Planning records
Showing 1-50 of 4,186 public recordsPermission for development at a c. 0.016 ha site in the service yard of Millfield Shopping Centre, Balbriggan, Co. Dublin. The development will consist of the construction of a sheltered canopy (c.101 sq.m) over 3 no. dedicated van parking spaces in the existing service yard and all ancillary site services and site development works.
Retention of single storey domestic shed and all associated site works.
Permission for demolition of the existing derelict bungalow and associated out buildings at Clonard Road, Balbriggan, Co Dublin (Eircode K32 YK29) and construction of 2 no. two storey with developed roof space terraces fronting onto Hampton Gardens Drive comprising 22no. residential units (11 no. 2 bed duplex units over 11 no. 1 bed ground floor apartments. Private amenity space is proposed to rear (east) of the units at ground floor level and projecting balconies at first floor level. Communal amenity space is also provided to the rear (east) at ground floor level. Car parking, consisting of one car parking space per unit, is located to the front (west) of the proposed 2 no. blocks of units. Permission is also sought for bin storage areas, hard and soft landscaping, cycle parking boundary treatments and all associated site development and infrastructure works forming the completion of the Hampton Gardens development. Add Info received 1st February 2021. Add Info deemed Significant 8th February 2021. Revised Public Notices received 19th February 2021.
The amalgamation of retails units 23-27 (inclusive) into a single retail unit with a single point of entry and exit onto the Upper Mall. Add Info received 15th June 2020.
The development will consist of the construction of a new veterinary clinic joining 2 nos. vacant retail units, installation of 2 nos. signs to the front elevation of the existing units, and associated site works. Additional Information Received 06/03/2026
Permission is sought for a detatched dormer bungalow on site to side of existing dwelling, utilising the existing vehicular entrance & all associated siteworks. AI received 17/05/21 SAI received 01/06/21
Retenion is sought for as-constructed vehicular entrance, fence & gates.
Attic development to include removal of existing hipped section of roof, construction of a raised gable end, with new flat roof type dormer extension & window to rear, 1 Nr. rooflight to rear, installation of new window to side and associated site works.
The development will consist of the construction of a new vehicular entrance, gates and fence to serve a residential property.
Planning permission is requested for conversion and extension of existing garage into a family flat along with alterations and extension to existing dwellinghouse to interconnect with the family flat and assoicated siteworks. AI received 22/3/2022
Planning permission for contemporary Dormer to rear of existing attic conversion as a non habitable storage space, roof windows to front roof all with associated ancillary works.
Planning Permission /retention sought for single storey domestic extension / structures to side / rear & all associated site works.
Single storey side and rear extension incorporating a new utility room, dining area and living area, as well as a new pedestrian side entrance gate on the east facing boundary wall and all associated site works
The proposed development will consist
Conversion of existing attic space to habitable space to include for bedroom and en-suite together with all associated site works.
Retention permission for development consisting of modifications to granted planning ref: F06A/0353 including; Modifications to the entrance gate, building footprint and dimensions from the house to site boundaries, the provision of a bay window to the front and adjusted window and door positions in elevation, and a chimney has been added. The rear family room roof profile is changed to a pitched roof with 2no. roof lights added.
Retention of modifications to granted planning ref. F06A/0367 including: modifications to the entrance gate, building footprint and dimensions from the house to site boundaries, the provision of a bay window to the front and adjusted window and door positions in elevation, and a chimney has been added. The rear family room roof profile is changed to a pitched roof with 2 no. roof lights added.
The development will consist of a two storey side extension and all associated site works.
The development will consist of an attic conversion to habitable space to include one bedroom with ensuite internal alterations, one roof window to the front roof elevation, 3 no. roof windows to the rear roof elevation and all associated site works.
Single storey detatched garden shed/games room in garden rear and associated site works.
The development will consist of a building a single storey pitched roof extension comprising new porch and wet - room at the front of the house and two windows at the side of the dwelling. The works include all associated internal, site and drainage works.
Permission for the Retention of the widening of an existing vehicular entrance.
Retention of an extension of 30 minutes to the hours of operation of the existing creche to 7.30am to 7.00 pm. Note: Condition 2 of Reg. Ref. F02A/0055 allows hours of operation from 8.00 am - 7.00 pm. AI/SAI received 10/01/23
(a) Retention of single-storey porch extension to front of dwellinghouse. (b) Retention of single-storey extension to the rear of dwellinghouse. (c) Construction of a new shed/outbuilding in the rear garden along with all associated siteworks.
The development will consist of a two storey side extension to be used as a self-contained family flat plus single storey rear extension and all associated site works. AI Received 29/08/23
Retention of partially complete works of a ground floor extension to rear of existing dwelling. Permission for completion of the works with first floor level above works consisting of a bedroom. alteration to existing first floor gable window. Two storey extension at front comprising of porch at ground floor & extension to bedroom at first floor level & all associated site works.
Planning Permission sought for single storey extension to front, side and rear of existing two storey semi - detached dwelling, incorporating: living room with bay window at front, wheelchair accessible bathroom and bedroom along with associated site works. AI Received 11/09/2024
The development consists of the retention of ground floor
The proposed development will consist of: change the use of domestic garage to use as a self-contained apartment together with all associated siteworks, including forming connections to mains water and sewage services.
Located North of Colaiste Ghlor na Mara and overlapping with Phase 2A & 2B off the Taylor Hill development (constructed / in construction), bounded generally by Taylor Hill Grange to the North, Taylor Hill Way to the South & Boulevard Road to the West and on a site to the East at Taylor Hill Wood (relating to works to enhance the existing detention basin). Planning Permission for development on 2 no. parcels of land (c.1.26 Ha.) relating to: 'Phase 2D' The proposal includes a portion of the site boundary of Planning Reg. Ref. F15A/0550 (amended by Planning Reg. Ref. F19A/0001) at Phase 2B of the Taylor Hill development (currently under construction). The development will consist of alterations and extension of site boundaries to Planning Reg. Ref. F15A/0550 (amended by Planning Reg. Ref. F19A/0001) to provide for: The construction of 32 no. 2-storey dwellings, comprising 5 no. 2-bed (House Types E & L), 15 no. 3-bed (House Types D, K/K1 & F/F1/F2/F3) and 12 no. 3-bed dwellings with 4-bed option including dormer at 2nd floor level (House Types B & B1) with associated car parking and private open spaces; stone entrance wall and pier with capping to match existing on North side of Taylor Hill Grange; new access road linking Taylor Hill Grange with Taylor Hill Way; an enlarged (to comprise a 2-storey) crèche extending to c. 1,025 sw. m (345 sq. m permitted) with associated 5 no. car parking spaces and set down area; landscaping; associated infrastructure and site development works, including enhanced detention basin on a separate parcel of land to the East at Taylor Hill Wood. The proposals comprise an additional phase to Planning Reg. Ref. F15A/0550, contributing to a total of 248 no. dwellings for Phase 2 A-D inclusive. Add Info received 1st May 2020. Clarification of Add Info received 12th June 2020.
The Development will consist of: The construction of a 4 storey building with part 3 storey building with roof garden. A) Two no. Commercial units at ground floor level, with bin and bike stores at ground floor level. B) 12 no. Apartments (5 no. two bed units, 6 no. one bed units, 1 no. 3 bed unit) connection to public foul, water and surface water sewer. C) Associated landscaping works including dedicated area for public art space, boundary walls and all associated site works.
The Development will consist
Permission for construction of a 3 Storey Building with Roof Garden level. The development will consist of A. Ground floor creche and medical centre (3 consultants offices) B. First floor apartments (6 no. two bedroom units), one office suite C. Second floor apartments (4 no. two bedroom units) D. Roof level garden connection to public foul, water and surface water sewer, bike and bin store, landscaping, boundary walls and all associated site works. AI received 15/05/23 SAI received 25/05/23
Permission is requested for a proposed part single-storey, part two-storey extension to rear of existing two-storey dwellinghouse, widening of first floor window on front elevation along with associated internal alterations and siteworks.
The development will consist of: a planning permission for a change of use from Retail to a Community Centre including all associated site works. Additional Information Received 27/01/2026
Planning permission is sought
The development will consist of the construction of 197 no. dwellings,open space, and ancillary infrastructure will facilitate Phase 4 of the lands at Ladywell in Balbriggan as follows: A) 129 no. terraced and semi-detached houses comprising 55 no. 2-bedroom houses (2 storey), 67 no. 3-bedroom houses (2 storey) and 7 no. 4-bedroom houses (3 storey) [house types with variants]; B) 18 no. terraced and semi-detached 3 bedroom townhouse dwellings; 18 no. Later Living Units (8 no. 1 bedroom & 10 no. 2 bedroom - all bungalows) [house types with variants]; C) 12 no. 1 bedroom Maisonettes in 6 no. 2-storey semi-detached buildings, and 4 no. 1 bedroom apartments in a 3-storey building (all apartments with terraces) along with 1 no. retail/café unit (c.165 sq. m) and 1 no. retail/medical unit (c. 185 sq. m) [including 'back of house area' & both units to be able to be sub-divided and amalgamated]; D) 16 no. duplex apartments (comprising 8 no. 1 bedroom [with terrace] and 8 no. 3 bedroom units) in 4 no. 3 storey buildings; E) Public open space c.0.85 hectares (with an additional c.0.76 hectares of riparian corridor open space), hard and soft landscaping (including public lighting & boundary treatment) and communal/semi-private open space (c. 660 sq. m) for the proposed townhouse, duplex and apartment units; F) Vehicular access will be provided via the Boulevard Road along with the provision of car parking spaces (280 no.), bicycle parking spaces and all internal roads and footpaths and bicycle and bin stores; G) Provision of surface water attenuation measures, (including widening of Clonard Brook), connection to water supply, provision of foul drainage infrastructure to Irish Water specifications and all ancillary site development, construction, and landscaping works [and temporary construction access from local road L1130]; H) The proposal will also amend the layout to elements of the shared layout across the permitted phases to include (Phase 3A [F21A/0055;ABP Ref:312048-21] relating to 29 no. dwellings replaced with 26 no. dwellings, Phase 3B [F22A/0526] relating to layout and Phase 3C [F22A/0670] relating to 3 no. dwellings replaced with 4 no. dwellings and associated amendments to attenuation (Clonard stream) and services. I) Provision of signalised upgrade of the junction of Boulevard Road and the Clonard Road (R122). An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development and submitted with this LRD application. A dedicated website has been set up for the LRD application which can be viewed at https://folkstownlrd.ie/ AI received 09/10/24
Proposed two storey extension to side and rear (extended living room, 2 new bedrooms, bathroom); single storey extension to rear (extended kitchen, laundry, pantry & bathroom). Small, front, upper window to be replaced by one matching existing upper front window. Existing porch and chimney to be removed. The development includes the diversion of existing foul sewer to avoid the proposed extension, together with all associated site works. AI received 08/10/21 CAI received 11/11/21
The works will consist of: (1) Removal of the existing entrance canopy, ground canopy, ground floor glazing and entrance doors; (2) Replacement canopy, glazing, automatic sliding door and new automatic sliding security gate to entrance; (3) Lifting and relaying of existing paviors to building approach; (4) Construction of new accessible sloped entrance; (5) All associated site services, drainage, lighting and landscaping required in conjunction with works.
The development consists of the retention of a detached portacabin used as a temporary staff canteen to the rear of existing building. (Tankardville House, a protected structure - RPS No. 0016).
Retention of a change of use from retail to a shop for the sale of hot food (pizza) as well as cold non-alcoholic drinks and desserts, mainly for home delivery, with ancillary customer collection. The application also includes the retention of one externally-illuminated fascia / shopfront sign. AI Rcvd 19/11/2024
Construction of a new single storey 4 bedroom detached dwelling (122 sq.m) to the rear of the site, shall include 1 new roof light, with new vehicular entrance exiting onto Hamlet Lane, development shall include boundary treatments and associated site works. AI received 30/03/21 AI deemed significant 31/03/21 Revised notices received 08/04/21 CAI received 11/05/21 CAI deemed significant SCAI received 02/06/21
The development will consist of the construction of four new padel courts (3 no. Will have a roof over), the erection of an associated modular amenity building and ancillary siteworks to include new access, parking area, bike racks, seating, landscaping, drainage & four totem signs (one located within the site, one located on the south-east corner of the site and two located on the footpath alongside the Harry Reynolds Road).
A) new single-storey porch extension to front and b)
The development will consist of Phase 3A as well as roads, services and public space relating to the overall Phase 3 Ladywell Masterplan lands as follows: A) 99 no. dwellings comprising 73 no. 2-storey houses consisting of 24 no. 2 bedroom dwellings [House Types E1, E2, E3, E4), 44 no. 3 bedroom dwellings (House Types B1, B2,B3, D1, D3, F1, F2, F3, F4, F5] & 5 no. 4 bedroom dwellings [House Types M1 & M2]), all with private open space; 16 no. duplex apartments (8 no. 2 bedroom [Types X1, X3] and 8 no. 3 bedroom units [Types X2, X4) in a 3 storey duplex building (including terraces at first floor level, single storey refuse storage building and cycle parking); 6 no. 1 bedroom 'triplex' apartments [Types T1, T2, T3] with balconies at first and second storey levels in 2 no. 3 storey buildings along with a single storey bicycle store & 4 no. 1 bedroom 'maisonette' apartments in 2 no 2 storey buildings (Types P1 & P2]) & bin stores as well as 172 no. car parking spaces; B) Public Open Space of c. 1 hectare, (with additional 0.27 hectares of open space along riparian corridor) as well as communal and private open space; all associated landscaping and drainage works (including attenuation) with public lighting, planting and boundary treatments, including regrading/re-profiling of site (and ditches] where required; C) Provision of Class 1 Public Open Space (c. 0.65 hectares), with play equipment (accessed from Hamlet Lane) located to the west of Bremore Pastures and Hastings Lawn, south of Flemington Lane, (proposal includes alterations to part of the Class 1 public park and associated works approved under Reg. Ref. F15A/0550]; D) Provision of roads and services infrastructure (surface water, foul and water supply) to facilitate the future development of Phase 3 lands (Phases 3B-3D) including public lighting, Suds drainage and services infrastructure, as well as vehicular and pedestrian connections to the 'Boulevard Road' and all associated landscaping and ancillary site development works; E) Signalised upgrade of the junction of Boulevard Road and the Clonard Road (R122) as well as pedestrian crossings along Boulevard Road; An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. The EIAR is available for inspection or purchase. AI received 14/07/21 AI deemed significant 19/07/21 Revised Public Notices (SAI) received 21/07/21 CAI received 06/10/21
Demolition of existing detached garage (floor area 72 m2) and the construction of a single storey extension to the site of existing factory (floor area 482.50 m2).
Retention planning permission for window to side elevation at 1 Blackt
1. Amalgamation of ground floor level of unit nos. 12 & 13 to form a single retail food store unit (204sqm). 2. removal of internal wall to facilitate the amalgamation. 3. and all ancillary works necessary to facilitate development.
Permission for Insulation and Workshop Unit (576 sqm) to the South of the Production Facility, for roofing the existing Lower Gantry Crane (3,713 sqm) to the East of the Production Facility, for a raised roof section over the Batching Plant (300 sqm) within the Production Facility, for retention of a Laboratory Unit (56 sqm) to the East of the lower gantry crane including associated site development works, and retention of modifications to the Main Entrance Gate. AI received 13/02/23 SAI received 27/02/23
Construction of new two storey kitchen/bedroom extension to rear of existing dwelling and associated works AI received 11/5/2022 AI deemed significant ** Revised public notices received 26/5/2022