Planning records
Showing 1-3 of 3 public recordsGenvest ULC intend to apply for permission for development at this 3.0453 Ha site to the west of Stockhole Lane/Clonshaugh Road, Clonshaugh, Co. Dublin. The lands are generally bound to the north and west by undeveloped lands, to the south by Circle K Petrol Station and Holiday Inn, and to the east by Stockhole Lane/Clonshaugh Road and properties fronting thereto. The development will consist of the construction of a Light Industrial Development comprising 5 No. units (Unit Nos. 1-5) with ancillary offices and staff facilities and associated development as follows: Unit No. 1 will have a maximum height of 15 metres with a gross floor area of 1,217 sq m; Unit No. 2 will have a maximum height of 17 metres with a gross floor area of 1,363 sq m; Unit No. 3 will have a maximum height of 17 metres with a gross floor area of 1,976 sq m; Unit No. 4 will have a maximum height of 17 metres with a gross floor area of 1,854 sq m; and Unit No. 5 will have a maximum height of 11 metres with a gross floor area of 476 sq m. The development will also include: the provision of a multimodal entrance to the site from the Stockhole Lane Roundabout via an extended local access road; a pedestrian, cyclist and emergency vehicular entrance to the site from Stockhole Lane/Clonshaugh Road; pedestrian connections including an entrance gate to the adjoining Petrol Station; an internal estate road with internal access/egress spurs; footpaths, cycle paths and shared pedestrian and cycle paths; 114 No. car parking spaces (including accessible parking spaces); bicycle parking; loading bays/yards; level access goods doors; dock levellers; external canopies; bin stores; ESB substation and switchroom; boundary treatments; hard and soft landscaping; lighting; green walls; solar panels; signage; and all associated site and development works above and below ground. AI Rcvd 04/06/24 - SAI rcvd 07/06/2024
2 no single storey light industrial buildings (total floor area of 3,333 sq.m) accommodating 3 units including ancillary office space; internal site road (356m) with associated verges and footpaths accessed via internal distributor road; 84 no car parking spaces; 42 no. bicycle parking spaces; surface water attenuation; sub-station and switch room; relocation of overhead power lines; pedestrian entrance gate to adjoining petrol station site; totem signage at entrance to development; landscaping and boundary treatments; site works and services; all on a site of 1.94ha. AI received 06/09/21
Construction of a single storey office building of 134sq.m. gross floor area, located at ground floor level to the permitted decked car park. Mechanical plant will be provided above at deck level of the car park and will be screened by a pergola. The proposed development also includes the construction of a single storey building housing an ESB substation and switch room located adjacent to a reconfigured stair and lift core for the decked car park; a single storey plant room; and reconfiguration of car parking spaces (to include provision of 8 no. additional disabled spaces and reduction of 65 no. spaces), and landscaping to facilitate relocated main lift and stair core. Ancillary landscaping and reconfigured car parking layout at ground and upper floor level of the decked car park is also included, alongside all associated infrastructure works, all relating to a permitted hotel under planning Reg. Ref. F08A/1305 (ABP Ref: PL06F.232704), as amended under Reg. Ref. F17A/0748.