Planning records
Showing 1-4 of 4 public recordsThe development will consist of the development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: Demolition of existing, temporary, single storey showroom. Construction of a single storey main building (RNG Building - c.1,297.7 sq.m) with air handling units (AHUs). External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. Replacement of existing estate road access with new main access and secondary/emergency access. MV substation (with separate estate road access). Stormwater attenuation pond. Bike parking shelter and bin store. 12 no. car parking spaces (4 of which are EV parking spaces and with 1 accessible parking space). Internal road and footpath layout, perimeter fencing and security gates. Landscaped and planted areas including riparian zones. All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,536.9 sq.m
We, Vantage Data Centers DUB11 Ltd. are applying for permission for development at this site on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townland of Ballybane within Profile Park, Clondalkin, Dublin 22. The development will consist of an amendment and modification of the permitted Gas Networks Ireland (GNI compound that was granted as part of, and under SDCC Planning Ref. SD21A/0241 that will include: - Replacement of the permitted vehicular access to the GNI compound from within the data centre campus to being directly off Legacy Drive that will include a modified internal access road; - New internal layout of the GNI compound that will include the replacement of the permitted boiler kiosk (42sqm), skid kiosk (89sqm) and analyser kiosk (3sqm); with a single storey boiler house kiosk (19.7sqm); single storey regulators / meters kiosk (36.8sqm); single storey electrical kiosk (14.6sqm); as well as all associated infrastructure and ancillary works; and - 3 no. floodlighting columns (each 8.537m in height) within the GNI compound that will be surrounded by a 3m high fence and vehicle gates.
Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.