Planning records
Showing 1-4 of 4 public recordsThe retention of: a rock splitter and associated ancillary canopy covering an area of c. 120.1sqm with a maximum height of c. 7.2m and associated single storey cabin/site office measuring c. 4.7sqm in area; aggregate washing plant with a maximum height of c. 10.7m; welding shed measuring c. 190.2sqm in area with a maximum height of c. 8.4m; and Electricity Supply Board substation measuring c. 13.5sqm in area with a maximum height of c. 3.2m. Retention is also sought for all associated ancillary site development works, including site levelling, lighting, cabling and ducting
Change of use from quarry to recovery activities, over a total area of 4.84-hectares, comprising: -The infilling of lands as a soil recovery facility with inert waste consisting of suitable uncontaminated soil & stone and dredging spoil, to improve land for agricultural use (i.e., 4.792-hectare area, total net import of 199,500 tonnes over 8 years); -An Administration Area (i.e., 0.048-hectare area), to include a site hut/site office and portable chemical toilet; and -All associated site works and services required to facilitate the development. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted with the application
The construction of a bungalow style dwelling, on site wastewater system, bored well, access from existing private lane and all associated site development works
Permission for the conversion of existing outbuilding to rear of dwelling for habitable use, including renovations and raised ridge height. Permission is also sought for the construction of a single storey annex link from dwelling to converted outbuildings, upgrade the on-site wastewater treatment system and all associated ancillary works