Showing 1-12 of 12 public recordsEquinix Ireland Ltd. intend to apply for Permission for development at Unit14 Northwest Business Park, Ballycoolin, Dublin 15 D14 E205. The development will consist of the installation of 184PV panels onto the main roof of the existing building on site. Each PV panel will be 1902mm x 1133mm and will be installed parallel to the existing roof slope for minimal visual impact. Total square meter of PV panel surface on the roof will be 398.2sqm. Additional Information Received 16/09/2025
Permission for amendments to the developemnt permitted under Reg. Ref: FW24A/0199E at a site ( known as Site J) at Northwest Business Park, Kilshane Way, Ballycoolin, Dublin 15. Permission is sought to amend Condition No. 3 of the planning permission Reg. Ref.: FW24A/0199E to read as follows: “The proposed development shall comprise of 3 no. enterprise/light industrial/wholesale outlet units with associated offices. Reason: To clarify extent of the permission."
Go-Ahead Transport Services (Dublin) Limited intends to apply for planning permission for development on this c. 2.1 ha site at Unit 200 Northwest Business Park, Ballycoolin, Dublin 15, D15 K8ND. The development will consist of the change of use of this site from the existing warehouse/logistics facility use to transport depot, including the 2 no. existing buildings, each incorporating internal ancillary offices and related areas (Building 1: c. 5,084 sq m; Building 2: c. 993 sq m). The development will include on site provision for the storage, maintenance and parking of buses (187 no. bus spaces comprising 176 no. designated spaces and 11 no. overnight spaces); ancillary offices and staff facilities (including toilets, changing rooms, canteen, store, meetings and training rooms); bus workshop; external fuel storage tanks, water tanks, refuelling area and bus wash drive-through. The development will also include the provision of a pedestrian entrance adjacent to the main vehicular entrance; the provision of a roller shutter door and ramped access to west of Building 2; surface car parking (including electrical charging points and ducting); motorcycle and bicycle parking; pedestrian pathways; signage; plant, back up generator and water tank; external lighting; hard and soft landscaping; boundary treatments; piped infrastructure and ducting; drainage infrastructure; waste management areas and all ancillary site development works above and below ground. AI Rcvd 26/05/2025
The proposed development will consist of the addition of a new first floor window opening to match existing and a new door opening at ground level to the East (Front) building elevation. Internally, carry out works and modifications to extend the existing offices to include new staff facilities, storage room, circulation routes and a new fire escape stairwell and enclosure at ground floor level all amounting to 85sqm. Works to include for all associated ancillary site works.
The development will consist of 2no. external steel gantries on the East facade of the existing building at first floor level, to support mechanical plant equipment and external steel access ladders.
Planning permission for the retention and completion of amendments to the development permitted under Reg. Ref.: FW21A/0146 on a site to the north of Northwest Logistics Park, Ballycoolin, Dublin 15 (formerly known as Northwest Business Park). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west. The proposed amendments relating to permitted warehouse / logistics development (Unit 900) comprise the following: • Amendments to the permitted northern security fence boundary, relocating it southwards to accommodate future development to the north of the site (under Reg. Ref.: FW22A/0066). • Provision of an access control barrier at the entrance to the development; • Amendments and rearrangement of permitted bicycle & smoking shelters due to proposed alteration to northern fence line. • Amendments to the permitted ESB substation including relocation and provision of an ESB vehicle set down area. • Amendments to the permitted plant areas: the permitted external yard plant enclosure is increased to accommodate mechanical plant requirements, and an additional electrical plant room with a gross floor area of c.115 sq.m is proposed to the southern façade of the main warehouse / logistics building. • Amendments to the permitted sprinkler tank and pump house, which are repositioned, and the sprinkler valve house area which is reduced in scale. • Amendments to perimeter footpaths along the northern and western building frontages. • Amendments to the permitted grade doors, including the omission of 1 no. grade door and repositioning of 1 no. grade door along the northern facade. • Amendments to and reconfiguration of the internal layout of the permitted warehouse / logistics unit including provision of an additional storeroom, relocation of a server room and the reconfiguration of a driver access room & pallet truck charging points. • Associated amendments to building facades, including alterations to the location of permitted green walls, and provision of an external fire escape stair to the southern façade. • Provision of a communications antenna c. 2 metres in height at roof level. • Alteration to the route of permitted underground foul sewer connection to the southwest of the site, including associated alteration to the development boundary to facilitate the alteration. • All associated and ancillary works.
The proposed development comprises the fitting out as a canteen, with accompanying sanitary accommodation and office areas of the second floor level of an existing extension to the north of Unit 624, Northwest Business Park, Ballycoolin, Dublin 15, D15 ND71. All of the proposed works are to be carried out within an area of 380 sq.m. on the existing second floor level. No changes are proposed to the existing elevations other than the addition of 4 No. 1800 mm wide x 600 mm high ventilation louvres above the existing second floor glazing. Otherwise the appearance of the extension will be retained as permitted under Reg. Ref. FW18A/0181 and as subsequently amended by Planning Permission Reg. Ref: FW20A/0082.
Permission for amendments to the development permitted under Reg. Ref.: FW19A/0126 relating to the permitted unit at Unit 632 at Northwest Logistics Park, Ballycoolin, Dublin 15 (formerly known as Northweat Business Park). The application site is bound by Kilshane Avenue to the west. The develpment will consist of an amendment to Condition No. 22 of the final grant of planning permission Reg. Ref.: FW19A/0126 to read as follows: 'The office use shall remain ancillary to the use of the unit as a single warehouse/logistics/light industrial unit and no part of the overall unit shall be sold for use by a separate occupier'.
Permission for amendments to the development permitted under Reg. Ref.: FW20A/0169 relating to permitted Unit 634 at Northwest Logistics Park, Ballycoolin, Dublin 15 (formerly known as Northwest Business Park). The application site is bound by Kilshane Park to the west. Permission is sought to amend Condition 2(i) of planning permission Reg. Ref.: FW20A/0169 to read as follows: '(i) The use of the development shall be for logistics/warehousing. The offices shall remain ancillary to the unit permitted. No part of the overall unit shall be sold for use by a separate occupier'.
The application site is bound by Kilshane Way to the south and Kilshane drive to the east and north. The proposed development consists of the construction of 1 no. warehouse / logistics / light industrial unit (proposed unit 736) including ancillary office floorspace over two levels with a maximum height of c 17.09 m and a total GFA of 6,180 sqm. The proposal includes two vehicular access points (staff/ visitors and service) off the existing road network serving the Business Park. The proposal includes 61 no. car parking spaces and 20 no. cycle parking spaces. The development also includes 1 no. ESB substation signage zones for the unit, PV panels at roof level, HGV service yard areas, landscaping, boundary treatments, entrance gates, lighting, and all associated site works including underground foul and storm water drainage network and attenuation areas. Add Info received 18th December 2020.
The development consists of a prefabricated storage building 16m x 5m x 3.3m high providing a usuable floor area of 70sq.m. A clad steel frame structure with double doors to each end of the building will be assessed via compliant steel ramp all sited within the existing yard.
The development will consist of a prefabricated storage building, 16m x 5m x 3.3m high, providing a usable floor area of 70 sqm. A clad steel frame structure with double doors to each end of the building will be accessed via compliant steel ramp all sited within the existing yard.