to
to

Planning records

Showing 1-3 of 3 public records
PreviousPage 1 of 1Next
F25A/0404E

The development will consist of the installation of new lightweight advertising display frames on both sides of the 27 airbridges located on the airside apron at both Piers 3 and 4 at Dublin Airport, including the removal of the existing displays, the installation of new displays and all associated site works.

Piers 3 & 4 Airbridges, Airside Apron, Dublin Airport, Collinstown, CoFingal County CouncilPermission0 reasons0 conditions
Granted27 June 2025
F23A/0301

The proposed development will consist of: (1) the reconfiguration and expansion of the existing 2-storey US Customs and Border protection (CBP) pre-clearance facility, which will consist of: (1a) the demolition of: 2no. existing Pier 4 link bridges; 2no. external vertical circulation cores (VCC) and 2no. airbridges; part of the north, east and south elevations of the existing CBP facility (c.309m 2 ), including external footpaths, ramps and handrails; and part of the existing apron pavement (c. 5,000m 2); (1b) internal reconfiguration of part of Pier 4 and the existing CBP facility and the construction of an expanded 2-storey, part 3-storey CBP facility to the east of the existing CBP facility (c. 6,419m 2 ), to include: (i) pre-clearance passenger processing facilities at Level 10 (ground floor), including 5 no. entry E-gates, queuing areas, 8no. screening lanes (including 1no. for training/contingency and 1no. for staff access (no increase in number of existing passenger screening lanes), 22no. booths, transit lounge area, welfare facilities, and ancillary staff facilities; (ii) lounge, retail/food and beverage area, swing gateroom, welfare facilities, airline lounge, staff facilities, including ancillary offices at Level 15 (first floor); (iii) construction of 2no. external vertical circulation cores (VCC); (iv) construction of a new link bridge at Level 20 (second floor) to the existing Terminal 2 building and all associated works; (v) fallow space at Level 10 and Level 20 to allow for future CBP security facilities, and a lift core extending to Level 30 (third floor (part)) to safeguard for future expansion, to merge with the remaining parts of the existing facility at Pier 4; (vi) ancillary external structures to the extended roof, including rooflights, external balustrade and handrail; fixed metal roof walkway; and fall protection anchorage system; (vii) realignment of the existing airside road; the provision of new airside road; and the provision of pedestrian walkways and zebra crossings; and (viii) the reorganisation of an existing airside operations car parking area to provide 15no. airside operations car parking spaces; the provision of 2no. PRM airside operations parking spaces, 2no. platinum passenger parking spaces, 2no. GIWA (goods vehicles) spaces, and 2no. bus set down areas. (1c) decommissioning of existing operational aircraft stand 409 L/C/R, and the provision of temporary MARS operational aircraft stand 409T accommodating 2no. Code C or 1no Code E aircraft, as well as the realignment of the existing apron by way of new paint markings on the apron pavement. (2) the partial demolition (c. 3,320m 2 ), refurbishment and upgrade of the existing 2-storey former Flight Catering Building, to become the South Apron Support Centre (SASC), which, together with its existing external hardstanding area to the north-west of the SASC, is to be used initially as a temporary construction compound (office storage and a pre-screening/ logistics/ staff welfare facilties) for the proposed works to the CBP facility, and then for continued use as an Airport Operational Building for airside support/operations, which will consist of: (2a) upgrade of the façade of the existing SASC building, to include partial demolition of the later attritions/extensions to the south and west flanks of the building; demolition of the existing pedestrian link bridge to Shamrock House to the east (making good the elevation of Shamrock House to match the existing), and demolition of an existing substation internal to the building; (2b) the refurbishment of the remaining SASC structure to provide offices, meeting rooms, staff welfare facilities, storage and plant rooms on the ground and first floors, and refurbished rooftop plant enclosure and new rooftop balustrades (c. 5,043m 2 ), as well as an external dining courtyard at ground floor; (2c) the provision of 10no. visitor car parking spaces, 2no. PRM visitor car parking spaces and 80no. cycle storage racks; (2d) revised external pedestrian and vehicular circulation arrangements; and (2e) separate external smoking shelter and separate external bin storage. The proposed development at the existing CBP and SASC buildings will also require the diversion and extension of the existing watermain on site, and a new foul and surface water drainage system, including a proposed future clean only pipeline for future diversion of roof runoff from the CBP building. The proposed development also includes all associated site development and landscaping works, and all ancillary airport infrastructure including additional apparatus/ equipment, as well as High Mast Lighting (HML). The proposed development will not result in any increase in passenger or operational capacity at Dublin Airport. There will also be no increase in staff parking, either airside or landside, as a result of the proposed development. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). Site of the existing 2-storey US Customs and Border Protection (CBP) pre-clearance facility at Pier 4, Terminal 2 (c. 1.765ha), and the site of the existing 2-storey former Flight Catering Building to the southeast of the Terminal 2 building (c. 0.86 ha), in the townlands of Corballis and Collinstown, Dublin Airport, Co. Dublin.

In the townlands of Corballis and Collinstown, Dublin Airport, Co. DubFingal County CouncilPermission0 reasons0 conditions
Refused24 July 2023
F22A/0460

We, daa plc intend to seek planning permission for development on 4no. sites located entirely within lands in the ownership of Dublin Airport, including 2no. sites at the Airfield in the townlands of Collinstown, Coultry, and Huntstown, Co. Dublin, 1no. of which incorporates part of Pier 3 and surrounding aircraft stands, aircraft stands to the south of Pier 2, Apron Taxiway 4, Taxiway F-2, Runway 16/34 (the crosswind runway), Taxiway W1 and W2, West Apron; and 1no. of which incorporates an existing airside site compound, south of the West Apron; 1no. area of land to the west of the existing Western Compound, south of the R108, north-west of the Airport, in the townland of Pickardstown, Co. Dublin, also to be known as the Western Compound; and 1no. an area of existing hardstanding to the south-west of the Airport, north of the R108, to be known as the Southern Compound, in the townland of Portmellick, Co. Dublin. The proposed development will consist of the construction of a subterranean Underpass of Runway 16/34, a critical airfield operational safety project, which will comprise: a) A twin-cell enclosed tunnel with 2 no. lanes in each direction, linked to the surface by ramps, portals, and light attenuation screen (1.8m in height above existing ground level at the west ramp and 3.3m in height above existing ground level at the east ramp). The enclosed section will be approximately 0.7 km long, with an overall alignment of approximately 1.1 km in length from top of ramp to top of ramp. It will be approximately 24m in external width, and approximately 5.5m in internal height from road to tunnel ceiling. It will be up to 17.5m below existing ground level; b) Plant room, of approximately 625m2, which will comprise housing for transformers, pumps, controls and communications equipment, located underground at the portal of the east ramp, a parking layby and utilities corridor crossing; c) Demolition (approximately 23,741m2) and reinstatement (approximately 16,216m2) of part of the pavement surfaces of Apron Taxiway 4, Taxiway F-2, Runway 16/34 (the crosswind runway), Taxiway W1 and W2, and the West Apron; d) Access roads to tie in with the existing airside road network at each end of the proposed Underpass (at Pier 3 on the Eastern Campus and the West Apron on the Western campus respectively), and 31no. car parking spaces at surface level at Pier 3; e) Demolition (approximately 97m2) of fixed links (elevated enclosed passenger walkways leading from the Pier to Aircraft Nodes) and Nodes (structures which provide support for the fixed links and internal pedestrian access cores to ground level) serving 3 no. aircraft stands and associated airbridges (passenger boarding bridges) at Level 20 (departure gates) of Pier 3. To the south of Pier 3, an existing airbridge is to be removed and an existing fixed link is to be adjusted to service existing stands in that area; f) Replacement of the demolished fixed links and nodes with 3no. new fixed links, A (approximately 356m2), B (approximately 227m2) and C (approximately 170m2) and of approximately 150m, 95m and 70m in length respectively and approximately 2.2m in width and approximately 3.2m in height, at a maximum height of approximately 7.1m above the surrounding apron; 3no. two-storey Nodes A, B and C, approximately 157m2, 154m2 and 148m2 in area respectively; and 2 no. airbridges (1no. at Node A and 1no. at Node B). g) Modifications to the elevations of Pier 3 at Level 20 to accommodate the links and airbridges, including part replacement of the existing glazing with new glazing/cladding, and a new cladded portal with new doors and access control at each new fixed link location; rearrangement of part of the internal floorspace of Level 20, including a new partition between the entrance/ exits of proposed fixed links A and B; new surface water drainage network; and 31no. car parking spaces at surface level; h) Realignment of stands on the Eastern Campus resulting in the net loss of three Narrow Body Enabled (NBE) stands and net gain of one Wide Body (WB) stand at Pier 3; i) Realignment of aircraft stands in the West Apron (involving rearranging /relocating stands by way of new paint markings on the apron pavement) to accommodate the portal and Underpass access roads (no net change in number of stands); j) Modifications to existing drainage network in the vicinity of the proposed Underpass including replacement of existing attenuation system, and construction of a new drainage network for the proposed Underpass, including sump pit with pumps, interceptors, and new attenuation tank; k) Temporary diversion of the Airfield Trunk Culvert during construction and its reinstatement at the existing alignment and level; I) Construction of a new underground pipe network (6no. new pipes) to allow for future drainage infrastructure/surface water management measures; m) Realignment of stands at Pier 2 on the Eastern Campus (no net change in number of stands); n) All ancillary airport infrastructure including additional apparatus/equipment including jet blast fencing, Fixed Electrical Ground Power (FEGP), Advanced Visual Docking Guidance System (AVDGS), Stand Number Indicator Board (SNIB), Fuel Hydrants, High Mast Lighting (HML), electrical charging facilities, and miscellaneous ground service equipment (GSE) parking and storage areas; o) The proposed development also includes (i) a new Western Compound adjacent to the existing Western Compound located south of the R108, north­ west of the Airport, with a new access off the R108, to be used for pre-screening for deliveries going airside, and to include an airside pass office, parking for construction staff, as well as storage areas, and general logistics; (ii) the provision of a new Southern Compound to the north of the R108, to the south west of the Airport, to be utilised as a lorry waiting area for HGVs. No works are required at this Southern Compound; and (iii) the use of an existing airside site compound adjacent to the proposed Underpass, south of the West Apron, for concrete crushing, batching plant, the storage of non-hazardous materials and equipment, as well as offices, workshop, welfare facilities, and parking. The proposed development does not propose any increase in passenger, cargo or operational capacity at Dublin Airport. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura lmpact Statement (NIS). The planning application, EIAR and NIS may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, during its public opening hours of 9.30 - 16.30 Monday - Friday (Cash Office opening hours are 9.30 - 15.30), and a submission or observation may be made to the Planning Authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the Planning Authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions, or may refuse to grant permission. AI Received 22/12/2022

Townlands of Collinstown, Coultry, and Hunstown Co. Dublin, and in theFingal County CouncilPermission0 reasons0 conditions
Granted27 February 2023
Showing 1-3 of 3
PreviousPage 1 of 1Next