SD25A/0071W

PERMISSION for development at this site at Grange Castle Business Park. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of revisions to parent permission SDCC Reg. Ref. SD24A/0188W to include the following: Removal of internal mezzanine floor level (175sqm). Removal of internal staircase. Introduction of external staircase to be located adjacent the south façade and enclosed in screening panels. All other developments as permitted under the SDCC Reg. Ref. SD24A/0188W: A permitted storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.

Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22, D22F1W8South Dublin County CouncilPermission0 reasons0 conditions
Granted14 May 2025
SD23A/0123

Permission for development consisting of the completion of the development granted permission under Planning Application Reg. Ref. SD16A/0236 subject to the amendments and alterations to the previously approved biopharmaceutical manufacturing facility and warehouse extension and other additional, new development not forming part of SD16A/0236, located at the Pfizer site at Grange Castle Business Park, New Nangor Road; The modifications to the approved development will consist of alterations and modifications to previously approved site buildings and infrastructure required to support the proposed development they include, (a) A 6-level biopharmaceutical manufacturing building sized approximately 30,469sq.m (previously approximately 34,650sq.m) and approximately 35 metres high (previously approximately 28.2m high), with stairwells approximately 38m high, and roof-mounted plant and equipment, including solar panels; Modifications to the existing Development and Manufacturing Facility including elevational alterations and modifications to existing plant and equipment; (b) A single-storey warehouse building extension with high-bay, sized approximately 3,200 square metres (previously approximately 1,142sq.m) and approximately 17.5m high, with roof-mounted plant and equipment, including solar panels; (c) A single-storey pedestrian and materials link sized approximately 1,687sq.m (previously approximately 750sq.m) and approximately 6.95m high; (d) A new, additional 4-level extension to the existing DS1 biopharmaceutical manufacturing building, to accommodate material lifts and storage areas, sized approximately 1,925sq.m and approximately 38.2m high, to the south elevation of the existing building; (e) A new, additional single-storey chiller building sized approximately 395 square metres and approximately 6.25m high, with roof-mounted plant and equipment; (f) A new, additional single-storey plant and utilities building sized approximately 256sq.m and approximately 6.25m high, with roof-mounted plant and equipment; (g) Provision of relocated car park from its previously permitted location at the northeast of the side to a new location to the southeast of the proposed biopharmaceutical facility; including approximately 273 additional car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the internal Grange Castle Business Park roads. Mobility parking is located adjacent and directly north of the proposed facility; (h) A relocated, single-storey security building sized approximately 60 sq.m and 6m high; (i) The proposed site infrastructure includes additional cooling towers/heat exchangers, a tank farm, pipe-bridges, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, an electric vehicle charging and solar panel substation to service photovoltaic panels over new car parking spaces, photovoltaic solar panels located over new car parking spaces, electrical generators, underground pumping facilities and internal roads and paths, fencing and site lighting, and the use of the existing Pfizer site entrance (Gate No.3) for heavy goods vehicles; (j) The development includes modifications to and the extension of, the existing internal road network within the Pfizer Campus; (k) Proposed new landscaping includes new landscaped and planted areas, replacement and reinforcement of the existing landscaping and modifications to existing berms and perimeter security fencing and gates; (l) Proposed new signage based at ground level and on the building facades on the proposed new production building; (m) The works include temporary contractor compounds, temporary car parking and the temporary use of existing site entrances during construction activities; (n) Proposed new surface water management infrastructure for the site, consisting of underground attenuation systems, rainwater harvest cisterns and distribution pipework; (o) All associated site works including sustainability features described in points (a) to (I); Planning permission for the construction of a temporary contractors car park on land to the west of the Pfizer facility with access off Grange Castle Business Park and the reinstatement of the lands to agriculture after the need for the car park expires; The application is seeking permission of 5 years for the completion of the development granted permission under PA Ref: SD16A/0236 subject to the above amendments and alterations to the previously approved Biopharmaceutical Manufacturing Facility and Warehouse and other additional, new, development not forming part of SD16A/0236; This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required; An Environmental Impact Assessment Report (EIAR) accompanies this planning application.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions
Granted17 July 2023
SD21A/0203

Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions
Granted10 November 2021
SD20A/0283

Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions
Granted29 March 2021
Showing 1-4 of 4