy over side door at front, (3) a bay window to kitchen at ground floor to rear with balcony over, (4) replacement of window with door to side elevation, (5) replacement of first floor window with double doors onto balcony to rear elevation, (6) replacement of all uPVC windows to the front elevation with timber sliding sash windows, and (7) a storage shed within the farmyard of an existing dwelling - the proposed development is within the curtilage of a protected structure (No. 646 as identified in the North Tipperary County Register of Protected Structures)Decision record indexed
An extension to dwelling and outbuildings as constructed comprising a garage, a garden shed and a fuel store including all associated site worksDecision record indexed
Construction of additional bulk milk storage and pasteurisation unit, underground waste water tanks and PERMISSION for RETENTION of existing agricultural storage unit and all associated site worksDecision record indexed
Demolition of existing kitchen and outbuildings, construction of new single-storey extension to existing dwelling, renovations & alterations to existing dwelling, construction of new domestic garage, provision of new septic tank and percolation area and all associated site worksDecision record indexed
Modifications and alterations to dwellinghouse to include internal alterations, revised elevations and the construction of 4 dormers and a rooflight. Planning permission is also sought for the construction of a detached fuel shed and stores, alltogether with all associated worksDecision record indexed
Demolition of elements of the industrial building and construction of extensions to adapt the existing factory unit for film production. Permission is sought for demolition of: 1. The offices located to the front of the factory building 2. Factory structure sections on the South East and North West side and other sections of the factory building extending above the general factory roofline 3. Pallet storage shed. Permission is sought for: 1. Construction of new 2-storey offices to the front of the factory building 2. 2-Storey replacement extension for actor preparation and dressing areas to the centre Northwest side of the existing factory 3. Extensions to the Northeast side of the factory accomodating 3 film sound stages 4. Advertising signage 5. Upgraded elevation treatments 6. Landscaping and boundary treatments 7. ESB Substation and switchrooms, solar panels, all associated site works 8. General site access improvements into the site from the Lisbunny Industrial Estate road including construction of footpaths and cycle paths, modified vehicular entrances to revised car park with security control cabin (entrance 1), to actor preparation area (entrance 2) and to truck entrance and associated parking area (entrance 3)Decision record indexed
Former Rorer Building, Lisbunny Industrial Estate, Lisbunny
The subdivision and change of use of portion of the former Rorer Factory unit for use as a community building to be operated by the A-team. Permission is also sought for internal alteration of the building, the provision of signage on the building, new pedestrian access gate from the public footpath along the Dublin road and covered bicycle storage areaDecision record indexed
The construction of 5 detached commercial buildings as follows: 1 no. aircraft engine maintenance building with associated office space, 1 no. aircraft engine storage facility with associated office space, 3 no. detached warehouse buildings, detached ESB substation, detached security hut, associated car and bicycle parking, internal road network together with connection to the existing business park roadway, site fencing and boundary treatment, connection to foul and storm sewers, connection to watermain and necessary services together with all associated incidental and site worksDecision record indexed
A division of the existing site into two parts, a new three bedroom two storey detached house and new shared vehicular access and amended road frontage to improve sight lines and all ancillary site worksDecision record indexed
(a) construction of new first floor area to incorporate proposed offices, training room, storage areas with associated ancillary areas, (b) installation of new external windows to elevations to serve proposed first floor development, (c) construction of new dock leveller access with associated works to location of existing roller shutter door on south west elevation of existing building, (d) Retention Permission for existing signage and elevational changes with all associated site works and existing connection to all public utilitiesDecision record indexed
Nenagh General Hospital, Tyone Road, Nenagh Co. Tipperary
A new energy centre building, generator and fuel storage compounds to the existing services. Works to include the following; (a) the demolition of the existing diesel storage tank and associated concrete bund, removal of existing electrical generator, and associated fencing to the generator compound; (b) a proposed new secured fuel storage compound with associated stone faced walls and new self-bunded fuel storage tank; (c) a proposed new single storey energy centre building containing a new LV switch room, a new transformer room, a new RMU and a new ESB substation; (d) a proposed 2 no. freestanding electrical generators within a new generator compound with an associated timber fence; (e) alterations to the existing site to include for repositioned accessible parking, ramps, footpaths, and landscaping; (f) and all ancillary site works both above and below ground. This is a protected structureDecision record indexed
First floor conversion works carried out when development granted permission under pl. ref. PLC/11871 were completed and also retention of storage sheds and garage as constructedDecision record indexed
The erection of agricultural structure, to include cubicle housing, milking parlour/dairy and ancillary facilities with effluent storage tank and all associated site worksDecision record indexed
Unit 21 Lisbunny Industrial Estate, Lisbunny Nenagh, Co Tipperary
Construction of a proposed extension with a floor area of 2,786 Sq. meters to N/E of the existing industrial unit, inclusive of car parking, disabled car parking, covered bicycle parking, proposed new entrance, including services and all other associated site worksDecision record indexed
The construction of 67 no. residential units, a new single storey crèche, single storey health centre and a 3 storey, 90 bed nursing home. The residential units will consist of: 5 no. 1-bed semi-detached bungalows, 5 no. 2 bed semi-detached bungalows, 13 no. 2 bed mid-terrace bungalows, 2 no. 2 storey 4-bed semi-detached houses, 2 no. 2 storey 4-bed mid terrace houses, 14 no. 2 storey 3 bed semi-detached houses, 14 no. 2 storey 2 bed mid-terrace houses and 1 no. apartment building consisting of: 8 no. 1-bed apartments and 4 no. 2-bed apartments over 2 storeys, located as follows, (2 no. 2 bed and 4 no. 1 bed apartments on ground floor, 2 no. 2 bed and 4 no. 1 bed apartments on first floor), the proposed development will also include new internal roadways and footpaths, a proposed new distributor road to the north and east of proposed development, pedestrian/cycle access off the existing Tyone Road to the west of the site, vehicular access from the existing Ormond Drive, south of proposed site, new vehicular and pedestrian access, new boundary treatments, landscaping, drainage, site services including new ESB Medium Voltage (MV) substation building and all ancillary site worksDecision record indexed
Tyone adjacent to the Abbey Court Hotel, Dublin Road, Nenagh Co. Tipperary
The division and alteration of two existing three-storey houses to form two no. two-bedroom apartments at ground floor level and two no. duplex three-bedroom units at first and second floor levels, (four units in total) including access stairs from the ground floor, proposed alterations of rear elevations to include forming new door openings and closing other existing opes, proposed subdivision of existing rear gardens, proposed access road and car-parking spaces, new boundary walls with gates, hard and soft landscaping, external lighting and associated site worksDecision record indexed