Construct dwellinghouse, garage, entrance, packaged wastewater treatment system and polishing filter and all associated site works.Decision record indexed
Demolish existing clubhouse and to construct a new clubhouse and sports hall. The facilities will include a single story clubhouse with 4 dressing rooms, toilets, meeting room, sports hall and all associated site worksDecision record indexed
Develop at Portlaoise GAA, Rathleague, Portlaoise, Co. Laois, R32 Y160. The proposed development will consist of amendments to the permission granted by Laois County Council under LCC Reg. Ref. 25/60304 as follows: (1) The replacement of 4 no. permitted handball alleys with 2 no. equipment storage rooms; (2) The addition of 2 no. ball alleys/striking alleys, measuring c.366.3 sqm, to the southern façade; (3) An external ball wall 30m in width is proposed to the permitted south-eastern façade; (4) The relocation of the permitted pumping station on the southern façade; (5) The extension of the permitted precast south-eastern façade wall to conceal the proposed ball alleys and the relocated pumping station; (6) c.60 sqm of additional floor space at loft level above first floor level for the accommodation of plant/mechanical equipment; (7) Black ventilation louvres above external doors of the indoor training pitch and additional roof vent popups; (8) Modification of the roof overhang structure to incorporate rainwater downpipes in lieu of rain chains; (9) Omission of 1 no. external door to plant room; (10) External roller shutter door to the southeastern elevation; (11) A reduction of 2 no. car parking spaces from the permitted 227 no. spaces to 225 no. proposed spaces (incl. 11 no. accessible spaces, 21 no. EV spaces, 1 no. EV accessible space), 3 no. motorcycle spaces, 4 no. bus spaces, 1 no. dedicated accessible set down space and standard set down spaces; (12) A reduction of 2 no. bicycle parking spaces from the permitted of 227 no. spaces to 225 no. proposed spaces; (13) Signage to the northwestern façade consisting of Portlaoise lettering and club logo; (14) Updated layout of Pitches 2 and 3 including associated landscape and additional scoreboard; (15) All associated site development, civil and landscaping works to include the provision of grasscrete overrun surfacing at the main entrance.Decision record indexed
A c. 1.82 Ha site at Summerhill, Portlaoise, Co. Laois
Provide 36 No. 4-bed, 2 No. storey houses.The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.Decision record indexed
A c. 4.15 Ha site at Summerhill, Portlaoise, Co. Laois
Construct a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.Decision record indexed
A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois
Construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.Decision record indexed
Construct two storey and part three storey 1000 pupil secondary school to include general classrooms, specialist classrooms, a general-purpose hall, PE hall, offices, staff room, library, sanitary facilities and ancillary spaces. The development also includes the provision of: • New site entrance from O’Dowling roundabout on the Portlaoise South Orbital Route – R94 - Leading to new car and bus set down/ drop off area with 49 No. carparking spaces and with pedestrian & cycle route to the proposed school. • New site entrance from the adjoining Timahoe / Well Road (R426), access road with cycle and foot paths, bicycle spaces and 92 No. car parking space. • Provision of new footpath on the Timahoe / Well Road (R426), connecting to the existing. • Proposed new Hockey pitch with associated fencing, shelter dugouts and 8 no. flood lighting standards. • 6 no. ball courts, landscaped gardens and external social space. • Provision of a heat pump and gas storage areas, external stores and bin storage area. • Provision for all landscaping, boundary treatments, associated drainage, attenuation and other site services with all related site development and ancillary works. • A Natura Impact Statement (NIS) will be submitted to the planning authority with the application and the NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.Decision record indexed
Construct dwelling house, domestic garage, septic tank treatment system, percolation area, new site entrance and all associated site works.Decision record indexed
Retain extension to existing dwelling house including first floor extension to front and single storey extension to rear and retain changes to entrance to site, also full planning permission to demolish existing garage on site and to partially demolish existing shed and all associated site worksDecision record indexed
Construct Dormer Style Dwelling House, Garage, Site Entrance, Wastewater Treatment System & Percolation Area and to include all associated site worksDecision record indexed
1) Demolish the existing attached garage to the west of the existing dwelling, 2) Construct a storey and a half style extension to the west of the existing dwelling, 3) Alter the South, East and North elevations including all associated site works.Decision record indexed
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands., Portlaoise,
Permission for development at this c. 2.14 Ha site at Summerhill, Portlaoise, Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road, to the east by Holy Family School Road, and to the west and south by undeveloped agricultural lands. Works are also proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.Decision record indexed
A site at Summerhill Portlaoise Co. Laois (now known as Sand Wood)., The site is generally bound to the north by Aghnaharna Drive to the east by Holy Family School Road to the south by undeveloped lands and, to the west by a residential development
Amend permission to the permitted Neighbourhood Centre building granted under LCC Reg. Ref. 23/60348, The development will principally consist of the minor revisions to the Neighbourhood Centre building, including internal layout changes, elevational changes and amendments to the roof profile. The development results in a reduction in the principal height of the Neighbourhood Centre building from 14.85 metres to 13.36 metres and a reduction in floor area from 1,484 sq m to 1,426 sq m. The development also proposes minor car parking layout changes; landscaping; and all other associated site works above and below ground. The development also proposes minor car parking layout changes; landscaping; and all other associated site works above and below ground.Decision record indexed
A c. 2.98 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by Aghnaharna Drive to the east by the Holy Family School Road and to the west and south by undeveloped agricultural lands., Portlaoise, Laois
Proposed works at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian/cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Proposal for the removal of the redundant western arm of the roundabout to the southeast at the Holy Family School Road and the provision of new active travel infrastructure incorporating a two-way cycle track with the adjoining footpath along the eastern boundary which transitions to a shared pedestrian / cycle facility to the north as it approaches the O’Kelly roundabout, and continues on the southern side of Aghnaharna Drive on the western arm of this roundabout. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. A pumping station is proposed southwest of the main development site. The development site area, roadworks, water and drainage works, and pumping station will provide a total application site area of c. 3.39 Ha. The development will consist of: a 2 No. storey Neighbourhood Centre (1,484 sq m) principally comprising a retail unit 361 sq m), a creche (289 sq m), refuse storage (23 sq m) and cycle storage (65 sq m) at ground floor level and office floorspace (746 sq m) at ground and first floor level; the provision of 57 No. houses (comprising of: 5 No. detached dwellings (three-storey 5-bed); 3 No. semi-detached corner dwellings (two-storey 4-bed); 29 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 5 No. 3 No. storey duplexes comprising 5 No. 2-bed units and 5 No. 3-bed units. The development will also include: a new Link Road through the site, providing vehicular entrance/exit to the site via O’Devoy (O’Deevy) roundabout; roof plant at the Neighbourhood Centre; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-stations; lighting; and all associated site and development works above and below ground.Decision record indexed
A site at Summerhill Portlaoise Co. Laois (now known as 'Sand Wood')., The site is generally bound to the north by Aghnaharna Drive to the east by Holy Family School Road, and to the west and south by undeveloped lands and a residential development
Amend permission of the permitted Neighbourhood Centre building granted under LCC Reg. Ref. 23/60348, as amended under LCC Reg. Ref. 25/60040, (now known as ‘Sand Wood’). The site is generally bound to the north by Aghnaharna Drive, to the east by Holy Family School Road, and to the west and south by undeveloped lands and a residential development currently under construction, granted under LCC Reg. Ref. 23/60350 (also known as ‘Sand Wood’). No amendments are proposed to the permitted 67 No. residential units. The development will principally consist of: the change of use of the permitted creche and cycle store to a retail unit; the subdivision and part change of use of the permitted retail unit to a medical centre, retail unit, a refuse store and ESB switchroom; provision of a mezzanine level (c. 139 sq m) above first floor level within the southern extent of the Neighbourhood Centre building to provide additional office floor space; rationalisation of the ground and first floor layouts of the Neighbourhood Centre building and modifications to the footprint of the building, increasing the floor area by c. 57 sq m. The development will result in an overall increase in floor area of the Neighbourhood Centre building by c. 196 sq m, from 1,426 sq m to c. 1,622 sq m. The development also proposes: the provision of 3 No. additional car parking spaces; minor cycle & car parking layout changes; landscaping; boundary treatments; and all other associated site works above and below ground.Grounds not yet categorised
(1) change of use of an existing creche building (177 sq.m) at site 6B (approved under planning file 14-335) to a single storey house; (2) replace a single storey creche building (177 sq.m) at site plot 56 (approved under planning file 17-396) with 2 no. semi-detached houses (Type B) on site plots 56 and 56ADecision record indexed
Construct a single storey extension to the rear, alterations to the existing house layout, including the demolition of the existing sunroom and garden shed and all associated site worksDecision record indexed
Retain (a) living room extension off existing kitchen, (b) lounge area extension off existing lounge, (c) porch extension off existing porch, (d) existing shed in yard and all associated site worksDecision record indexed
Lismard Business Park, Downs, Portlaoise Co. Laois.
Construct a trade/retail warehouse facility and all ancillary site development works. The proposed development also provides for a sheltered outdoor garden centre display area at ground floor level with ancillary storage areas, office and staff welfare areas at ground and mezzanine floor levels. Ancillary site works include the provision of surface car parking and service areas, rooftop PV panels, fascia signage and bicycle parking facilities. Access to the proposed development will be provided via the internal road network of the Lismard Business Park.Decision record indexed
No.1 The Avenue, Mount Stewart, Portlaoise Co. Laois
Construct an extension to the rear and side of the existing property, conversion of the existing attic and all associated ancillary works.Decision record indexed
Consist of amendments to the previously approved development permitted under reg ref 18/450 to omit a pair of semi-detached 3 bed two storey houses on site no's 1 and 2 The Drive, Mount Stewart and replaced with a new 4 bed two storey detached house type F3 and including all associated site development works.Decision record indexed
Amend the number and dwelling mix of the partially constructed scheme as permitted under Laois County Council Reg. Ref. 18/450 as amended by Reg. Refs. 19/217 and 19/690. The scheme as permitted comprises 78 no. units providing 15 no. 4 bedroom units and 63 no. 3 bedroom units. The scheme as proposed comprises 75 no. dwellings providing 21 no. 3 bedroom units and 54 no. 4 bedroom units (including 20 no. constructed units comprising 15 no. 3 bedroom units and 5 no. 4 bedroom units); and all associated worksDecision record indexed
Construct a new recording studio inclusive of offices and a chapel, a new entrance onto Lismard Business Park and all associated site worksDecision record indexed
Construct single storey rear extension to the existing dwelling of 42msq Retention permission for single storey front / side extension (14msq) and single storey Garage (21.3msq) also to side and front elevation 3. All associate site worksDecision record indexed
To install sustainable energy compounds to host 2 no. LPG tank and 5 no. modular heat pumps, and all associated site development works.Decision record indexed
Portlaoise Educate Together Summerhill Downs, Stradbally Road Portlaoise, Co. Laois
Carry out development which will consist of the installation of a sustainable energy compound to host 6 no. modular heat pumps, and all associated site development works.Decision record indexed
Retain existing shed to the side of the existing dwelling, existing second floor storage room and 4 number roof lights to the rear of the extension dwellingDecision record indexed
For revised changes to previously permitted development granted under PL. 19/727 on a site measuring c.0.729 Ha. The revised development will consist of: 20 No. residential units (comprising 8 No. two-storey semi-detached dwellings (4 No. 4 -bedroom houses and 4 No. 3 -bedroom houses) and 12 No. apartments provided in 1 No. three storey block (4 No. 3 bedroom apartments and 8 No. 3 bedroom duplex apartments), ancillary car-parking spaces, cycle parking, pedestrian accesses, hard and soft landscaping, bin storage, boundary treatments and all associated site development works above and below groundDecision record indexed
Development at Summerhill, Portlaoise, Co. Laois on a site measuring c.3.594 Ha. The site is bounded to the north by Summerhill Lane, to the south and west by the Portlaoise Southern Circular Road and to the east by the rear gardens of dwellings along Summerhill Lane. The development will consist of 91 No. residential units (comprising 63 No. two-storey semi-detached and detached dwellings (18 No. 4 -bedroom houses, 44 No. 3 -bedroom houses and 1 No. 2-bedroom house) and 28 No. apartments provided in 2 No. three storey blocks (14 No. 1 bedroom apartments and 14 No. 3 bedroom apartments): ancillary car-parking spaces; cycle parking, pedestrian accesses, hard and soft landscaping, bin storage, boundary treatments, sub-station, solar panels, and all associated site development works above and below ground.Decision record indexed
Maryborough (Church of Ireland) National School, Summerhill Downs, Potlaoise
Install sustainable energy compounds to host an LPG tank and heat pump modules, and all associated site development works under a Renewable Energy Directive III (RED III) Development.Decision record indexed
Carry out revised development which will vary a portion of the previously approved application on a site measuring c.0.22 Ha. The revised development will consist of 8 no. residential units, all of which are two-storey semi-detached dwellings four-bedroom six person houses, ancillary car-parking spaces, pedestrian accesses, hard and soft landscaping, bin storage, boundary treatments and all associated site development works above and below groundDecision record indexed
For Retention for (a) conversion of attic space to storage space & (b) single storey rear extension and all associated site worksDecision record indexed
Renovate and extend house consisting of a first floor extension over existing single storey element at front, also single storey extensions to both sides including a velux window in roof and all associated site worksDecision record indexed
Alter elevations of existing commercial unit to include a new parapet cladding structure, new entrance to building, additional window openings and overhead roller doors. Permission is also sought for new boundary treatment and all associated site worksDecision record indexed