Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2320Refused

    WITHIN THE TOWNLANDS OF LUMCLOON BUN DERRYCARNEY FALSK DERRIES RIN LEA BEG AND, LEA MORE, CO. OFFALY

    DEVELOPMENT OF A SOLAR PHOTOVOLTAIC (PV) ENERGY DEVELOPMENT.THE PROPOSED SOLAR PV ENERGY DEVELOPMENT IS CONTAINED WITHIN TWO DISTINCT PARCELS OF LAND, REFERRED TO AS ZONE 1 AND ZONE 2. THE OVERALL DEVELOPMENT SITE OF C. 247 HECTARES WILL CONTAIN: (I) SOLAR PV PANELS ON GROUND MOUNTED FRAMES /SUPPORT STRUCTURES WITHIN EXISTING FIELD BOUNDARIES, (IÎ) 30 NO. MEDIUM VOLTAGE POWER STATION (MVPS) ENCLOSURES (6.058M LONG X 2.348M WIDE X 2.896M HIGH), (III) 6 NO. WEATHER MONITORING STATIONS, (IV) 2 NO, TEMPORARY CONSTRUCTION COMPOUNDS (50M LONG X 35M WIDE), (V) INTERNAL SITE ACCESS TRACKS AND UNDERGROUND CABLES (UGC), (VI) UGC IN THE PUBLIC ROAD NETWORK (L70095, L70099, L70208-3 & R357), WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE DERRYCARNEY 110KV SUBSTATION LOCATED WITHIN THE TOWNLAND OF LUMCLOON, AND (VII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER FENCING WITH ACCESS GATES AT VEHICLE SITE ENTRANCES ALONG PUBLIC ROADS (L70095 AND THE R357), CCTV SECURITY CAMERAS, LANDSCAPING, AND ALL ASSOCIATED CIVIL ENGINEERING WORKS, PLANNING PERMISSION IS BEING SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THIS PLANNING APPLICATIONGrounds not yet categorised
    Decision22 March 2023View record
  2. © OpenStreetMap
    21306Refused

    RIN, CO. OFFALY

    CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKSGrounds not yet categorised
    Decision09 July 2021View record